2.5km |
13/09/2024 |
N/A |
LUMCLOON , CLOGHAN , CO. OFFALY |
CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFFLUENT TREATMENT UNIT WITH SOIL POLISHING FILTER AND ALL ANCILLARY SITE WORKS... login required. |
Details... |
2.5km |
02/09/2024 |
CONDITIONAL |
LUMCLOON , CLOGHAN , CO.OFFALY |
CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFFLUENT TREATMENT UNIT WITH SOIL POLISHING FILTER AND ALL ANCILLERY SITE WORKS... login required. |
Details... |
2.1km |
28/08/2024 |
REFUSED |
Rin , Ferbane , County Offaly |
•The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.5MW and an overall tip height of 149.38m.
•Installation of the hardstanding area for the Wind Energy Converter.
•Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site.
•Construction of the proposed substation building which will be located c. 340m from the proposed wind energy converte... login required. |
Details... |
2.1km |
23/08/2024 |
N/A |
Rin , Ferbane , County Offaly |
Lea Mór Renewable Energy Community (REC) Limited,intend to apply for permission for development at this site at Rin, Co. Offaly.
The development will consist of:
• The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.5MW and an overall tip height of 149.38m.
• Installation of the hardstanding area for the Wind Energy Converter.
• Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site.
• Construction of the proposed subs... login required. |
Details... |
2.1km |
29/07/2024 |
N/A |
Rin , Ferbane , County Offaly |
•The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.5MW and an overall tip height of 149.38m. •Installation of the hardstanding area for the Wind Energy Converter. •Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. •Construction of the proposed substation building which will be located c. 340m from the proposed wind energy converte... login required. |
Details... |
2.1km |
23/07/2024 |
N/A |
Rin , Ferbane , County Offaly |
•The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.5MW and an overall tip height of 149.38m.
•Installation of the hardstanding area for the Wind Energy Converter.
•Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site.
•Construction of the proposed substation building which will be located c. 340m from the proposed wind energy converte... login required. |
Details... |
0m |
14/09/2023 |
N/A |
Lumcloon , Cloghan , Co. Offaly |
The proposed development includes the construction of the following: (i) Open area battery energy storage system (BESS) on lands adjoining the existing BESS facility to the east and south, containing a total of 112 modular battery containers and medium voltage power stations (MVPS). The proposed development will utilise the existing customer (IPP) b... login required. |
Details... |
550m |
17/08/2023 |
CONDITIONAL |
Lands within the townlands of Lumcloon and Falsk , Gallen , Co. Offaly |
The installation of a solar photovoltaic (PV) farm, including a Battery Energy Storage System (BESS) consisting of 48no. units and provision of a bridge crossing the Silver River, on 87.96Ha./217.37 acres of lands comprising 18no. agricultural fields on two separate land parcels within the townlands of Lumcloon and Falsk, Gallen Co. Offaly (E: 613500; N: 720000 – centre of site). The solar farm will consist of a series solar photovoltaic (PV) panels mounted on steel support structures to a height not greater than 3.00m. Development ancillary to the siting of solar PV panels includes 19no. transformers; pole-mounted CCTV cameras; underground cabling; deer fenceline measuring 2.00m high... login required. |
Details... |
550m |
03/08/2023 |
N/A |
Lands within the townlands of Lumcloon and Falsk , Gallen , Co. Offaly |
The installation of a solar photovoltaic (PV) farm, including a Battery Energy Storage System (BESS) consisting of 48no. units and provision of a bridge crossing the Silver River, on 87.96Ha./217.37 acres of lands comprising 18no. agricultural fields on two separate land parcels within the townlands of Lumcloon and Falsk, Gallen Co. Offaly (E: 613500; N: 720000 – centre of site). The solar farm will consist of a series solar photovoltaic (PV) panels mounted on steel support structures to a height not greater than 3.00m. Development ancillary to the siting of solar PV panels includes 19no. transformers; pole-mounted CCTV cameras; underground cabling; deer fenceline measuring 2.00m high... login required. |
