930m |
05/07/2023 |
REFUSED |
DERRYARKIN , RHODE , CO OFFALY |
ROCK EXTRACTION FROM AN AREA OF LAND CONSISTING OF 3.6 HECTARES TO A LEVEL OF 54.5 METRES ABOVE ORDNANCE DATUM, RESTORATION OF AREA ON COMPLETION OF EXTRACTION AND ALL ASSOCIATED... login required. |
Details... |
2.4km |
13/06/2023 |
N/A |
KNOCKDRIN AND DERRYGREENAGH TOWNSLANDS , RHODE , CO OFFALY |
TO IMPORT SOIL AND STONE (EWC CLASS 17 05 04) NOT EXCEEDING 25,000 TONS OVER A PERIOD OF 2 YRS FOR THE PURPOSE OF RAISING EXISTING GROUND LEVELS NOT EXCEEDING 1.2M IN HEIGHT, INSTALLATION OF NEW DRAINAGE OVER 2.4HA WITH REST... login required. |
Details... |
3km |
12/06/2023 |
CONDITIONAL |
BUNSALLAGH , CROGHAN , TULLAMORE CO. OFFALY |
FOR THE CONSTRUCTION OF A NEW DWELLING HOUSE, NEW VEHICULAR ENTRANCE, NEW GARAGE, NEW EFFLUENT TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.4km |
23/05/2023 |
N/A |
KNOCKDRIN , RHODE , CO. OFFALY |
IMPORTATION OF SOIL AND STONE ( EWC CLASS 17 05 04 ) NOT EXCEEDING 25,000 TONS OVER A PERIOD OF 2 YRS FOR THE PURPOSE OF RAISING EXISTING GROUND LEVELS NOT EXCEEDING 1.2M IN HEIGHT, INSTALLATION OF NEW DRAINAGE OVER 2.4HA WITH R... login required. |
Details... |
2.4km |
11/04/2023 |
CONDITIONAL |
BALLYFORE , CROGHAN , CO. OFFALY |
CONSTRUCTION OF A SINGLE STOREY DWELLING AND A DOMESTIC GARAGE AND A WASTEWATER TREATMENT SYSTEM AND A NEW SITE ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.4km |
24/03/2023 |
N/A |
BALLYFORE , CROGHAN , CO. OFFALY |
THE CONSTRUCTION OF A SINGLE STOREY DWELLING AND A DOMESTIC GARAGE AND A WASTE WATER TREATMENT SYSTEM AND A NEW SITE ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
3km |
23/12/2022 |
N/A |
Farthingstown Townland , Mongagh Bridge Rochfortbridge , Co. Westmeath |
•An overall application area of c. 58.7 hectares;
•Phased extraction of sand and gravel (wet working) over an area of c. 51.3 hectares with processing that includes crushing, washing (closed water recycling system with associated silt storage lagoons), screening and all ancillary works and structures;
•Site facilities consisting of aggregate processing plant, weighbridge office/toilet (21m²), welfare facility including canteen, cloakroom and toilets/showers (47.8m²), associated waste water treatment unit, bunded fuel storage, hydrocarbon interceptor, weighbridge, wheelwash, p... login required. |
Details... |
710m |
21/09/2022 |
CONDITIONAL |
DERRYARKIN , RHODE , CO. OFFALY |
THE DEVELOPMENT WILL CONSIST OF THE DEMOLITION OF EXISTING AGRICULTURAL SHEDS AND STRUCTURES ON-SITE AND THE CONSTRUCTION AND OPERATION OF A MATERIALS RECOVERY FACILITY FOR THE ACCEPTANCE AND PROCESSING OF UP TO 90,000 TONNES PER ANNUM OF HOUSEHOLD, COMMERCIAL AND INDUSTRIAL (C&I), AND CONSTRUCTION AND DEMOLITION (C&D) WASTE. ELEMENTS OF THE PROPOSED DEVELOPMENT INCLUDE THE FOLLOWING. (1) THE DEMOLITION OF ALL EXISTING SITE AGRICULTURAL SHEDS AND STRUCTURES ON-SITE (WHICH COVER AN AREA OF 1,417 M2). (2) THE CONSTRUCTION AND OPERATION OF A MATERIALS RECOVERY FACILITY, COMPRISING: (A) A SITE ENTRANCE, (B) A WEIGHBRIDGE, (C)TRUCKING SET DOWN AND PARKING AREAS, (D) STAFF PARKING, COMPRISING 24 PARKING SPACES INCLUDING DISABLED PARKING AND EV CHARGING, (E) A CONCRETE YARD AREA, (F) A FUEL STORAGE AREA, (G) EXTERNAL WASTE STORAGE BAYS, (H) SKIP / BIN STORAGE AREAS, (I) A PERIMETER BOUNDARY WALL (4 M IN HEIGHT) AND PERIMETER FENCING (2.1 M IN HEIGHT), (J) A STORMWATER DRAINAGE AND ATTENUATION SYSTEM, (K) AN ADMINISTRATION TWO-STOREY BUILDING ... login required. |
Details... |
2.8km |
20/09/2021 |
CONDITIONAL |
BALLYBEG , CROGHAN , CO. OFFALY |
THE CONSTRUCTION OF A DWELLING AND A DOMESTIC GARAGE AND A WASTEWATER TREATMENT SYSTEM AND A VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
640m |
27/04/2021 |
CONDITIONAL |
DERRYARKIN & BUNSALLAGH TOWNLANDS , RHODE , CO. OFFALY |
A 23 YEAR PERMISSION FOR A 44.0 HECTARE EXTENSION TO AN EXISTING AUTHORISED SAND AND GRAVEL PIT COMPRISING OF THE FOLLOWING: AN EXTRACTION AREA OF 43.8 HA.; REMOVAL OF 10.2 HA. OF COMMERCIAL FORESTRY AND REMOVAL OF OVERBURDEN MATERIAL FROM THE REMAINING 33.6 HECTARES OF THE PROPOSED EXTRACTION AREA; EXTRACTION OF SAND AND GRAVEL BY MECHANICAL MEANS; UPGRADING OF TH... login required. |
Details... |