Skip to main content
All plans now 50% off - Limited offer for Business and Individual Subscriber accounts. Discount expires on Tuesday, 26 November 2024.

  CLONCOHER GEASHILL , TULLAMORE , CO. OFFALY

Aug 29 2022

Application Received

Oct 21 2022

Decision

Oct 23 2022

Decision Due

Dec 05 2022

Granted

Dec 04 2027

Expiry (if required)
  • Submitted to Offaly County Council, 29 / 08 / 2022
  • Application Type: PERMISSION
  • Current Status: APPLICATION FINALISED
  • Decision Text: CONDITIONAL
  • Decision Summary: Granted
-- View Live Map (full screen map - includes planning application boundaries, zonings & other planning-related mapped content)

-- Signup Now to link to Commencement Notice details
Development:
2 STOREY HOUSE, EFFLUENT TREATMENT SYSTEM, PERCOLATION ... Signup to read full development description
An Bord Pleanála Information:
Creative Commons LicensePlanning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

  • Distance: Received: Decision: Development Address: Development Description:
    2.2km 14/08/2024 N/A Annagharvey , Tullamore , Co. Offaly single storey front extension to existing dwelling and all associated site works... login required. Details...
    2.2km 01/07/2024 N/A Annagharvey , Tullamore , Co. Offaly for Single Storey Front Extension to Existing Dwelling and all associated site works... login required. Details...
    3km 05/03/2024 CONDITIONAL MEELAGHANS , TULLAMORE , CO. OFFALY THE ERECTION OF A NEW SINGLE STOREY DWELLING, CONNECTION TO A NEW EFFLUENT WASTE WATER TREATMENT SYSTEM AND PERCOLATION AREA, THE ERECTION OF A NEW DOMESTIC GARAGE AND ALL ANCILLARY SITE WORKS... login required. Details...
    2.2km 25/01/2024 N/A ANNAGHARVEY , TULLAMORE , CO. OFFALY EXTENSION AND WORKS CONSISTING OF 3 ROOMS TO EXISTING PROPERTY... login required. Details...
    2km 16/12/2023 CONDITIONAL Killeenmore , Killeigh , Tullamore Co. Offaly Roof over crush area and all associated site works... login required. Details...
    2.3km 14/11/2023 N/A FINTER KILLEIGH , TULLAMORE , CO. OFFALY THE ERECTION OF A NEW SINGLE STOREY DWELLING, CONNECTION TO A NEW EFFLUENT WASTE WATER TREATMENT SYSTEM AND PERCOLATION AREA, THE ERECTION OF A NEW DOMESTIC GARAGE ALL ANCILLARY SITE WORK... login required. Details...
    2km 09/06/2023 CONDITIONAL KILLEENMORE , KILLEIGH , TULLAMORE CONSTRUCTION OF (I) MILKING PARLOUR INCORPORATING DAIRY, PLANT, STORAGE, MEAL BIN, RAIN WATER STORAGE TANK, HOLDING YARD WITH CRUSH/DRAFTING YARD, UNDERGROUND EFFLUENT TANK WITH FLOW CHANNEL (II) CUBICLE SHED WITH UNDERGROUND EFFLUENT TANK AND ALL ASSOCIATED SITE WORKS... login required. Details...
    2.8km 30/05/2023 CONDITIONAL DANGANBEG HOUSE DANGANBEG , KILLEIGH , CO. OFFALY (I) CALF SHED (II) ROOFLESS CUBICLE WITH SLATTED TANKS (III) SILAGE SLAB IS ALSO REQUIRED.PERMISSION TO CONSTRUCT (I) MILKING PARLOUR INCORPORATING DAIRY, PLANT, STORAGE, MEAL BIN, RAIN WATER, MILK SI... login required. Details...
    800m 21/12/2022 CONDITIONAL RAHEENDUFF AND NEWTOWN , TULLAMORE , CO. OFFALY CONSTRUCTION OF A TWO STOREY HOUSE, GARAGE, SEPTIC TANK AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS AND SERVICES... login required. Details...
    2.4km 16/12/2022 CONDITIONAL FINTER KILLEIGH , TULLAMORE , CO. OFFALY THE ERECTION OF A NEW MACHINERY / DRY STORAGE SHED AND ALL ANCILLARY SITE WORKS... login required. Details...
    2.6km 01/09/2022 CONDITIONAL KILLEENMORE , KILLEIGH , CO. OFFALY A TWO STOREY DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK, PERCOLATION AREA, NEW ENTRANCE AND ALL NECESSARY AND ASSOCIATED SITE WORKS... login required. Details...
    830m 18/02/2022 N/A BALLYCOLLIN , GEASHILL , CO. OFFALY R35 HN15 DEMOLITION OF EXISTING FARMHOUSE, THE CONSTRUCTION OF A NEW TWO STOREY REPLACEMENT DETACHED DWELLING WITH CARPORT AND INTEGRAL GARAGE, THE INSTALLATION OF A NEW TRADITIONAL SEPTIC TANK AND RAISED PERCOLATION AREA AND ASSOCIATED SITE WORKS... login required. Details...
    660m 21/01/2022 CONDITIONAL NEWTOWN , KILLEIGH , CO. OFFALY THE DEMOLITION OF SINGLE STOREY EXTENSIONS TO THE SOUTH, EAST AND PORCH TO THE NORTH OF THE EXISTING DWELLING WITH THE CONSTRUCTION OF A TWO-STOREY EXTENSION TO THE SOUTH, A REPLACEMENT SINGLE STOREY EXTENSION TO THE EAST AND PORCH TO ... login required. Details...
    960m 04/11/2021 N/A BALLINA , GEASHILL , CO. OFFALY OF MOBILE HOME TO REAR OF EXISTING DWELLING HOUSE & CONNECTION TO EXISTING SEPTIC TANK FOR A PERIOD OF FIVE (5) YEARS... login required. Details...
    830m 01/11/2021 N/A BALLYCOLLIN , GEASHILL , CO. OFFALY R35 HN15 DEMOLITION OF THE EXISTING FRMHOUSE, THE CONSTRUCTION OF A NEW TWO STOREY REPLACEMENT DETACHED DWELLING WITH CARPORT AND INTEGRAL GARAGE AND THE INSTALLATION OF A NEW TRADITIONAL SEPTIC TANK AND RAISED PERCOLATION AREA... login required. Details...
    3km 29/10/2021 CONDITIONAL BALLYMOONEY , GEASHILL , CO. OFFALY (A) NEW 4 BEDROOM DORMER TYPE DWELLING, (B) NEW GARAGE FOR DOMESTIC USE ONLY, (C) WASTEWATER TREATMENT SYSTEM & PERCOLATION AREA, (D) NEW RESIDENTIAL ENTRANCE OFF LOCAL ROAD, (E) AND ALL OTHER ASSOCIATED SITE WORKS... login required. Details...
    2.7km 22/09/2021 CONDITIONAL FINTER , KILLEIGH , CO. OFFALY ERECTION OF A NEW STOREY AND A HALF DWELLING WITH CONNECTION TO A NEW SEPTIC TANK AND PERCOLATION AREA WITH, AND THE ERECTION OF A NEW SEPARATE DOMESTIC GARAGE, AND ALL ANCILLARY SITE WORKS... login required. Details...
    2.7km 23/08/2021 CONDITIONAL FINTER KILLEIGH , TULLAMORE , CO. OFFALY CONSTRUCTION OF A STORAGE SHED AND ALL ASSOCIATED SITE WORKS... login required. Details...
    1.9km 19/07/2021 CONDITIONAL KILLELLERY , GEASHILL , CO. OFFALY CONSTRUCTION OF A NEW SHEEP/LIVESTOCK SHED WITH UNDERGROUND SLATTED SLURRY STORAGE AND ASSOCIATED SITE WORKS AND PERMISSION TO CONSTRUCT A NEW HAY/FEED STORAGE SHED AND ASSOCIATED SITE WORKS... login required. Details...
  • Geology & Groundwater
    Creative Commons LicenseContains Irish Public Sector Data (Geological Survey) licensed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence.

    Aquifer:
    • Category: Ll
    • Description: Locally Important Aquifer - Bedrock which is Moderately Productive only in Local Zones

    Vulnerability:
    • Unit Name: Lucan Formation
    • Description: Dark limestone & shale (Calp") "
    • Labels: CDLUCN / LU

    Bedrock:
    • Moderate ( M)

    Planning & Development

    Zoning:
    Creative Commons LicenseZoning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.
    • No Results...

    National Parks & Wildlife (NPWS)
    Creative Commons LicenseNPWS Data is published by National Parks and Wildlife Service, Department of Arts, Heritage and the Gaeltacht and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

    Special Area of Conservation:
    • No Results...

    Special Protection Areas:
    • No Results...

    Natural Heritage Areas:
    • No Results...

    Proposed Natural Heritage Areas:
    • No Results...

    Heritage & Conservation
    Creative Commons LicenseMonument & NIAH Building Data is published by National Monuments Service, Department of Arts, Heritage, Regional, Rural and Gaeltacht Affairs and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

    National Monuments:

    National Monuments within 100m of the mapped planning point

    • No Results...

    National Monument Zones of Notification:

    Is this Planning Point is within a National Monument Zones of Notification? (Section 12 National Monuments Acts 1930 to 2004)

    • No Results...
    National Inventory of Architectural Heritage:

    NIAH Locations within 100m of the mapped planning point

    Name NIAH Ref # Rating / Period Original Use Current Use Protected Structure
    No Results...

    Roads & Infrastructure

    National Roads & Motorways within 500m of mapped planning point


    National Roads (N) and Motorways (M):
    • No Results...

Return to top...