430m |
13/09/2024 |
N/A |
BALLYCON , MOUNTLUCAS , CO. OFFALY |
CHANGE OF USE OF TWO NUMBER EXISTING AGRICULTURAL STORAGE BUILDINGS TO COMMERCIAL UNITS FOR WAREHOUSE AND FABRICATION PURPOSES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
320m |
01/12/2023 |
CONDITIONAL |
Ballycon , Daingean , CO. OFFALY |
A. a new single-storey extension to the east side of the existing house.
B. Retention Permission Sought for the partial conversion of the attic area into a storage area
C. All associated Site works... login required. |
Details... |
320m |
26/11/2023 |
N/A |
Ballycon , Daingean , CO. OFFALY |
A. a new single-storey extension to the east side of the existing house. B. Retention Permission Sought for the partial conversion of the attic area into a storage area C. All associated Site works... login required. |
Details... |
1.8km |
13/11/2023 |
CONDITIONAL |
National Construction Training Centre , Drumcraw or Mountlucas / Derrycricket , Daingean Co. Offaly |
(A) The construction of Phase 1 of the Modern Methods of Construction (MMC) Demonstration Park consisting of 5no. demonstration structures which shall be used for training and research purposes. They shall comprise of: 1no. two storey Type A Structure; 1no. two/three/four storey Type B/C/D Structure; 1no. one/two storey Type E/F Structure; 1no. two storey Type G Structure; and 1no. two storey T... login required. |
Details... |
1.8km |
23/10/2023 |
N/A |
National Construction Training Centre , Drumcraw or Mountlucas / Derrycricket , Daingean Co. Offaly |
(A) The construction of Phase 1 of the Modern Methods of Construction (MMC) Demonstration Park consisting of 5no. demonstration structures which shall be used for training and research purposes. They shall comprise of: 1no. two storey Type A Structure; 1no. two/three/four storey Type B/C/D Structure; 1no. one/two storey Type E/F Structure; 1no. two storey Type G Structure; and 1no. two storey... login required. |
Details... |
2.3km |
15/09/2022 |
CONDITIONAL |
NEWTOWN , RHODE , CO. OFFALY |
THE CONSTRUCTION OF A DWELLING AND A DOMESTIC GARAGE AND A WASTE WATER TREATMENT SYSTEM AND A VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.6km |
29/07/2022 |
CONDITIONAL |
C.5.14HA SITE WITHIN THE MOUNT LUCAS WIND FARM , IN THE TOWNLAND OF DRUMCAW OR , MOUNTLUCAS CO. OFFALY |
A 2MW PILOT SCALE HYDROGEN ELECTROLYSIS PLANT WHICH COMPRISES; AN ELECTROLYSER CONTAINED WITHIN A STANDARD ISO CONTAINER (C. 12.2M IN LENGTH, C. 2.4M IN WIDTH AND C. 3.3M IN HEIGHT), 3 NO. HIGH PRESSURE HYDROGEN STORAGE UNITS, 1 NO HYDROGEN COMPRESSION SYSTEM, 1 NO GENERATOR, 2 NO SUBSTATION/TRANSFORMER STRUCTURES AND A MEDIUM VOLTAGE UNDERGROUND CABLE CONNECTION TO THE NEAREST WIND TURBINE C. 600M TO THE WEST. THE HYDROGEN ELECTROLYSIS PLANT WILL BE SUPPORTED BY THE FOLLOWING INFRASTRUCTURE; HYDROGEN ANALYSER CONTAINER, FIREWALL (MAXIMUM HEIGHT 3.6M), UNDERGROUND FIBRE OPTIC CABLING, 2 NO. 10 CUBIC M... login required. |
Details... |
1.6km |
15/07/2022 |
N/A |
C. 5.14 HA SITE WITHIN THE MOUNT LUCAS WIND FARM , IN THE TOWNLAND OF DRUMCAW OR MOUNTLUCAS , CO.OFFALY |
A 2MW PILOT SCALE HYDROGEN ELECTROLYSIS PLANT WHICH COMPRISES; AN ELECTROLYSER CONTAINED WITHIN A STANDARD ISO CONTAINER (C. 12.2M IN LENGTH, C. 2.4M IN WIDTH AND C. 3.3M IN HEIGHT), 3 NO. HIGH PRESSURE HYDROGEN STORAGE UNITS, 1 NO HYDROGEN COMPRESSION SYSTEM, 1 NO GENERATOR, 2 NO SUBSTATION / TRANSFORMER STRUCTURES AND A MEDIUM VOLTAGE UNDERGROUND CABLE CONNECTION TO THE NEAREST WIND TURBINE C. 600M TO THE WEST. THE HYDROGEN ELECTROLYSIS PLANT WILL BE SUPPORTED BY THE FOLLOWING INFRASTRUCTURE; HYDROGEN ANALYSER CONTAINER, FIREWALL (MAXIMUM HEIGHT 3.6M), UNDERGROUND FIBRE OPTIC CABLING, 2 NO. 10 CUBIC M... login required. |
Details... |
1.5km |
01/07/2022 |
REFUSED |
ESKER MORE , MOUNT LUCAS , TULLAMORE CO. OFFALY |
A SMALL QUARRY/BORROW PIT FOR THE EXTRACTION OF C.200,000 TONNES OF SAND AND GRAVEL ON C. 3.2 HA OF LANDS AT ESKER MORE, MOUNT LUCAS, TULLAMORE, CO. OFFALY. THE DEVELOPMENT WILL INCLUDE A SITE OFFICE (PORTACABIN), TOILET AND HOLDING TANK, MOBILE WHEELWASH, MOBILE SCREENING AND CRUSHING PLANT, CAR PARKING, TEMPORARY OVERBURDEN STORAGE, OTHER ANCILLARIES... login required. |
Details... |
1.1km |
14/04/2022 |
CONDITIONAL |
MOUNTLUCAS , DAINGEAN , CO. OFFALY |
(A) 1 NO. NEW BUNGALOW TYPE DWELLING, (B) 1 NO. NEW DOMESTIC GARAGE (C) INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM (D) VEHICULAR ENTRANCE (E) NEW LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
770m |
08/07/2021 |
CONDITIONAL |
BALLYCON , DAINGEAN , CO. OFFALY |
CONSTRUCTION OF A DWELLING AND A DOMESTIC GARAGE AND A WASTEWATER TREATMENT SYSTEM AND A VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
630m |
02/07/2021 |
CONDITIONAL |
ESKER MORE DAINGEAN CO. OFFALY , AND , BALLYCON DAINGEAN CO. OFFALY |
THE IMPORTATION OF INERT SOIL FOR THE PURPOSES OF INFILLING LAND FOR AGRICULTURAL USE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
770m |
09/06/2021 |
N/A |
BALLYCON , DAINGEAN , CO. OFFALY |
CONSTRUCTION OF A DWELLING AND A DOMESTIC GARAGE AND A WASTEWATER TREATMENT SYSTEM AND A VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
630m |
06/05/2021 |
N/A |
ESKERMORE , DAINGEAN , CO. OFFALY |
THE IMPORTATION OF INERT SOIL FOR THE PURPOSES OF INFILLING LAND FOR AGRICULTURAL USE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.4km |
23/04/2021 |
CONDITIONAL |
DRUMCAW OR MOUNTLUCAS , DERRYCRICKET BRACKAGH , TULLAMORE CO. OFFALY |
EXISTING FREESTANDING STORAGE CONTAINERS. PERMISSION FOR (1) CONTINUANCE OF EXISTING AQUACULTURE FARM INCORPORATING FOUR FISH PONDS, AQUAPONICS POND, ALL CONNECTED USING INTERLINKING OPEN CHANNELS AND ASSOCI... login required. |
Details... |
2.4km |
29/03/2021 |
N/A |
DRUMCRAW OR MOUNTLUCAS DERRYCRICKET BRACKAGH , TULLAMORE , CO. OFFALY |
(1) CONTINUANCE OF EXISTING AQUACULTURE FARM INCORPORATING FOUR FISH PONDS, AQUAPONICS POND, ALL CONNECTED USING INTERLINKING OPEN CHANNELS AND ASSOCIATED SITE DEVELOPMENT WORKS, AS PERMITTED UNDER ... login required. |
Details... |
2.7km |
15/03/2021 |
CONDITIONAL |
NEWTOWN , RHODE , CO. OFFALY |
MACHINERY STOREY SHED AND ALL ASSOCIATED SITE WORKS AND PERMISSION FOR THE CONSTRUCTION OF AN EXTENSION TO AN EXISTING DWELLING AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.7km |
24/02/2021 |
N/A |
NEWTOWN , RHODE , CO. OFFALY |
THE CONSTRUCTION OF AN EXTENSION TO AN EXISTING DWELLING AND CONSISTS OF A MACHINERY STORAGE SHED AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |