530m |
14/08/2024 |
CONDITIONAL |
Back Moone , Moone , Co. Kildare |
for permission to erect a garden hobby room and all associated site works... login required. |
Details... |
2.7km |
30/04/2024 |
CONDITIONAL |
Burtown House , Burtown Little , Athy |
Burtown Eco Cabins - construction of 9 short-term tourism accommodation cabins, new sewage treatment system, and all necessary ancillary works to facilitate this development... login required. |
Details... |
2.2km |
27/04/2024 |
REFUSED |
Mullamast , Ballitore , Co. Kildare |
for the construction of single story dwelling , Waste Water Treatment System, Well and all associated site works... login required. |
Details... |
2.6km |
16/04/2024 |
N/A |
Burtown House , Burtown Little , Athy |
Development will consist of Burtown Eco Cabins - Construction of 9 short term tourism accommodation cabins, new sewage treatment system, and all necessary ancillary works to facilitate this development.... login required. |
Details... |
2.2km |
08/04/2024 |
N/A |
Mullamast , Ballitore , Co. Kildare |
development will consist of the construction of single story dwelling , Waste Water Treatment System, Well and all associated site works... login required. |
Details... |
1.2km |
27/03/2024 |
CONDITIONAL |
Moone , Athy , Co. Kildare |
construction of a over-ground slurry tank ... login required. |
Details... |
2.2km |
18/03/2024 |
N/A |
Mullamast , Ballitore , Co Kildare |
construction of a single storey dwelling with Waste Water Treatment System , Well and all associated site works... login required. |
Details... |
2km |
04/03/2024 |
CONDITIONAL |
Ballitore , Athy , Co. Kildare |
for constructing 29 dwellings consisting of 8 no. apartments in 2 No. 2-storey blocks, 8 No. terraced houses in 2 No. 2-storey terrace blocks, 10 No. semi-detached 2-storey houses, and 3 No. detached houses. The development also consists of a new recessed vehicular entrance, pro... login required. |
Details... |
1.9km |
26/02/2024 |
CONDITIONAL |
Fullers Court Road , Ballitore , Co. Kildare |
Planning permission sought for bungalow, domestic garage, connection to all services, new entrance through existing estate and ancillary works... login required. |
Details... |
1.9km |
01/02/2024 |
N/A |
Fullers Court Road , Ballitore , Co. Kildare |
Planning permission sought for bungalow, domestic garage, connection to all services, new entrance through existing estate and ancillary works... login required. |
Details... |
950m |
29/01/2024 |
CONDITIONAL |
Moone , Athy , Co. Kildare |
the development of a new commercial building including a ground floor workshop, product assembly area and office area along with first floor storage area and separate ground floor agricultural/domestic storage area. ... login required. |
Details... |
900m |
22/12/2023 |
N/A |
Moone , Athy , Co Kildare |
a new building including a ground floor workshop, product assembly area and office area along with first floor storage area and separate ground floor storage area. Demolition of existing... login required. |
Details... |
2.7km |
03/11/2023 |
CONDITIONAL |
The Old Rectory , TImolin , Co. Kildare |
for the erection of a slatted lieback shed, manure pit, concrete yards, and ancillary works... login required. |
Details... |
1.7km |
29/05/2023 |
N/A |
Timolin , Moone , Co Kildare |
a bungalow type dwelling & domestic garage with effluent treatment system a& percolation area alterations to existing vehicular entrance and all associated site works... login required. |
Details... |
2.6km |
15/05/2023 |
CONDITIONAL |
Belan Avenue , Moone , Athy |
the erection of a slatted cattle shed, a roofed handling area, a hay and straw store and improvements to existing farmyard entrance with all associated facilities and site works... login required. |
Details... |
2.5km |
05/05/2023 |
CONDITIONAL |
Belan Avenue , Belan , Moone |
the construction of a single storey detached split level bungalow, upgrade existing agricultural entrance to recessed entrance, septic tank and percolation area and all associated site works... login required. |
Details... |
1.8km |
26/09/2022 |
CONDITIONAL |
Fuller's Court Road , Ballitore , Co. Kildare |
constructing 16 No. dwellings consisting of 4 No. 2 storey 4-bed semi-detached houses, 10 No. 2 storey 3-bed semi-detached houses, 2 No. 2 storey 2-bed semi detached houses, connection to foul sewer granted permission under Pl. Ref. 20/156 and all associated ancillary siteworks. A Natura Impact Statement (NIS) accompanies this application . Revised by Significant Further Information which consists of 1) alterations to site layout and 2) alterations to housing mix to now consist of 2 No.2 storey 4-bed detached houses and 1... login required. |
Details... |
1.8km |
23/09/2022 |
CONDITIONAL |
Portersize , Ballitore , Co. Kildare. |
(a) Proposed new dormer dwelling with single storey element; (b) Domestic garage; (c) New double recessed vehicle entrance; (d) Treatment system and percolation area along with all associated site development and facilitating works ... login required. |
Details... |
1.7km |
09/09/2022 |
REFUSED |
Timolin , Moone , Co. Kildare. |
a dwelling house, onsite secondary sewerage treatment system, shed to accommodate a working forge and stable, connection to public water main, new entrance and all site works ... login required. |
Details... |
1.8km |
03/08/2022 |
N/A |
Fuller's Court Road , Ballitore , Co. Kildare. |
development consists of constructing 16 No. dwellings consisting of 4 No. 2 storey 4-bed semi-detached houses, 10 No. 2 storey 3-bed semi-detached houses, 2 No. 2 storey 2-bed semi detached houses, connection to foul sew... login required. |
Details... |