1.8km |
01/10/2024 |
N/A |
Proposed Birr Primary Care Centre Development , Railway Road Townparks , Birr Co. Offaly |
modifications to the Birr Primary Care Centre Ambulance Base granted under planning ref. 22/404 as follows;
1) Adjustment to the position of the proposed ambulance base building upon the site, proposed between 3.4 - 4.2 metres closer to the rear of the site; 2) Addition of a 27.5m2 secure caged external compound to the rear of the ambulance base building, including a portion of perimeter screening wall; 3) Addition of a 2.4m high perimeter fence to the ambulance base portion of the development, for ... login required. |
Details... |
1.8km |
23/09/2024 |
N/A |
Proposed Birr Primary Care Centre Development , Railway Road Townparks , Birr Co. Offaly |
The development will consist of: modifications to the Birr Primary Care Centre Ambulance Base granted under planning ref. 22/404 as follows;
1) Adjustment to the position of the proposed ambulance base building upon the site, proposed between 3.4 - 4.2 metres closer to the rear of the site; 2) Addition of a 27.5m2 secure caged external compound to the rear of the ambulance base building, including a portion of perimeter screening wall; 3) Addition of a 2.4m high perimeter fence to the ambulance base portion of the d... login required. |
Details... |
1.4km |
06/08/2024 |
CONDITIONAL |
GRANT ENGINEERING CRINKILL , BIRR , CO. OFFALY R42D788 |
CONSTRUCTION OF A PROPOSED SINGLE STOREY EXTENSION INCORPORATING STORES , PRODUCTS ASSEMBLY, DISPATCH AND LOADING BAY CANOPY TO THE SOUTH OF THE EXISTING FACTORY INCORPORATING OFFICES, CANTEEN AND TOILETS BLOCK WITHIN, INCLUDING 20 ADDITIONAL PARKING SPACES AND ALL ASSOCIAT... login required. |
Details... |
1.3km |
15/07/2024 |
CONDITIONAL |
GRANT ENGINEERING CRINKILL , BIRR , CO. OFFALY R42 D788 |
THE INSTALLATION OF A ROOFTOP SOLAR PHOTOVOLTAIC ARRAY (3,602 SQ.M) ON EXISTING FACTORY BUILDINGS AND ALL ASSOCIATED ELECTRICAL INFRASTRUCTURE. THIS BUILDING... login required. |
Details... |
1.3km |
05/07/2024 |
N/A |
GRANT ENGINEERING IRELAND ULC , CRINKILL , BIRR CO. OFFALY |
PERMISSION FOR INSTALLATION OF A ROOFTOP SOLAR PHOTOVOLTAIC ARRAY (3602SQ.M) ON EXISTING FACTORY BUILDINGS AND ALL ASSOCIATED ELECTRICAL INFRASTUCTURE ... login required. |
Details... |
1.8km |
08/06/2024 |
REFUSED |
CRINKILL , BIRR , CO. OFFALY |
PERMISSION FOR THE CONSTRUCTION OF A SINGLE-STORY REAR EXTENSION TO EXISTING SINGLE STORY DERELICT COTTAGE, RECESSED ENTANCE, PERMISSION FOR NEW ROOF ON EXISTING... login required. |
Details... |
1.8km |
05/06/2024 |
N/A |
CRINKILL , BIRR , CO. OFFALY |
CONSTRUCTION OF A SINGLE-STORY REAR EXTENSION TO EXISTING SINGLE STORY COTTAGE, RECESSED ENTANCE, PERMISSION FOR NEW ROOF ON EXISTING COTTAGE AND PERMISSION FOR REMODELLING AND RENOVATION WORKS TO EXISTING COTTAGE INCLUDING NEW WINDOW ARRANGEMENT ON FRONT FAÇADE AND ALL ASSOCIATED SITE WORKS.... login required. |
Details... |
1.8km |
17/05/2024 |
N/A |
CRINKILL , BIRR , CO. OFFALY |
PERMISSION FOR THE CONSTRUCTION OF A SINGLE-STORY REAR EXTENSION TO EXISTING SINGLE STORY COTTAGE, RECESSED ENTANCE, PERMISSION FOR NEW ROOF ON EXISTING COT... login required. |
Details... |
2.4km |
30/04/2024 |
CONDITIONAL |
Bohredeel , Crinkill , Birr Co Offaly |
for existing domestic garage, fuel shed/storage, home office and all associated siteworks.... login required. |
Details... |
1.8km |
11/04/2024 |
N/A |
Railway Road Townparks & Seffin , Birr , Co. Offaly |
the construction of 66 total no. residential units comprising of: (A) 20no. dwellings, comprising of 8no. four-bedroom two-storey detached houses (Type A); 8no. four-bedroom two-storey semi-detached houses (Type B1/B2); 2no. two-storey three-bedroom dual aspect semi-detached houses (Type C1/C2); 2no. two-storey three-bedroom dual aspect semi-detached houses (Type C3/C4); (B) 46no. build-to-rent apartments in 4 no. separate 3-storey blocks, comprising of 20no. one-bedroom ground floor apartments (Type D1/D2) with 20no. two-bedroom first floor duplex apartments (Type E1/E2) in three blocks, and 2no. one-bedr... login required. |
