2.4km |
11/10/2024 |
N/A |
KILLINA , TULLAMORE , CO. OFFALY |
RECONSTRUCTION AND EXTENSION TO THE EXISTING COTTAGE AND INSTALLATION OF TERTIARY TREATMENT SYSTEM AND INFILTRATION/TREATMENT AREA AND ALL ASSOCIATED SITE WORKS AND SERVICES... login required. |
Details... |
2.5km |
04/10/2024 |
N/A |
GLASKILL LANE GLASKILL , SCREGGAN , CO OFFALY |
ALTERATIONS TO ELEVATIONS OF EXISTING DWELLING INCLUDING ENERGY RETROFIT, CONSTRUCTION OF AN EXTENSION TO THE SIDE OF EXISTING DWELLING, NEW SEPTIC TANK WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS TO COMPLETE THE DEVELOPMENT AT GLASKILL LANE, GLASKILL, SCREGGAN, Co OFFALY... login required. |
Details... |
2.5km |
01/10/2024 |
N/A |
GLASKILL LANE GLASKILL , SCREGGAN , CO OFFALY |
ALTERATIONS TO ELEVATIONS OF EXISTING DWELLING INCLUDING ENERGY RETROFIT, CONSTRUCTION OF AN EXTENSION TO THE SIDE OF EXISTING DWELLING, NEW SEPTIC TANK WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS TO COMPLETE THE DEVELOPMENT AT GLASKILL LANE, GLASKILL, SCREGGAN, Co OFFALY... login required. |
Details... |
2.8km |
08/07/2024 |
N/A |
Loughroe Rahan , Tullamore , Co. Offaly |
the construction of a new dwelling house, new garage, new effluent treatment system and all associated site development works... login required. |
Details... |
2.8km |
05/06/2024 |
N/A |
LOUGHROE , RAHAN , CO. OFFALY |
AN EXISTING SEPTIC TANK ON THE PROPOSED REVISED & REDUCED SITE WHICH SERVES THE EXISTING TWO STOREY DWELLING HOUSE. PERMISSION TO REVISE SITE BOUNDARIES, REDUCE SITE AREA & ALTER SITE ENTRANCE TO PROVIDE FOR A SHARED ENTRANCE WITH ADJAC... login required. |
Details... |
2.8km |
30/05/2024 |
N/A |
LOUGHROE , RAHAN , CO. OFFALY |
AN EXISTING EFFLUENT TREATMENT SYSTEM ON THE PROPOSED REVISED & REDUCED SITE WHICH SERVES THE EXISTING DWELLING HOUSE. PERMISSION TO REVISE SITE BOUNDARIES, REDUCE SITE AREA & ALTER SITE ENTRANCE TO PROVIDE FOR A SHARED ENTRANCE WITH ADJA... login required. |
Details... |
2.2km |
12/04/2024 |
N/A |
Bunaterin TD , Scregggan , Tullamore Co. Offaly |
(1) Provision of an 8,515 square metre defined recycling area in the pit floor (2) Processing of up to 19,500 tonnes of waste concrete annually using a mobile crushing and ... login required. |
Details... |
990m |
05/04/2024 |
REFUSED |
GLASSHOUSE , BLUEBALL , CO. OFFALY |
CONSTRUCTION OF AGRICULTURAL SHED AND ASSOCIATED SITE WORKS... login required. |
Details... |
580m |
01/11/2023 |
CONDITIONAL |
RABBITBURROW , BLUEBALL , CO. OFFALY |
CONSTRUCTION OF DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK/ETS PERCOLATION AREA AND ASSOCIATED SITE WORKS... login required. |
Details... |
2.8km |
28/06/2023 |
CONDITIONAL |
LOUGHROE , RAHAN , CO. OFFALY |