Details... |
540m |
13/07/2023 |
N/A |
Lands within the townlands of Lumcloon and Falsk , Gallen , Co. Offaly |
The installation of a solar photovoltaic (PV) farm, including a Battery Energy Storage System (BESS) consisting of 48no. units and provision of a bridge crossing the Silver River, on 87.96Ha./217.37 acres of lands comprising 18no. agricultural fields on two separate land parcels within the townlands of Lumcloon and Falsk, Gallen Co. Offaly (E: 613500; N: 720000 – centre of site). The solar farm will consist of a series solar photovoltaic (PV) panels mounted on steel support structures to a height not greater than 3.00m. Development ancillary to the siting of solar PV panels includes 19no. transformers; pole-mounted CCTV cameras; underground cabling; deer fenceline measuring 2.00m high... login required. |
Details... |
2.7km |
26/01/2023 |
REFUSED |
WITHIN THE TOWNLANDS OF LUMCLOON BUN DERRYCARNEY FALSK DERRIES RIN LEA BEG AND , LEA MORE , CO. OFFALY |
DEVELOPMENT OF A SOLAR PHOTOVOLTAIC (PV) ENERGY DEVELOPMENT.THE PROPOSED SOLAR PV ENERGY DEVELOPMENT IS CONTAINED WITHIN TWO DISTINCT PARCELS OF LAND, REFERRED TO AS ZONE 1 AND ZONE 2. THE OVERALL DEVELOPMENT SITE OF C. 247 HECTARES WILL CONTAIN: (I) SOLAR PV PANELS ON GROUND MOUNTED FRAMES /SUPPORT STRUCTURES WITHIN EXISTING FIELD BOUNDARIES, (IÎ) 30 NO. MEDIUM VOLTAGE POWER STATION (MVPS) ENCLOSURES (6.058M LONG X 2.348M WIDE X 2.896M HIGH), (III) 6 NO. WEATHER MONITORING STATIONS, (IV) 2 NO, TEMPORARY CONSTRUCTION COMPOUNDS (50M LONG X 35M WIDE), (V) INTERNAL SITE ACCESS TRACKS AND UNDERGR... login required. |
Details... |
2.7km |
04/01/2023 |
N/A |
LUMCLOON BUN DERRYCARNEY FALSK DERRIES RIN , LEA BEG AND LEA MORE , CO. OFFALY |
DEVELOPMENT OF A SOLAR PHOTOVOLTAIC (PV) ENERGY DEVELOPMENT.THE DEVELOPMENT SITE OF C. 247 HECTARES WILL CONTAIN: (I) SOLAR PV PANELS ON GROUND MOUNTED FRAMES /SUPPORT STRUCTURES WITHIN EXISTING FIELD BOUNDARIES, (IÎ) 30 NO. MEDIUM VOLTAGE POWER STATION (MVPS) ENCLOSURES (6.058M LONG X 2.348M WIDE X 2.896M HIGH), (III) 6 NO. WEATHER MONITORING STATIONS, (IV) 2 NO, TEMPORARY CONSTRUCTION COMPOUNDS (50M LONG X 35M WIDE), (V) INTERNAL SITE ACCESS TRACKS AND UNDERGROUND CABLES (UGC), (VI) UGC IN THE PUBLIC ROAD NETWORK (L70095, L.700... login required. |
Details... |
80m |
16/12/2021 |
N/A |
LUMCLOON , CLOGHAN , CO. OFFALY |
AN EXTENSION TO THE EXISTING BATTERY ENERGY STORAGE SYSTEM (BESS) FACILITY (CONSENTED UNDER PLANNING REF. PL2/19/55).THE PROPOSED DEVELOPMENT INCLUDES FOR CONSTRUCTION OF AN OPEN AREA BATTERY ENERGY STORAGE SYSTEM (BESS) COMPOUND WITHIN THE EXISTING BESS FACILITY (COMPOUND 1) AND ON LANDS ADJOINING THE EXISTING BESS FACILITY TO THE SOUTH (COMPOUND 2), THE COMPOUNDS WILL BE SURFACED WITH CLEAN WASHED LIMESTONE TO ACCORD WITH THE EXISTING BESS FACILITY. IT IS PROPOSED TO INSTALL A TOTAL OF 112 MODULAR BATTERY ENCLOSURES AND 28 MEDIUM VOLTAGE POWER SYSTEM (MVPS) ENCLOSURES. THE PROPOSED DEVELOPMENT WILL UTILISE THE EXISTING CUSTOM... login required. |
Details... |
1.5km |
04/06/2021 |
CONDITIONAL |
LUMCLOON , FERBANE , CO. OFFALY |
CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFLUENT TREATMENT UNIT WITH RAISED SOIL POLISHING FILTER AND ALL ANCILLARY SITE WORKS... login required. |
Details... |
2.1km |
17/05/2021 |
REFUSED |
RIN , CO. OFFALY |
CONSTRUCTION OF ONE 4.2MW WIND TURBINE WITH AN OVERALL TIP HEIGHT OF UP TO 150M; CONSTRUCTION OF THE WIND TURBINE FOUNDATION, HARDSTANDING AND ASSEMBLY AREA; PROVISION OF A SITE E... login required. |
Details... |
1.7km |
13/04/2021 |
CONDITIONAL |
LUMCLOON , CLOGHAN , CO OFFALY |
CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE / FUEL SHED, INSTALLATION OF SEPTIC TANK WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKS... login required. |
Details... |