2.8km |
24/06/2024 |
CONDITIONAL |
TINACRANNAGH , PORTARLINGTON , CO OFFALY |
3 no. domestic sheds and all associated site works... login required. |
Details... |
2.9km |
23/02/2023 |
CONDITIONAL |
KILMALOGUE , PORTARLINGTON , CO. OFFALY |
BOARDING KENNELS, ANIMAL SHELTER, DOMESTIC STABLES, AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.9km |
02/02/2023 |
N/A |
KILMALOGUE , PORTARLINGTON , CO. OFFALY |
KENNELS, STABLES, ANIMAL SHELTER, AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
330m |
13/01/2023 |
CONDITIONAL |
CUSHINA , PORTARLINGTON , CO. OFFALY R32 Y3F8 |
RENOVATION AND EXTENSION TO THE REAR OF EXISTING DWELLING TO ACCOMMODATE A GRANNY FLAT AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.6km |
07/12/2022 |
CONDITIONAL |
CUSHINA , PORTARLINGTON , CO. OFFALY |
AN ATTIC CONVERSION WITH DORMER WINDOWS TO THE REAR OF EXISTING DWELLING, DOMESTIC SHED AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
980m |
22/06/2022 |
CONDITIONAL |
CUSHINA , PORTARLINGTON , CO. OFFALY |
THE DEPOSITION OF SOIL AND STONE OVER AN AREA OF C. 5.88HA FOR THE PURPOSES OF LAND IMPROVEMENT WITH AN AGRICULTURAL END USE. A NATURA IMPACT STATEMENT (NIS) WILL BE SUBMITTED TO THE PLANNING AUTHORITY WITH THE APPLICATION... login required. |
Details... |
980m |
27/05/2022 |
N/A |
CUSHINA , PORTARLINGTON , CO. OFFALY |
THE DEPOSITION OF SOIL AND STONE OVER AN AREA OF C. 5.88HA FOR THE PURPOSES OF LAND IMPROVEMENT WITH AN AGRICULTURAL END USE. A NATURA IMPACT STATEMENT (NIS) WILL BE SUBMITTED TO THE PLANNING AUTHORITY WITH THE APPLICATION... login required. |
Details... |
980m |
16/05/2022 |
N/A |
DERRYVILLA , PORTARLINGTON , CO. OFFALY |
DEPOSITION OF SOIL AND STONE OVER AN AREA OF C. 5.88HA FOR THE PURPOSES OF LAND IMPROVEMENT WITH AN AGRICULTURAL END USE... login required. |
Details... |
2km |
16/03/2022 |
CONDITIONAL |
ENAGHAN , WALSH ISLAND , CO. OFFALY |
PROPOSED NEW DWELLING HOUSE, DOMESTIC GARAGE, NEW SITE ENTRANCE, SEPTIC TANK TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED WORKS... login required. |
Details... |
2.8km |
07/12/2021 |
CONDITIONAL |
ENAGHAN , WALSH ISLAND , GEASHILL |
CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE, WASTE WATER TREATMENT SYSTEM, POLISHING FILTER AND ALL ASSOCIATED WORKS ... login required. |
Details... |
1.1km |
07/12/2021 |
CONDITIONAL |
DERRYOUNCE LAKES AND TRAILWAYS CUSHINA , DERRYOUNCE AND DERRYVILLA PORTARLINGTON , CO. OFFALY |
3 NO. "CONNEX" CONTAINER UNITS TO REPLACE FOOT BRIDGES, 9 NO. PLINTHS FOR ARTWORK / SCULPTURES, 1 NEW STEEL CONTAINER STORAGE UNIT AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.8km |
02/12/2021 |
CONDITIONAL |
CUSHINA PORTARLINGTON , CO. OFFALY , R32 R6H3 |
THE EXTENSION TO THE FRONT OF EXISTING DWELLING. RETENTION PERMISSION FOR TWO DOMESTIC SHEDS AS BUILT TO THE REAR OF THE EXISTING DWELLING AND ALL ASSOCIATED SITE WORKS. PLANNING PERMISSION FOR PROPOSED SINGLE STOREY EXTENSIONS TO THE LEFT-HAND SIDE AND REAR OF THE EXISTING DWELLING... login required. |
Details... |
2.8km |
28/10/2021 |
N/A |
ENAGHAN , WALSH ISLAND GEASHILL , CO. OFFALY |
CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE, WASTE WATER TREATMENT SYSTEM AND POLISHING FILTER, NEW SITE ENTRANCE AND ALL ASSOCIATED WORKS... login required. |
Details... |
1.1km |
04/10/2021 |
N/A |
DERRYOUNCE LAKES AND TRAILWAYS CUSHINA , DERRYOUNCE AND DERRYVILLA PORTARLINGTON , CO. OFFALY |
3 NO. "CONNEX" CONTAINER UNITS TO REPLACE FOOT BRIDGES, 9 NO. PLINTHS FOR ARTWORK / SCULPTURES, 1 NEW STEEL CONTAINER STORAGE UNIT AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.6km |
03/02/2021 |
CONDITIONAL |
BRACKNAGH ARDRA MOANVANE GARRYMONA AND BALLYCHRISTAL , CO. OFFALY |
ROAD / JUNCTION ACCOMMODATION WORKS TO FACILITATE TURBINE DELIVERIES ASSOCIATED WITH A PROPOSED WIND FARM DEVELOPMENT IN CO. KILDARE. A CONCURRENT PLANNING APPLICATION IS BEING LODGED TO KILDARE COUNTY COUNCIL IN RELATION TO A 10 YEAR PLANNING PERMISSION FOR A WIND FARM DEVELOPMENT WHICH CONSISTS OF 5 NO. WIND TURBINES WITH A TIP HEIGHT OF UP TO 169M AND ALL ASSOCIATED FOUNDATIONS AND HARDSTANDING AREAS; 1 NO. ON-SITE ELECTRICAL SUBSTATION; 1 NO. TEMPORARY CONSTRUCTION COMPOUND; A... login required. |
Details... |