Skip to main content
All plans now 50% off - Limited offer for Business and Individual Subscriber accounts. Discount expires on Tuesday, 07 May 2024.

  TULLY , TUBBER , CO. OFFALY

Feb 28 2024

Application Received

Apr 23 2024

Further Info. Requested
  • Submitted to Offaly County Council, 28 / 02 / 2024
  • Application Type: PERMISSION
  • Current Status: FURTHER INFORMATION
  • Decision Text: N/A
  • Decision Summary: No Decision
-- View Live Map (full screen map - includes planning application boundaries, zonings & other planning-related mapped content)

-- Signup Now to link to Commencement Notice details
Development:
THE CONSTRUCTION OF AN AGRICULTURAL SLATTED SHED... Signup to read full development description
An Bord Pleanála Information:
Creative Commons LicensePlanning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

  • Distance: Received: Decision: Development Address: Development Description:
    470m 07/02/2024 CONDITIONAL BURROW , TUBBER , CO. OFFALY THE CONSTRUCTION OF A CUBICLED LIVESTOCK SHED WITH WASTE FLOW CHANNEL, SILAGE SLAB AND ASSOCIATED ANCILLARY SITE WORKS... login required. Details...
    1.7km 10/11/2023 CONDITIONAL Faheeran , Tubber , Moate Co. Offaly a new dwelling house, domestic garage, new site entrance, septic tank and percolation area and all associated site works... login required. Details...
    2.6km 22/08/2023 CONDITIONAL Gorteen , Tubber , Co.Offaly A new dwelling, gated entrance, garage; percolation area with septic tank system and all ancillary site works.... login required. Details...
    2km 08/08/2023 CONDITIONAL Curraghboy/Woodfield , Clara , Co. Offaly Construction of an extension to the north & west of existing dwelling. The application will also include the renovation of existing derelict dwelling, new biofilter treatment system to replace existing septic tank all associated site works and drainage... login required. Details...
    1.9km 03/08/2023 CONDITIONAL Tober , Co. Offaly construction of one number detached single storey dwelling , one number detached single storey garage, to upgrade existing entrance to public road, to connect to public watermain, to install a septic tank and percolation area and all associated site works ... login required. Details...
    1.8km 31/05/2023 REFUSED TUBBER , CO. OFFALY 8 NUMBER FOUR BEDROOM AND 2 NUMBER THREE BED DWELLINGS. THE APPLICATION WILL ALSO INCLUDE A COMMUNTIY EFFLUENT TREATMENT UNIT, PERCOLATION AREA, NEW VEHICULAR ENTRANCE AND ASSOCIATED ACCESS ROADS, FOOTPATHS, PUBLIC OPEN SPACE AND ALL ASSOCIATED SITE WORKS AND DRAINAGE... login required. Details...
    2.1km 28/04/2023 CONDITIONAL NEWTOWN , HORSELEAP MOATE , CO. OFFALY CONSTRUCTION OF A SLATTED SHED AND UNDERGROUND NUTRIENT STORAGE TANK ALONG WITH ALL ASSOCIATED SITE WORKS... login required. Details...
    1.7km 22/02/2023 N/A TUBBER , CO. OFFALY NINE, FOUR BEDROOM DWELLINGS. THE APPLICATION WILL ALSO INCLUDE A COMMUNITY EFFLUENT TREATMENT UNIT, PERCOLATION AREA, NEW VEHICULAR ENTRANCE AND ASSOCIATED ACCESS ROADS, FOOTPATHS, PUBLIC OPEN SPACE AND ALL ASSOCIATED SITE WORKS AND DRAINAGE... login required. Details...
    940m 21/11/2022 CONDITIONAL KILCURLEY TUBBER , MOATE , CO. OFFALY CONSTRUCTION OF A ONE BEDROOM DWELLING AND GARAGE. THE APPLICATION WILL ALSO INCLUDE A NEW DOMESTIC ENTRANCE, EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA, BOUNDARY TREATMENTS AND ALL ASSOCIATED SITE-WORKS AND DRAINAGE... login required. Details...
    2km 14/11/2022 CONDITIONAL GORTEEN , TUBBER , CO. OFFALY EXISTING DEVELOPMENT AS CONSTRUCTED (PREVIOUSLY GRANTED PERMISSION UNDER PLANNING FILE 84/25) CONSISTING OF EXISTING FAMILY HOME, GARDEN SHED, SITE BOUNDARY'S AND ASSOCIATED SITE WORKS. PERMISSION IS ALSO SOUGHT TO INTERNALLY ALTER EXISTING DWELLING, TO UPGRADE EXISTING FRONT PORCH, TO CONSTRUCT A SING... login required. Details...
    2km 26/10/2022 CONDITIONAL WOODFIELD , CLARA , CO. OFFALY A PROPOSED NEW SINGLE STOREY DWELLING, NEW VEHICULAR ENTRANCE, DRIVEWAY, WASTE WATER TREATMENT SYSTEM, STORM WATER SOAKAWAYS AND ALL ASSOCIATED SITE WORKS... login required. Details...
    760m 02/03/2022 CONDITIONAL FAHEERAN AND TULLY , TUBBER MOATE , CO. OFFALY ALTERATIONS AND EXTENSION TO AN EXISTING DWELLING HOUSE, NEW DETACHED GARAGE, NEW SITE ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. Details...
    2.1km 09/02/2022 CONDITIONAL WOODFIELD , CLARA , CO. OFFALY CONSTRUCTION OF A NEW FOUR BEDROOM DWELLING HOUSE, NEW EFFLUENT TREATMENT SYSTEM, NEW GARAGE, NEW VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. Details...
    1.9km 20/01/2022 CONDITIONAL NEWTOWN , HORSELEAP , CO. OFFALY TO CONSTRUCT 1 NO. DWELLING, GARAGE, WASTE WATER TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. Details...
    1.8km 17/09/2021 CONDITIONAL TUBBER (TOBER) , CO. OFFALY CONSTRUCTION OF A FOUR BEDROOM DWELLING. THE APPLICATION WILL ALSO INCLUDE A NEW VEHICLE AND PEDESTRIAN ENTRANCE, EFFLUENT TREATMENT SYSTEM WITH PERCOLATION AREA, GARAGE AND ALL ASSOCIATED SITE-WORKS AND DRAINAGE... login required. Details...
    1.9km 26/08/2021 N/A TUBBER (TOBER) , CO. OFFALY CONSTRUCTION OF A FOUR BEDROOM DWELLING. THE APPLICATION WILL ALSO INCLUDE A NEW VEHICLE AND PEDESTRIAN ENTRANCE, EFFLUENT TREATMENT SYSTEM WITH PERCOLATION AREA, GARAGE AND ALL ASSOCIATED SITE-WORKS AND DRAINAGE... login required. Details...
    2.7km 20/08/2021 CONDITIONAL FEARBOY , MOATE , CO. OFFALY THE ERECTION OF A NEW BUNGALOW DWELLING WITH CONNECTION TO A NEW SEPTIC TANK AND PERCOLATION AREA WITH THE ERECTION OF A NEW SEPERATE DOMESTIC GARAGE, AND ALL ANCILLARY SITE WORKS... login required. Details...
    2.4km 15/04/2021 CONDITIONAL GORTEEN , TUBBER , CO. OFFALY A NEW DWELLING, GATED ENTRANCE, GARAGE; PROPRIETARY TREATMENT SYSTEM WITH DISCHARGE TO A PACKAGED TERTIARY UNIT AND ALL ANCILLARY SITE WORKS... login required. Details...
    1.1km 06/04/2021 CONDITIONAL FAHEERAN , MOATE , CO. OFFALY CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE AND SINGLE DWELLING TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. Details...
  • Geology & Groundwater
    Creative Commons LicenseContains Irish Public Sector Data (Geological Survey) licensed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence.

    Aquifer:
    • Category: Ll
    • Description: Locally Important Aquifer - Bedrock which is Moderately Productive only in Local Zones

    Vulnerability:
    • Unit Name: Waulsortian Limestones
    • Description: Massive unbedded lime-mudstone
    • Labels: CDWAUL / WA

    Bedrock:
    • High ( H)

    Planning & Development

    Zoning:
    Creative Commons LicenseZoning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.
    • No Results...

    National Parks & Wildlife (NPWS)
    Creative Commons LicenseNPWS Data is published by National Parks and Wildlife Service, Department of Arts, Heritage and the Gaeltacht and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

    Special Area of Conservation:
    • No Results...

    Special Protection Areas:
    • No Results...

    Natural Heritage Areas:
    • No Results...

    Proposed Natural Heritage Areas:
    • No Results...

    Heritage & Conservation
    Creative Commons LicenseMonument & NIAH Building Data is published by National Monuments Service, Department of Arts, Heritage, Regional, Rural and Gaeltacht Affairs and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

    National Monuments:

    National Monuments within 100m of the mapped planning point

    • No Results...

    National Monument Zones of Notification:

    Is this Planning Point is within a National Monument Zones of Notification? (Section 12 National Monuments Acts 1930 to 2004)

    • No Results...
    National Inventory of Architectural Heritage:

    NIAH Locations within 100m of the mapped planning point

    Name NIAH Ref # Rating / Period Original Use Current Use Protected Structure
    No Results...

    Roads & Infrastructure

    National Roads & Motorways within 500m of mapped planning point


    National Roads (N) and Motorways (M):
    • No Results...

Return to top...