1.8km |
29/07/2024 |
N/A |
in the townlands of Clonin , & Coolcor , Rhode Co. Offaly |
development of a 22-hectare site. The proposed development comprises (i) two (2no.) air dome structures for the storage of carbon dioxide at atmospheric pressure (each 500m x 120m x 34m high) and associated cooling, compression, pumping and power generation equipment and machinery (ii) a single-storey storage and ... login required. |
Details... |
1.6km |
08/07/2024 |
CONDITIONAL |
Knockdrin , Rhode , Co.Offaly |
construction a single dwelling house, domestic garage and septic tank with percolation area and all associated site works... login required. |
Details... |
2.2km |
08/07/2024 |
CONDITIONAL |
Coolcor , Rhode , Co. Offaly |
the construction of a storey and a half type dwelling house, a detached garage, vehicular entrance, installation of an effluent treatment system/polishing filter and any other associated site works... login required. |
Details... |
2.2km |
08/07/2024 |
CONDITIONAL |
Coolcor , Rhode , Co. Offaly |
the construction of a storey and a half type dwelling house, a detached garage, vehicular entrance, installation of an effluent treatment system / polishing filter and any other associated site works.... login required. |
Details... |
1.6km |
04/07/2024 |
N/A |
Knockdrin , Rhode , Co.Offaly |
to construct a single dwelling house, domestic garage and septic tank with percolation area and all associated site works... login required. |
Details... |
1.8km |
08/04/2024 |
CONDITIONAL |
Knockdrin , Rhode , Co. Offaly |
the erection of 3 log cabins, a vehicular entrance at the public road, installation of an effluent treatment system/polishing filter and any other associated site works... login required. |
Details... |
2km |
07/03/2024 |
CONDITIONAL |
Clonin Rhode , Co. Offaly , Ireland |
a ten-year permission for construction of a new site entrance and access track to serve the already consented development refs; PL2/16/246 & 19/194... login required. |
Details... |
2km |
16/02/2024 |
N/A |
Clonin , Co. Offaly , Ireland |
a ten-year permission for construction of a new site entrance and access track to serve the already consented development refs; PL2/16/246 & 19/194.... login required. |
Details... |
1.8km |
12/12/2023 |
REFUSED |
Knockdrin , Rhode , Co. Offaly |
the erection of 3 log cabins, a vehicular entrance at the public road, installation of an effluent treatment system / polishing filter and any other associated site works.... login required. |
Details... |
2km |
08/11/2023 |
N/A |
CLONIN , CO. OFFALY |
A TEN- YEAR LIFECYCLE FOR CONSTRUCTION OF A NEW SITE ENTRANCE AND ACCESS TRACK TO SERVE THE ALREADY CONSENTED DEVELOPMENT REFS; PL2/16/246 & 19/194... login required. |
Details... |
2.6km |
05/07/2023 |
REFUSED |
DERRYARKIN , RHODE , CO OFFALY |
ROCK EXTRACTION FROM AN AREA OF LAND CONSISTING OF 3.6 HECTARES TO A LEVEL OF 54.5 METRES ABOVE ORDNANCE DATUM, RESTORATION OF AREA ON COMPLETION OF EXTRACTION AND ALL ASSOCIATED... login required. |
Details... |
1.8km |
13/06/2023 |
REFUSED |
KNOCKDRIN AND DERRYGREENAGH TOWNSLANDS , RHODE , CO OFFALY |
TO IMPORT SOIL AND STONE (EWC CLASS 17 05 04) NOT EXCEEDING 25,000 TONS OVER A PERIOD OF 2 YRS FOR THE PURPOSE OF RAISING EXISTING GROUND LEVELS NOT EXCEEDING 1.2M IN HEIGHT, INSTALLATION OF NEW DRAINAGE OVER 2.4HA WITH REST... login required. |
Details... |
1.8km |
23/05/2023 |
N/A |
KNOCKDRIN , RHODE , CO. OFFALY |
IMPORTATION OF SOIL AND STONE ( EWC CLASS 17 05 04 ) NOT EXCEEDING 25,000 TONS OVER A PERIOD OF 2 YRS FOR THE PURPOSE OF RAISING EXISTING GROUND LEVELS NOT EXCEEDING 1.2M IN HEIGHT, INSTALLATION OF NEW DRAINAGE OVER 2.4HA WITH R... login required. |
Details... |
1.9km |
21/12/2022 |
CONDITIONAL |
DERRYIRON 110KV SUBSTATION , CLONIN RHODE , CO. OFFALY |
EIRGRID PLC (WITH THE CONSENT AND APPROVAL OF THE ELECTRICITY SUPPLY BOARD (ESB)), INTENDS TO APPLY FOR PERMISSION FOR DEVELOPMENT AT SITE OF APPROXIMATELY 1 HECTARE AT DERRYIRON 110KV SUBSTATION, CLONIN, RHODE, CO. OFFALY. DEVELOPMENT CONSISTING OF WORKS TO UPGRADE THE EXISTING SUBSTATION INCLUDING: THE INSTALLATION OF ADDITIONAL AIR INSULATED SWITCHGEAR ELECTRICAL APPARATUS (APPROXIMATELY 7M IN HEIGHT) TO FACILITATE THE PROVISION OF A 110KV BUSBAR; INSTALLATION OF 3 NO. ADDITIONAL BAYS (EACH CONSISTING OF BUSBAR DISCONNECTS, SECTIONALISERS, CIRCUIT BREAKERS, CURRENT TRANSFORMERS, VOLTAGE TRANSFORMERS, LINE TRAPS, COUPLING CAPACITORS AND OTHER ELECTRICAL APPARATUS); AN EXTENSION TO THE NORTH OF THE EXISTING CONTROL BUILDING (APPROXIMATELY 73 SQUARE METERS) TO PROVIDE ACCOMMODATION FOR CA... login required. |
Details... |
2.8km |
21/09/2022 |
CONDITIONAL |
DERRYARKIN , RHODE , CO. OFFALY |
THE DEVELOPMENT WILL CONSIST OF THE DEMOLITION OF EXISTING AGRICULTURAL SHEDS AND STRUCTURES ON-SITE AND THE CONSTRUCTION AND OPERATION OF A MATERIALS RECOVERY FACILITY FOR THE ACCEPTANCE AND PROCESSING OF UP TO 90,000 TONNES PER ANNUM OF HOUSEHOLD, COMMERCIAL AND INDUSTRIAL (C&I), AND CONSTRUCTION AND DEMOLITION (C&D) WASTE. ELEMENTS OF THE PROPOSED DEVELOPMENT INCLUDE THE FOLLOWING. (1) THE DEMOLITION OF ALL EXISTING SITE AGRICULTURAL SHEDS AND STRUCTURES ON-SITE (WHICH COVER AN AREA OF 1,417 M2). (2) THE CONSTRUCTION AND OPERATION OF A MATERIALS RECOVERY FACILITY, COMPRISING: (A) A SITE ENTRANCE, (B) A WEIGHBRIDGE, (C)TRUCKING SET DOWN AND PARKING AREAS, (D) STAFF PARKING, COMPRISING 24 PARKING SPACES INCLUDING DISABLED PARKING AND EV CHARGING, (E) A CONCRETE YARD AREA, (F) A FUEL STORAGE AREA, (G) EXTERNAL WASTE STORAGE BAYS, (H) SKIP / BIN STORAGE AREAS, (I) A PERIMETER BOUNDARY WALL (4 M IN HEIGHT) AND PERIMETER FENCING (2.1 M IN HEIGHT), (J) A STORMWATER DRAINAGE AND ATTENUATION SYSTEM, (K) AN ADMINISTRATION TWO-STOREY BUILDING ... login required. |
Details... |
1.3km |
30/08/2022 |
CONDITIONAL |
BALLYBEG BOG , DERRYIRON , CO. OFFALY |
CONTINUED USE OF AN EXISTING GUYED WIND MONITORING MAST, WITH INSTRUMENTS, 100M IN HEIGHT FOR A FURTHER PERIOD OF THREE YEARS. THE PURPOSE OF THE MAST IS TO ASSESS THE SUITABILITY OF ... login required. |
Details... |
1.3km |
09/08/2022 |
N/A |
BALLYBEG BOG , DERRYIRON , CO. OFFALY |
CONTINUED USE OF AN EXISTING GUYED WIND MONITORING MAST, WITH INSTRUMENTS, 100M IN HEIGHT FOR A FURTHER PERIOD OF THREE YEARS. THE PURPOSE OF THE MAST IS TO ASSESS THE SUITABILITY OF ... login required. |
Details... |
180m |
09/11/2021 |
N/A |
DERRYIRON , RHODE , CO. OFFALY |
1) CONSTRUCTION OF A NEW FARM BUILDING FOR THE HOUSING OF LIVESTOCK OVER AND INCLUDING AN UNDERGROUND SLATTED SLURRY STORAGE TANK, COMPLETED WITH ASSOCIATED SITEWORKS; 2) CONSTRUCTION OF A NEW FARM BUILDING FOR THE HOUSING OF LIVESTOCK INCLUDING... login required. |
Details... |
2km |
23/09/2021 |
CONDITIONAL |
DERRYIRON , RHODE , CO. OFFALY |
(A) 1 NO. NEW BUNGALOW TYPE DWELLING, (B) 1 NO. NEW DOMESTIC GARAGE (C) INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM (D) VEHICULAR ENTRANCE (E) NEW LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |