2.8km |
06/11/2024 |
N/A |
Fossy Upper , Timahoe , Laois |
Develop 1. SITE ACCESS 2. CONSTRUCTION OF A DWELLING HOUSE 3. EFFLUENT TREATMENT SYSTEM 4. ALL ASSOCIATED SITE WORKS 5.PROPOSED NEW WELL... login required. |
Details... |
2.8km |
14/10/2024 |
N/A |
Fossy Upper , Timahoe , Laois |
Develop the following 1. SITE ACCESS
2. CONSTRUCTION OF A DWELLING HOUSE
3. EFFLUENT TREATMENT SYSTEM
4. ALL ASSOCIATED SITE WORKS
5. PROPOSED NEW WELL... login required. |
Details... |
1.3km |
31/05/2024 |
CONDITIONAL |
Baungomeely , Timahoe , Portlaoise |
Construct a two-storey dwelling house, domestic garage, wastewater treatment system and percolation area along with new site entrance and boundary treatments... login required. |
Details... |
1.3km |
27/05/2024 |
N/A |
Baungomeely , Timahoe , Portlaoise |
Permission to construct a two-storey dwelling house, domestic garage, wastewater treatment system and percolation area along with new site entrance and boundary treatments ... login required. |
Details... |
1.6km |
26/10/2023 |
REFUSED |
Aghoney , Timahoe , Co. Laois |
erect a new two storey dwelling, proprietary treatment system, domestic use garage and all ancillary site works... login required. |
Details... |
1.7km |
25/04/2023 |
CONDITIONAL |
Aughoney , Timahoe , Co Laois |
Extend existing dwelling. The works will include a two storey extension to the south of the existing dwelling all associated site works... login required. |
Details... |
2.8km |
16/03/2023 |
CONDITIONAL |
Crissard , Wolfhill , County Laois |
retain a hard standing & open loose yard on back filled ground & all necessary site works... login required. |
Details... |
3km |
22/07/2022 |
CONDITIONAL |
Garryglass , Timahoe , Co. Laois |
construct new dwelling house and garage, new treatment system with polishing filter, new site entrance and all associated site works... login required. |
Details... |
2.9km |
18/07/2022 |
CONDITIONAL |
Knockbaun , Abbeyleix , Co. Laois |
construct new dwelling house and garage, new treatment system with polishing filter, new site entrance and all associated site works... login required. |
Details... |
2.9km |
13/07/2022 |
CONDITIONAL |
Moyadd , The Swan , Co. Laois |
construct a dwelling house, domestic garage, septic tank treatment system, percolation area, shared site entrance and all associated site works... login required. |
Details... |
2.9km |
24/05/2022 |
N/A |
Moyadd , The Swan , Co. Laois |
construct a dwelling house, domestic garage, septic tank treatment system, percolation area, shared site entrance and all associated site works... login required. |
Details... |
1.6km |
14/03/2022 |
CONDITIONAL |
Pinehurst Lodge , Aghadreen , Wolfhill |
extend and renovate existing dwelling house by way of adding storey and a half style conversion, alter elevations and all associated site works... login required. |
Details... |
1.6km |
09/03/2022 |
N/A |
Pinehurst Lodge , Aghadreen , Wolfhill |
extend and renovate existing dwelling house by way of adding storey and a half style conversion, alter elevations and all associated site works... login required. |
Details... |
990m |
02/03/2022 |
CONDITIONAL |
Aghadreen , The Swan , Co.Laois |
to alter previously approved design in planning reference 20/514 for the construction of a new dwelling house, effluent treatment system, percolation area and all associated site works... login required. |
Details... |
2.9km |
12/10/2021 |
CONDITIONAL |
Knockbaun , Spink , Co. Laois |
develop as follows: the continued use and operation of the existing quarry including deepening of the quarry. Extraction will be confined to the existing permitted quarry area (P.A. Ref. 10/383) comprising an extraction area of c. 14.5 ha within an overall application area of c. 19.6 ha. The development will include provision of new site infrastructure, including portacabin site office / canteen, toilets, concrete batching plant and truck washdown facility, hydrocarbon interceptors, mobile crushing and screenin... login required. |
Details... |
3km |
04/10/2021 |
N/A |
Knockbaun , Spink , Co. Laois |
develop as follows: the continued use and operation of the existing quarry including deepening of the quarry. Extraction will be confined to the existing permitted quarry area (P.A. Ref. 10/383) comprising an extraction area of c. 14.5 ha within an overall application area of c. 19.6 ha. The development will include provision of new site infrastructure, including portacabin site office / canteen, toilets, concrete batching plant and truck washdown facility, hydrocarbon interceptors, mobile crushing and scree... login required. |
Details... |
2.1km |
08/09/2021 |
CONDITIONAL |
Cleanagh , Spink , Co. laois |
to construct dwelling house, domestic garage, new site entrance, septic tank treatment system, percolation area and all associated site works. ... login required. |
Details... |
20m |
11/08/2021 |
N/A |
Knocklead , Timahoe , Co. Laois |
retain hard standing area/driving track as constructed, full planning permission to complete same as a learner driving centre. Retention permission to ret... login required. |
Details... |
0m |
29/07/2021 |
N/A |
Knocklead , Timahoe , Co. Laois |
retain hard standing area/driving track as constructed, full planning permission to complete same as a learner driving centre. Retention permission to retain two structures and associated site works... login required. |
Details... |