800m |
12/11/2024 |
N/A |
Loughabor , Athy , Co. Kildare |
for (1) the raised roof to the side extension of the dwelling with first floor gable window and additional habitable space (2) the domestic use garage (3) revised site boundaries... login required. |
Details... |
1.1km |
12/11/2024 |
N/A |
Boley Little , Fontstown , Athy |
for a granny flat to the side of existing dwelling and all ancillary siteworks... login required. |
Details... |
780m |
07/11/2024 |
N/A |
Loughabor , Athy , Co. Kildare |
for (1) the raised roof to the side extension of the dwelling (2) the domestic use garage (3) revised site boundaries... login required. |
Details... |
1.1km |
07/11/2024 |
N/A |
Boley Little , Fontstown , Athy |
for a granny flat to the side of the existing dwelling and all ancillary siteworks... login required. |
Details... |
2.5km |
01/10/2024 |
REFUSED |
Balkinstown , Nurney , Co. Kildare |
For Planning Permission sought Bungalow Type Dwelling with Effluent Treatment System & Percolation Area with Vehicular Entrance and all associated site works.... login required. |
Details... |
1.9km |
27/09/2024 |
CONDITIONAL |
Skerries North , Skerries , Athy |
for 1. single storey extension to front of existing dwelling 2. Pitched roof in place of flat roof over extension previously granted under Planning Ref. 76/97 3. Single storey extension to rear of existing shed 4. All ancillary site works... login required. |
Details... |
1.9km |
24/09/2024 |
N/A |
Skerries North , Skerries , Athy |
for 1. Single storey extension to front of existing dwelling 2. Pitched roof in place of flat roof over extension previously granted under Planning Ref. 76/97
3. Single storey extension to rear of existing shed 4. All ancillary site works... login required. |
Details... |
2.2km |
17/09/2024 |
N/A |
Fontstown Lower , Athy , Co. Kildare |
for the construction of a single-story bungalow, upgrade existing agricultural entrance to recessed entrance, single storey dometic garage, secondary effluent treatment system and all associated site works... login required. |
Details... |
1.9km |
16/09/2024 |
N/A |
Skerries North , Skerries , Athy |
for 1. Single storey extension to front of existing dwelling 2. Pitched roof in place of flat roof over extension previously granted under Planning Ref. 76/97
3. Single storey extension to rear of existing shed 4. All ancillary site works... login required. |
Details... |
1.4km |
11/07/2024 |
CONDITIONAL |
Ardellis , Athy , Co. Kildare |
Development will consist of the construction of internal agricultural farm roadway and all associated site works.... login required. |
Details... |
2.7km |
08/07/2024 |
N/A |
591 Balkinstown , Nurney , Co. Kildare |
for alterations to the existing two-storey dwelling. Works include the demolition of an existing front porch and an existing extension to the rear. A modified window on the front elevation. Ne... login required. |
Details... |
2.7km |
27/06/2024 |
N/A |
591 Balkinstown , Nurney , Co. Kildare |
for alterations to the existing two-storey dwelling. Works include the demolition of an existing front porch and an existing extension to the rear. A modified window on the front elevation. Ne... login required. |
Details... |
2.7km |
11/03/2024 |
REFUSED |
591 Balkinstown , Nurney , Co. Kildare |
alterations and partial demolition to the existing 181m2 dwelling and the construction of a 257m2 extension, an upgraded effluent treatment system and site entrance and all associated site works... login required. |
Details... |
2.7km |
08/03/2024 |
N/A |
591 Balkinstown , Nurney , Co. Kildare |
alterations and partial demolition to the existing 181m2 dwelling and the construction of a 257m2 extension, an upgraded effluent treatment system and site entrance and all associated site works... login required. |
Details... |
2.7km |
05/10/2023 |
CONDITIONAL |
Nurney , Co. Kildare |
a new single storey dwelling house, new domestic vehicular entrance, domestic garage, wastewater treatment system with polishing filter and all associated site works... login required. |
Details... |
1.1km |
22/09/2023 |
REFUSED |
Boley Little , Fontstown , Athy |
a serviced timber chalet used for habitable purpose for a period of 5 year so construction of previously approved family flat extension can be completed to the main dwelling ... login required. |
Details... |
1.5km |
12/09/2023 |
CONDITIONAL |
Gorteen Lower , Nurney , Co. Kildare |
new ancillary structures relating to the operating of the existing biogas facility as follows: 1. Biofilter & Air Scrubber (including exhaust stack affixed to existing reception building at max. height of 14m above ground level). 2. LPG Tanks Compound. 3. Enclosed Flare. 4. Provision of 3 No. Storage Digestors with gas storage domes (max. height c.13m). 5. Biogas Upgrader (including Absorption Column 15.257m and a Stripper Column 12.8m). 6. Comp... login required. |
Details... |
2.6km |
31/07/2023 |
REFUSED |
Balkinstown , Nurney , Co. Kildare |
Bungalow Type Dwelling with Effluent Treatment System & Percolation Area with Vehicular Entrance and all associated site works... login required. |
Details... |
1.9km |
24/07/2023 |
CONDITIONAL |
Millbridge , Boley Great , Nurney |
(a) renovation and amendments to existing cottage including new roof and window / door arrangements, internal modifications and overall energy retrofit / uplift,
(b) construction of a storey and a half type extension with single storey lin... login required. |
Details... |