0m |
23/10/2024 |
N/A |
Knockbarron Td. , Kinnitty , Co. Offaly |
construction of new single/dormer type dwelling house, install septic tank with percolation area, form new entrance & all associated site works.... login required. |
Details... |
0m |
22/10/2024 |
N/A |
Knockbarron Td. , Kinnitty , Co. Offaly |
construction of new single/dormer type dwelling house, install septic tank with percolation area, form new entrance & all associated site works... login required. |
Details... |
10m |
15/10/2024 |
N/A |
Knockbarron Td. , Kinnitty , Co. Offaly |
construction of new single/dormer type dwelling house, install septic tank with percolation area, form new entrance & all associated site works.... login required. |
Details... |
2.9km |
05/03/2024 |
N/A |
PIGEONSTOWN , CADAMSTOWN , BIRR CO.. OFFALY |
the provision of a glamping/camping site, to include glamping pods, camping area, service building, entrance, parking and wastewater treatment system, pr... login required. |
Details... |
2.9km |
27/02/2024 |
N/A |
PIGEONSTOWN , CADAMSTOWN , BIRR CO. OFFALY |
the provision of a glamping/camping site, to include glamping pods, camping area, service building, entrance, parking and wastewater treatment system, p... login required. |
Details... |
1.3km |
16/10/2023 |
CONDITIONAL |
CURRABEG KINNITTY , BIRR , CO. OFFALY |
THE DEMOLITION OF EXISTING EXTENSION TO THE SIDE OF EXISTING HOUSE AND TO CONSTRUCT A NEW TWO STOREY GRANNY FLAT EXTENSION TO SIDE OF EXISTING HOUSE, NEW WASTE WATER TREATMENT SYSTEM, STORM WATER SOAKAWAY, AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.3km |
05/10/2023 |
N/A |
CURRABEG , KINNITTY , BIRR CO. OFFALY |
THE DEMOLISH OF EXISTING EXTENSION TO THE SIDE OF EXISTING HOUSE AND TO CONSTRUCT A NEW TWO STOREY GRANNY FLAT EXTENSION TO SIDE OF EXISTING HOUSE, NEW WASTE WATER TREATMENT SYSTEM, STORM WATER SOAKAWAY, AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.7km |
21/08/2023 |
CONDITIONAL |
Kiltubbrid Island , Kinnitty Birr , Co. Offaly. |
Erecting a 30m high telecommunications lattice structure together with antennas, dishes, access track and associated telecommunications equipment, all enclosed by security fencing.... login required. |
Details... |
2.7km |
08/08/2023 |
N/A |
Kiltubbrid Island , Kinnitty Birr , Co. Offaly. |
Erecting a 30m high telecommunications lattice structure together with antennas, dishes, access track and associated telecommunications equipment, all enclosed by security fencing... login required. |
Details... |
2.9km |
06/07/2023 |
N/A |
PIDGEONSTOWN CADAMSTOWN , BIRR , CO. OFFALY |
THE PROVISION OF A GLAMPING/CAMPING SITE, TO INCLUDE GLAMPING PODS, CAMPING AREA, SERVICE BUILDING, ENTRANCE, PARKING AND WASTEWATER TREATMENT SYSTEM, INCLUDING ALL ASSOCIATED SITEWORKS. THE APPLICATION IS ACCOMPANIED BY A NATURA IMPACT STATEMENT (NIS) ... login required. |
Details... |
2.9km |
26/06/2023 |
N/A |
PIDGEONSTOWN , CADAMSTOWN , BIRR |
THE PROVISION OF A GLAMPING/ CAMPING SITE, TO INLUDE GLAMPING PODS, CAMPING AREA, SERVICE BUILDING, ENTRANCE, PARKING AND WASTEWATER TREATMENT SYSTEM, INCLUDING ALL ASSOCIATED SITEWORKS... login required. |
Details... |
2.7km |
13/06/2023 |
CONDITIONAL |
KYLE KINNITTY , BIRR , CO. OFFALY |
A SINGLE STOREY PITCHED ROOF EXTENSION TO THE WEST OF THE EXISTING DWELLING ALL WITH ASSOCIATED SITE WORKS... login required. |
Details... |
1.8km |
12/12/2022 |
CONDITIONAL |
THE WALK , KINNITTY , CO. OFFALY |
THE CONSTRUCTION OF A PROPOSED TWO-STOREY DWELLING, DOMESTIC OUTBUILDING, A PROPOSED SEPTIC TANK WITH PERCOLATION AREA, ALL ASSOCIATED SITE WORKS, INCLUDING A PROPOSED SITE ENTRANCE... login required. |
Details... |
2.4km |
19/07/2022 |
CONDITIONAL |
KNOCKBARRON KINNITTY , BIRR , CO. OFFALY |
A NEW DWELLING HOUSE, DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM, DRIVEWAY AND ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2km |
17/12/2021 |
CONDITIONAL |
THE WALK AND BALLINCUR , KINNITTY CO. OFFALY |
EXTENSION TO EXISTING GLAMPING FACILITY INCORPORATING 4 ADDITIONAL RESIDENTIAL LOG CABINS AND ALTERATIONS TO EXISTING SHOWER/ TOILET FACILITIES BY ADDING 1 ADDITIONAL SHOWER/ TOILET FACILITY. ... login required. |
Details... |
2.9km |
16/11/2021 |
N/A |
PIDGEONSTOWN CADAMSTOWN , BIRR , CO. OFFALY |
THE PROVISION OF A GLAMPING /CAMPING SITE, TO INCLUDE GLAMPING PODS, CAMPING AREA, SERVICE BUILDING, ENTRANCE, PARKING AND WASTEWATER TREATMENT SYSTEM, INCLUDING ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.6km |
05/11/2021 |
CONDITIONAL |
LETTYBROOK CADAMSTOWN , BIRR , CO. OFFALY |
CONSTRUCTION OF 1 NO. DWELLING, GARAGE, SEPTIC TANK & PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
780m |
29/10/2021 |
REFUSED |
THE WALK , KINNITTY , CO. OFFALY |
MOBILE HOME, SHED AND TEMPORARY SEPTIC TANK AND PERMISSION WILL CONSIST OF CONSTRUCTION OF SINGLE STOREY DWELLING HOUSE AND PACKAGED WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER AND ALL ANCILLARY WORKS AND SERVICES... login required. |
Details... |
880m |
09/07/2021 |
CONDITIONAL |
THE WALK , KINNITTY BIRR , CO. OFFALY |
A NEW DWELLING HOUSE, NEW SITE ENTRANCE, SEPTIC TANK AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |