1.9km |
18/10/2024 |
N/A |
Unit 28 Lough Sheever Corporate Park , Robinstown , Mullingar |
construction of a 142.5 sq.m single story extension to the existing Value Centre facility to provide protection from the weather while loading and unloading goods ... login required. |
Details... |
1.8km |
03/10/2024 |
N/A |
Site 38 Lough Sheever Corporate Park , Robinstown , Mullingar Co.Westmeath |
development which will consist of:
(a) The construction of a three-storey, multiple occupant building, capable of accommodating various enterprise users. The office use will be as described under class 3 of article 10 part 4 of the 2001 planning and development regulations.
(b) Connection to existing services within the estate including foul, watermain an... login required. |
Details... |
2.7km |
26/09/2024 |
CONDITIONAL |
7 Gort Na Dtobar , Irishtown , Mullingar |
new detached garage for ancillary use to the dwelling house with all services and site works... login required. |
Details... |
2.7km |
26/09/2024 |
CONDITIONAL |
10 Gort NaDtobar , Irishtown , Mullingar |
new detached garage for ancillary use to the dwelling house with all services and site works... login required. |
Details... |
2.6km |
30/08/2024 |
CONDITIONAL |
16 Gort Na Dtobar , Irishtown , Mullingar |
development which will consist of the following works: New detached garage for ancillary use to the dwelling house with all services and site works... login required. |
Details... |
1.9km |
15/08/2024 |
N/A |
Unit 28 Lough Sheever Corporate Park , Robinstown , Mullingar |
construction of a 9.5m wide by 15m long loading bay canopy, to provide protection from thee elements while loading and unloading goods, to existing Value Centre facility... login required. |
Details... |
2.9km |
15/08/2024 |
CONDITIONAL |
Portnashangan , Multyfarnham , Mullingar |
the demolition of the existing front entrance porch, side lean-to shed and rear flat roof kitchen area and to construct in its place a new single storey pitched and flat roof extension to the rear, a new single storey pitched roof extension to the side, including intern... login required. |
Details... |
2.2km |
21/06/2024 |
REFUSED |
Irishtown , Mullingar , Co. Westmeath |
development which will consist of the construction of a part two-storey, part single storey detached dwelling, detached garage, installation of a proprietary wastewater treatment system and soil polishing filter, proposed entrance off the public road and all ancillary site works... login required. |
Details... |
1.3km |
05/06/2024 |
CONDITIONAL |
Culeenmore , Mullingar , Co. Westmeath |
development which will consist of the demolition of existing single storey extension, sunroom, roof to the rear, and construction of new single storey extensions to the side and rear, new first floor dormer extension to the rear, proposed internal alterati... login required. |
Details... |
2.7km |
04/06/2024 |
CONDITIONAL |
Site Number 11 , Irishtown , Mullingar |
Proposed Construction Of A Domestic Garage To Service Existing Dwelling House, And All Ancillary Works... login required. |
Details... |
510m |
16/05/2024 |
CONDITIONAL |
Cullenmore , Mullingar , Co Westmeath |
extension (312.8 sq m) to the North (rear) and West (side) of the existing club house and for alterations to all elevations. Alterations include changes to the roof type and an increase in ridge height from 7.455m to 7.65m, increase of eaves height from 4.734m to 5.027m . A new butterfly rooflight is also propose... login required. |
Details... |
510m |
02/05/2024 |
N/A |
Cullenmore , Mullingar , Co Westmeath |
extension (312.8 sq m) to the North (rear) and West (side) of the existing club house and for alterations to all elevations. Permission is also sought to decomm... login required. |
Details... |
520m |
24/04/2024 |
CONDITIONAL |
Cullion GAA Club , Cullionmore , Mullingar |
construction of a new Children's Playground and all associated ancillary site services ... login required. |
Details... |
2.7km |
18/04/2024 |
N/A |
Site Number 11 , Irishtown , Mullingar |
Proposed Construction Of A Domestic Garage To Service Existing Dwelling House, And All Ancillary Works... login required. |
Details... |
520m |
15/04/2024 |
N/A |
Cullion GAA Club , Cullionmore , Mullingar Co.Westmeath |
construction of a new children's playground and all associated ancillary site services ... login required. |
Details... |
850m |
14/03/2024 |
CONDITIONAL |
Lakeview Cullionmore , Mullingar , Co. Westmeath |
construction of a storey & half extension (86.4sqm) to the rear (east) elevation, of the existing dwelling and renovation/ alteration works to the existing dwelling, which include relocating the front door and window... login required. |
Details... |
2.6km |
08/12/2023 |
CONDITIONAL |
Loughanstown , Knockdrin , Mullingar |
development which will consist of a new two storey dwelling house with single storey flat roof section to rear, detached double garage with fuel storage, a new s... login required. |
Details... |
2.6km |
25/07/2023 |
CONDITIONAL |
Site No.2 , Irishtown , Mullingar |
changes to dwelling house (Type D) as previously granted under Pl.Ref.16/6001 to include the following revisions:
The width of the garage and bedroom 3 located within the roof space to be increased, minor dimensio... login required. |
Details... |
2.7km |
20/06/2023 |
CONDITIONAL |
Irishtown , Mullingar , County Westmeath |
development which will consist of the construction of a new covered ancillary entrance to the front/ Northwest of the dwelling, new one-storey extensions to the rear/ Southeast... login required. |
Details... |