Details... |
1.7km |
11/04/2024 |
N/A |
Townparks & Seffin , Birr , Co. Offaly |
the construction of 58 total no. residential units comprising of: (A) 2no. three-bedroom two-storey semi-detached (Type H); 1no. 2-bedroom bungalow (Type L2); 10no. 1&2-bedroom terraced bungalows in three blocks (Type L3/L4); 12no. two-bedroom two-storey terraced units in two blocks (Type M); and 4no. two-bedroom two-storey terraced units (Type N) (Total 29no. dwellings) at Macregol Páirc; (B) 8no. four-bedroom two-storey detached house (Type P); 1no.two-storey detached four-bedroom house (Type A2); 14no. two-storey four-bedroom semi-detached ... login required. |
Details... |
1.7km |
04/04/2024 |
N/A |
Townparks & Seffin , Birr , Co. Offaly |
the construction of 58 total no. residential units comprising of: (A) 2 no. three-bedroom two-storey semi-detached (Type H); 1no. 2-bedroom bungalow (Type L2); 10no. 1&2-bedroom terraced bungalows in three blocks (Type L3/L4); 12no. two-bedroom two-storey terraced units in two blocks (Type M); and 4no. two-bedroom two-storey terraced units (Type N) (Total 29no. dwellings) at Macregol Páirc; (B) 8no. four-bedroom two-storey detached house (Type P); 1no.two-storey detached four-bedroom house (Type A2); 14no. two-storey four-bedroom semi-detached... login required. |
Details... |
1.8km |
04/04/2024 |
N/A |
Railway Road Townparks & Seffin , Birr , Co. Offaly |
the construction of 66 total no. residential units comprising of: (A) 20no. dwellings, comprising of 8no. four-bedroom two-storey detached houses (Type A); 8no. four-bedroom two-storey semi-detached houses (Type B1/B2); 2no. two-storey three-bedroom dual aspect semi-detached houses (Type C1/C2); 2no. two-storey three-bedroom dual aspect semi-detached houses (Type C3/C4); (B) 46no. build-to-rent apartments in 4 no. separate 3-storey blocks, comprising of 20no. one-bedroom ground floor apartments (Type D1/D2) with 20no. two-bedroom first floor duplex apartments (Type E1/E2) in three blocks, and 2no. one-bedr... login required. |
Details... |
2.9km |
20/03/2024 |
CONDITIONAL |
BALLINDARRA RIVERSTOWN , BIRR , CO. OFFALY |
(A) CONVERSION OF ATTIC SPACE TO LIVING ACCOMMODATION AND ALTERATIONS TO DOMESTIC GARAGE PREVIOUSLY GRANTED PERMISSION UNDER PL2/02/741. (B) RETENTION PERMISSION OF ADDITIONAL DOMESTIC GARAGE/FUEL SHED, ... login required. |
Details... |
1.9km |
15/03/2024 |
N/A |
Roscrea Road , Birr , Co. Offaly |
(i) single storey building (c.15 sq.m), overground self-bunded fuel storage tank, and associated site works, AND (ii) Permission for alterations to existing front boundary fence including the formation of a second entrance and all associated site works... login required. |
Details... |
1.8km |
14/03/2024 |
CONDITIONAL |
LEINSTER VILLAS , CRINKLE , BIRR CO OFFALY |
2 X TWO STOREY DWELLINGS, TWO GARAGES, TWO NEW ENTRANCES, WITH CONNECTIONS TO MAINS PUBLIC SERVICES AND ALL ANCILLARY SITE WORKS... login required. |
Details... |
1.9km |
13/03/2024 |
N/A |
Roscrea Road , Birr , Co. Offaly |
(i) single storey building (c.15 sq.m), overground self-bunded fuel storage tank, and associated site works, AND (ii) Permission for alterations to existing front boundary fence including the formation of a second entrance and all associated site works... login required. |
Details... |
1.8km |
06/03/2024 |
N/A |
LEINSTER VILLAS , CRINKLE , BIRR CO OFFALY |
2 X TWO STOREY DWELLINGS, TWO GARAGES, TWO NEW ENTRANCES, WITH CONNECTIONS TO MAINS PUBLIC SERVICES AND ALL ANCILLARY SITE WORKS... login required. |
Details... |
1.8km |
27/02/2024 |
CONDITIONAL |
CREE , FORTAL , BIRR CO. OFFALY |
THE CONSTRUCTION OF A LIVESTOCK SHED WITH UNDERGROUND EFFLUENT STORAGE TANK AND ADJOINING HANDLING AREA, INCLUDING ALL ASSOICATED SITE WORKS... login required. |
Details... |
2.2km |
23/02/2024 |
CONDITIONAL |
Fortal , Birr , Co. Offaly |
A new slatted livestock shed including effluent tanks and all associated site works.... login required. |
Details... |