Skip to main content
All plans now 50% off - Limited offer for Business and Individual Subscriber accounts. Discount expires on Saturday, 21 September 2024.

  LANDS TO THE EAST OF AND ACCESSED VIA THE EXISTING DEVELOPMENT AT FOREST VIEW , BANAGHER ROAD R439 TOWNPARKS BIRR , CO. OFFALY

May 31 2022

Application Received

Jul 25 2022

Further Info. Requested

Nov 29 2022

Further Info. Received

Jan 20 2023

Decision

Jan 21 2023

Decision Due

Feb 15 2023

Appeal Submitted

Oct 26 2023

Appeal Decision

Oct 26 2023

Granted

Apr 04 2024

Commencement Notice

Apr 19 2024

Commencement Started

Oct 25 2028

Expiry (if required)
  • Submitted to Offaly County Council, 31 / 05 / 2022
  • Application Type: PERMISSION
  • Current Status: APPLICATION FINALISED
  • Decision Text: CONDITIONAL
  • Decision Summary: Granted
Decision Appealed:
  • Appeal Submitted: 15 / 02 / 2023
  • Appeal Decision: CONDITIONAL (26 / 10 / 2023)
-- View Live Map (full screen map - includes planning application boundaries, zonings & other planning-related mapped content)

-- Signup Now to link to Commencement Notice details
Development:
THE FOLLOWING: ERECTION OF A FULLY SERVICED RESIDENTIAL HOUSING DEVELOPMENT OF 40 UNITS, CONSISTING OF 4.NO SINGLE STOREY SEMI-DETACHED 2 BEDROOM BUNGALOWS, 2 NO. SINGLE STOREY MID-TERRACE 1 BEDROOM BUNGALOWS, 20.NO. 3 BEDROOM 2 STOREY... Signup to read full development description
This planning file was referred to An Bord Pleanála.
You can view ABP information by signing up for a PlanningAlerts.ie account. Signup Now...
An Bord Pleanála Information:
Creative Commons LicensePlanning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

  • Distance: Received: Decision: Development Address: Development Description:
    1km 16/08/2024 N/A Sandymount , Birr , Co. Offaly This Development Will Consist of Planning Permission for (a) TO SUBDIVIDE THE SITE & EXISTING BUILDING TO CREATE 2 DWELLINGS WITH INTERNAL & EXTERNAL ALTERATIONS & (B) FOR CHANGE OF USE FROM COMMERCIAL TO RESIDENTIAL AND ALL ASSOCIATED SITE WORKS.... login required. Details...
    1.5km 14/08/2024 N/A Scurragh , Townparks , Birr Co. Offaly a 21 metres monopole telecommunications support structure carrying antennas, dishes, remote radio units (RRU’s), associated equipment, together with ground-based equipment cabinets, palisade fencing,... login required. Details...
    1.5km 08/08/2024 N/A Scurragh , Townparks , Birr the installation of a 21 metres monopole telecommunications support structure carrying antennas, dishes, remote radio units (RRU’s), associated equipment, together with ground-based equipment cabinets, palisad... login required. Details...
    1.4km 07/08/2024 N/A RAILWAY ROAD , MOORE PARK , BIRR CO. OFFALY THE CONSTRUCTION OF A PORCH EXTENSION TO THE WEST OF THE EXISTING PROPERTY... login required. Details...
    1.5km 02/08/2024 N/A Scurragh , Townparks , Birr Co. Offaly the installation of a 21 metres monopole telecommunications support structure carrying antennas, dishes, remote radio units (RRU’s), associated equipment, together with ground-based equipment cabinets, palisad... login required. Details...
    1.4km 23/07/2024 N/A RAILWAY ROAD , MOORE PARK , BIRR CO. OFFALY THE CONSTRUCTION OF A PORCH/ SUNROOM EXTENSION TO THE EAST OF EXISTING PROPERTY... login required. Details...
    2km 23/07/2024 N/A Seffin , Birr , Co. Offaly Removal Of Damaged Wall To Rear Of Property And For Permission To Construct New Wall In Its Place And Permission For Extension To Rear Of Existing Property And Internal Alterations To Existing Dwelling And All Associates Site Works... login required. Details...
    350m 20/06/2024 N/A St. Brendan’s Community School , Cappaneale Townparks Birr , Co. Offaly The development will consist of the Construction of a new single-storey extension to the southwest of the existing school building, which comprises six Classrooms and two Science Laboratories, including related accommodation and linking works to the existing school building. Refurbishment of existing Mainstream Classrooms to form a new two-classroom Special Needs Unit and the construction of a new single-storey extension to the northeast of the ex... login required. Details...
    360m 12/06/2024 N/A St. Brendan’s Community School , Cappaneale Townparks Birr , Co. Offaly The development will consist of the Construction of a new single-storey extension to the southwest of the existing school building, which comprises six Classrooms and two Science Laboratories, including related accommodation and linking works to the existing school building. Refurbishment of existing Mainstream Classrooms to form a new two-classroom Special Needs Unit and the construction of a new single-storey extension to the northeast of the ex... login required. Details...
    3km 08/06/2024 REFUSED CRINKILL , BIRR , CO. OFFALY PERMISSION FOR THE CONSTRUCTION OF A SINGLE-STORY REAR EXTENSION TO EXISTING SINGLE STORY DERELICT COTTAGE, RECESSED ENTANCE, PERMISSION FOR NEW ROOF ON EXISTING... login required. Details...
    3km 05/06/2024 N/A CRINKILL , BIRR , CO. OFFALY CONSTRUCTION OF A SINGLE-STORY REAR EXTENSION TO EXISTING SINGLE STORY COTTAGE, RECESSED ENTANCE, PERMISSION FOR NEW ROOF ON EXISTING COTTAGE AND PERMISSION FOR REMODELLING AND RENOVATION WORKS TO EXISTING COTTAGE INCLUDING NEW WINDOW ARRANGEMENT ON FRONT FAÇADE AND ALL ASSOCIATED SITE WORKS.... login required. Details...
    2km 21/05/2024 N/A Seffin , Birr , Co. Offaly extension to rear of existing property and internal alterations to existing dwelling and all associates site works... login required. Details...
    3km 17/05/2024 N/A CRINKILL , BIRR , CO. OFFALY PERMISSION FOR THE CONSTRUCTION OF A SINGLE-STORY REAR EXTENSION TO EXISTING SINGLE STORY COTTAGE, RECESSED ENTANCE, PERMISSION FOR NEW ROOF ON EXISTING COT... login required. Details...
    910m 16/05/2024 N/A 17 GREEN STREET , BIRR , CO. OFFALY REPLACEMENT / REPROFILING OF ROOF. CHANGE FROM SLATE TO METAL FINISH... login required. Details...
    1.6km 16/04/2024 N/A County Arms Hotel Railway Road , Townparks , Birr Co. Offaly a) removal of existing temporary structures, minor internal alterations, and partial demolition to facilitate the construction of a new two-storey extension to the southern elevation of existing hotel building. b) extension of existing car park including the provision of groundworks, pathways, public lig... login required. Details...
    1.8km 11/04/2024 N/A Townparks & Seffin , Birr , Co. Offaly the construction of 58 total no. residential units comprising of: (A) 2no. three-bedroom two-storey semi-detached (Type H); 1no. 2-bedroom bungalow (Type L2); 10no. 1&2-bedroom terraced bungalows in three blocks (Type L3/L4); 12no. two-bedroom two-storey terraced units in two blocks (Type M); and 4no. two-bedroom two-storey terraced units (Type N) (Total 29no. dwellings) at Macregol Páirc; (B) 8no. four-bedroom two-storey detached house (Type P); 1no.two-storey detached four-bedroom house (Type A2); 14no. two-storey four-bedroom semi-detached ... login required. Details...
    1.9km 11/04/2024 N/A Railway Road Townparks & Seffin , Birr , Co. Offaly the construction of 66 total no. residential units comprising of: (A) 20no. dwellings, comprising of 8no. four-bedroom two-storey detached houses (Type A); 8no. four-bedroom two-storey semi-detached houses (Type B1/B2); 2no. two-storey three-bedroom dual aspect semi-detached houses (Type C1/C2); 2no. two-storey three-bedroom dual aspect semi-detached houses (Type C3/C4); (B) 46no. build-to-rent apartments in 4 no. separate 3-storey blocks, comprising of 20no. one-bedroom ground floor apartments (Type D1/D2) with 20no. two-bedroom first floor duplex apartments (Type E1/E2) in three blocks, and 2no. one-bedr... login required. Details...
    1.9km 04/04/2024 N/A Railway Road Townparks & Seffin , Birr , Co. Offaly the construction of 66 total no. residential units comprising of: (A) 20no. dwellings, comprising of 8no. four-bedroom two-storey detached houses (Type A); 8no. four-bedroom two-storey semi-detached houses (Type B1/B2); 2no. two-storey three-bedroom dual aspect semi-detached houses (Type C1/C2); 2no. two-storey three-bedroom dual aspect semi-detached houses (Type C3/C4); (B) 46no. build-to-rent apartments in 4 no. separate 3-storey blocks, comprising of 20no. one-bedroom ground floor apartments (Type D1/D2) with 20no. two-bedroom first floor duplex apartments (Type E1/E2) in three blocks, and 2no. one-bedr... login required. Details...
    1.8km 04/04/2024 N/A Townparks & Seffin , Birr , Co. Offaly the construction of 58 total no. residential units comprising of: (A) 2 no. three-bedroom two-storey semi-detached (Type H); 1no. 2-bedroom bungalow (Type L2); 10no. 1&2-bedroom terraced bungalows in three blocks (Type L3/L4); 12no. two-bedroom two-storey terraced units in two blocks (Type M); and 4no. two-bedroom two-storey terraced units (Type N) (Total 29no. dwellings) at Macregol Páirc; (B) 8no. four-bedroom two-storey detached house (Type P); 1no.two-storey detached four-bedroom house (Type A2); 14no. two-storey four-bedroom semi-detached... login required. Details...
    1.6km 03/04/2024 N/A Railway Road , Townparks , Birr Co. Offaly The development will consist of: a) removal of existing temporary structures, minor internal alterations, and the construction of a new two-storey extension to the southern elevation of existing hotel building b)extension of existing car park including the provision of groundworks, pathways, ... login required. Details...
  • Geology & Groundwater
    Creative Commons LicenseContains Irish Public Sector Data (Geological Survey) licensed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence.

    Aquifer:
    • Category: Rkd
    • Description: Regionally Important Aquifer - Karstified (diffuse)

    Vulnerability:
    • Unit Name: Visean Limestones (undifferentiated)
    • Description: Undifferentiated limestone
    • Labels: CDVIS / VIS

    Bedrock:
    • High ( H)

    Planning & Development

    Zoning:
    Creative Commons LicenseZoning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.
    • No Results...

    National Parks & Wildlife (NPWS)
    Creative Commons LicenseNPWS Data is published by National Parks and Wildlife Service, Department of Arts, Heritage and the Gaeltacht and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

    Special Area of Conservation:
    • No Results...

    Special Protection Areas:
    • No Results...

    Natural Heritage Areas:
    • No Results...

    Proposed Natural Heritage Areas:
    • No Results...

    Heritage & Conservation
    Creative Commons LicenseMonument & NIAH Building Data is published by National Monuments Service, Department of Arts, Heritage, Regional, Rural and Gaeltacht Affairs and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

    National Monuments:

    National Monuments within 100m of the mapped planning point

    • No Results...

    National Monument Zones of Notification:

    Is this Planning Point is within a National Monument Zones of Notification? (Section 12 National Monuments Acts 1930 to 2004)

    • No Results...
    National Inventory of Architectural Heritage:

    NIAH Locations within 100m of the mapped planning point

    Name NIAH Ref # Rating / Period Original Use Current Use Protected Structure
    No Results...

    Roads & Infrastructure

    National Roads & Motorways within 500m of mapped planning point


    National Roads (N) and Motorways (M):
    • M/N52

Return to top...