1.8km |
17/09/2024 |
N/A |
Kilfoylan , Moate , Co.Offaly |
construction of a side extension onto our existing dwelling and carry out internal alterations and renovations to the existing dwelling, resulting in a partial reconfiguration of the internal layout ... login required. |
Details... |
1.8km |
30/08/2024 |
N/A |
Kilfoylan , Moate , Co.Offaly |
construction of a side extension onto our existing dwelling and carry out internal alterations and renovations to the existing dwelling, resulting in a partial reconfiguration of the internal layout ... login required. |
Details... |
1.4km |
22/04/2024 |
N/A |
KILFOYLAN , TUBBER , CO. OFFALY |
THE ERECTION OF DWELLING HOUSE WITH PROVISION FOR FUTURE DEVELOPMENT OF ATTIC, INSTALLATION OF EFFLUENT WASTE WATER TREATMENT SYSTEM INCLUDING PERCOLATION SYSTEM, AND ALL ANCILLARY WORKS... login required. |
Details... |
2.7km |
22/08/2023 |
CONDITIONAL |
Gorteen , Tubber , Co.Offaly |
A new dwelling, gated entrance, garage; percolation area with septic tank system and all ancillary site works.... login required. |
Details... |
1.7km |
31/03/2023 |
CONDITIONAL |
KILFOYLAN TOBER , MOATE , CO. OFFALY |
(PLANNING REFERENCE 20-241) FOR A NEW DWELLING HOUSE, NEW SITE ENTRANCE, SEPTIC TANK AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS. PLANNING PERMISSION IS ALSO BEING SOUGHT FOR A DOMESTIC GARAGE... login required. |
Details... |
2.5km |
13/01/2023 |
CONDITIONAL |
THE TOWNLANDS OF LURGAN , MOATE , CO. OFFALY |
A PERIOD OF 10 YEARS TO CONSTRUCT AND COMPLETE A SOLAR PV DEVELOPMENT. THE DEVELOPMENT COVERS A TOTAL SITE AREA OF 21.6 HECTARES AND WILL INCLUDE PV PANELS MOUNTED ON METAL FRAMES, NEW INTERNAL ACCESS TRACKS, UNDERGROUND CABLING, PERIMETER FENCING WITH CCTV CAMERAS, 14 NO. INVERTER STATIONS, AND ALL ANCILLARY GRID INFRASTRUCTURE AND ASSOCIATED WO... login required. |
Details... |
2.5km |
20/12/2022 |
N/A |
TOWNLANDS OF LURGAN , MOATE , CO. OFFALY |
A PERIOD OF 10 YEARS TO CONSTRUCT AND COMPLETE A SOLAR PV DEVELOPMENT TO INCLUDE PV PANELS MOUNTED ON METAL FRAMES, NEW ACCESS TRACKS, UNDERGROUND CABLING, PERIMETER FENCING WITH CCTV CAMERAS, 14 INVERTER STATIONS, TEMPORARY CONSTRUCTION COMPOUND, CLIENT SUBSTATION AND ALL ANCILLARY GRID INFRASTRUCTURE AND ASSOCIATED WORKS. THE SOLAR FARM WOULD BE OPERATIONAL FOR 40 YEARS. THE PROPOSED SITE AREA TRANSVERSES THE WESTMEATH COUNTY AND OFFALY COUNTY ADMINISTRATIVE BOUNDARIES RESULTING IN A BREAKDOWN OF AREAS AS FOLL... login required. |
Details... |
1.1km |
09/09/2022 |
REFUSED |
KILFOYLAN TOBER , MOATE , CO. OFFALY |
CONSTRUCTION OF A TWO BEDROOM DWELLING AND GARAGE. THE APPLICATION WILL ALSO INCLUDE AN EFFLUENT TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED SITE-WORKS, BOUNDARY TREATMENTS AND DRAINAGE... login required. |
Details... |
1.8km |
26/08/2022 |
CONDITIONAL |
WILTON BALLYCUMBER , CO. OFFALY , R35 E932 |
AN EXISTING SITE ENTRANCE CONSTRUCTED TO THE FRONT OF SITE... login required. |
Details... |
1.4km |
25/08/2022 |
CONDITIONAL |
KILFOYLAN , TUBBER , CO. OFFALY |
CONSTRUCTION OF DWELLING HOUSE, DOMESTIC GARAGE, EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA... login required. |
Details... |
2.8km |
06/09/2021 |
CONDITIONAL |
BALLYCUMBER GAA , MOOROCK BALLYCUMBER , CO. OFFALY |
CONSTRUCTION OF A NEW SINGLE STOREY TRAINING SHED WITH ARTIFICIAL GRASS AREA, DECOMMISSIONING OF EXISTING SEPTIC TANK AND CONSTRUCTION OF NEW EFFLUENT TREATMENT ... login required. |
Details... |
2.8km |
20/08/2021 |
N/A |
BALLYCUMBER GAA , MOOROCK BALLYCUMBER , CO. OFFALY |
CONSTRUCTION OF A NEW SINGLE STOREY TRAINING SHED WITH ARTIFICIAL GRASS AREA, RELOCATION OF EXISTING PERCOLATION AREA, ALTERATIONAS TO EXISTING BOUNDARY WALL AND ERECTION OF A NEW PEDESTRIAN GATE AND ALL ASSOCIATED SITE WORKS TO COMPLETE THE DEVELOPMENT... login required. |
Details... |
1.9km |
12/08/2021 |
CONDITIONAL |
WILTON , BALLYCUMBER , CO. OFFALY |
CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE, EFFLUENT TREATMENT SYSTEM, PERCOLATION AREA AND ALL ANCILLARY WORKS... login required. |
Details... |
1.8km |
14/05/2021 |
CONDITIONAL |
LURGAN TUBBER , MOATE , CO. OFFALY |
A NEW DWELLING HOUSE, DETACHED GARAGE, NEW SITE ENTRANCE, TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.8km |
15/04/2021 |
CONDITIONAL |
GORTEEN , TUBBER , CO. OFFALY |
A NEW DWELLING, GATED ENTRANCE, GARAGE; PROPRIETARY TREATMENT SYSTEM WITH DISCHARGE TO A PACKAGED TERTIARY UNIT AND ALL ANCILLARY SITE WORKS... login required. |
Details... |
1.9km |
09/04/2021 |
CONDITIONAL |
GREENVILLE/GARRYDUFF , TUBBER , CO. OFFALY |
CONSTRUCTION OF A STOREY AND A HALF DWELLING, DETACHED RESIDENTIAL GARAGE, PROPRIETARY TREATMENT SYSTEM, PERCOLATION AREA & ALL ANCILLARY SITE WORKS AS PER SUBMITTED DRAWINGS ... login required. |
Details... |