A CHANGE OF USE FROM A DOMESTIC GARAGE TO A DWELLING HOUSE SERVICED BY AN EXISTING ON SITE EFFLUENT TREATMENT SYSTEM PREVIOUSLY APPROVED ON FOOT OF PLANNING FILE REFERENCE PL2/00/672 AND PL2/01/1224. PERMISSION FOR A USE OF AN EXISTING VEHICULAR ENTRANCE... login required. |
Details... |
2.8km |
28/06/2023 |
N/A |
LOUGHROE , RAHAN , CO. OFFALY |
AN EXISTING EFFLUENT TREATMENT SYSTEM ON THE PROPOSED REVISED & REDUCED SITE WHICH SERVES THE EXISTING DWELLING HOUSE. PERMISSION TO REVISE SITE BOUNDARIES, REDUCE SITE AREA & ALTER SITE ENTRANCE TO PROVIDE FOR A SHARED ENTRANCE WI... login required. |
Details... |
650m |
17/05/2023 |
CONDITIONAL |
OLDTOWN ROSCORE BLUEBALL , TULLAMORE , CO. OFFALY |
A NEW DWELLING HOUSE, DOMESTIC GARAGE, NEW SITE ENTRANCE, TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.4km |
20/02/2023 |
CONDITIONAL |
PALLAS , BLUE BALL TULLAMORE , CO. OFFALY |
CONSTRUCTION OF A NEW DWELLING HOUSE, DETACHED GARAGE, NEW VEHICULAR ENTRANCE, NEW DRIVEWAY, WASTE WATER TREATMENT SYSTEM, STORM WATER SOAKAWAYS, AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.8km |
16/02/2023 |
CONDITIONAL |
KILLINA , RAHAN TULLAMORE , CO. OFFALY |
THE CONSTRUCTION OF A SINGLE STOREY DWELLING HOUSE, SINGLE STOREY GARAGE, SEPTIC TANK WITH PERCOLATION AREA, NEW ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.4km |
03/02/2023 |
N/A |
PALLASPARK BLUE BALL , TULLAMORE , CO. OFFALY |
CONSTRUCTION OF A NEW DWELLING HOUSE, DETACHED GARAGE, NEW VEHICULAR ENTRANCE, NEW DRIVEWAY, WASTE WATER TREATMENT SYSTEM, STORM WATER SOAKAWAYS, AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
430m |
15/12/2022 |
CONDITIONAL |
CORCUSH BLUEBALL , TULLAMORE , CO. OFFALY |
GARAGE & FUEL STORE... login required. |
Details... |
2.9km |
25/10/2022 |
N/A |
KILLINA RAHAN , TULLAMORE , CO. OFFALY |
5 NO. STOREY AND HALF HOUSES. THE DWELLING MIX IS 1 NO. 5-BEDROOM HOUSE WITH DETACHED GARAGE AND 4 NO. 4-BEDROOM HOUSES, WITH INDIVIDUAL SEPTIC TANK AND PERCOLATION AREAS FOR EACH HOUSE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.4km |
20/10/2022 |
CONDITIONAL |
BUNATERIN TD. SCREGGAN , TULLAMORE , CO. OFFALY |
(A) ADDITION OF A COLD FEED RECLAIMED ASPHALT PAVEMENT (RAP) FEED ADDITION TO THE EXISTING APPROVED ASPHALT PLANT (PLANNING REGISTER REFERENCE NUMBER 02/462 AND 19/478) (B) A RAP MILLING PLANT WITH TWO COVERED STORAGE BAYS AND ALL ANCILLARY WORKS... login required. |
Details... |
2.9km |
14/10/2022 |
N/A |
KILLINA , RAHAN TULLAMORE , CO. OFFALY |
DEVELOPMENT CONSISTING OF 5 NO. STOREY AND HALF HOUSES. THE DWELLING MIX IS 1 NO. 5-BEDROOM HOUSE WITH DETACHED GARAGE AND 4 NO. 4-BEDROOM HOUSES, WITH INDIVIDUAL SEPTIC TANK AND PERCOLATION AREAS FOR EACH HOUSE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |