2.8km |
04/10/2024 |
N/A |
Ballystanley , Dunkerrin Roscrea , Co Offaly |
extension to rear of existing house to include increased kitchen, living space along with attic conversion to include storage area home office space along with revised site boundaries... login required. |
Details... |
2.8km |
26/05/2024 |
N/A |
Cloneen , Roscrea , Co Tipperary |
the erection of a 2 storey four bedroom house adjacent to the existing 2 storey house, a new wastewater unit and associated works, alterations to entrance to achieve sight lines, minor alterations to the existing house and ancillary related works... login required. |
Details... |
2.7km |
16/05/2024 |
N/A |
Cloneen , Roscrea , Co Tipperary |
the erection of 2 storey four bedroom house adjacent to existing 2 storey house, a new wastewater unit and associated works, alterations to entrance to achieve sight lines, minor alterations to the existing house and ancillary related works... login required. |
Details... |
2.3km |
11/01/2024 |
CONDITIONAL |
BALLYSTANLY , ROSCREA , CO. OFFALY |
CONSTRUCTION OF A NEW DWELLING WITH A NEW GARAGE, A NEW ENTRANCE, A NEW SEPTIC TANK AND PERCOLATION AREA AND A NEW WELL AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
430m |
03/01/2024 |
CONDITIONAL |
Cloncracken , Roscrea , Co. Tipperary |
Upgraded Septic Tank and installed secondary treatment system with polishing filter and all associated site works... login required. |
Details... |
2.3km |
19/12/2023 |
N/A |
BALLYSTANLY , ROSCREA , CO. OFFALY |
CONSTRUCTION A NEW DWELLING WITH A NEW GARAGE, A NEW ENTRANCE, A NEW SEPTIC TANK AND PERCOLATION AREA AND A NEW WELL AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.3km |
28/11/2023 |
N/A |
BALLYSTANLY , ROSCREA , CO. OFFALY |
CONSTRUCTION OF A NEW DWELLING WITH A NEW GARAGE, A NEW ENTRANCE, A NEW SEPTIC TANK AND PERCOLATION AREA AND A NEW WELL AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
420m |
13/09/2023 |
N/A |
Cloncracken , Roscrea , Co. Tipperary |
the upgrade of septic tank and to install a secondary treatment system with polishing filter and all associated site works... login required. |
Details... |
950m |
29/08/2023 |
N/A |
Inane , Roscrea , Co. Tipperary |
wood pellet storage silo and all associated site works... login required. |
Details... |
2.3km |
24/10/2022 |
CONDITIONAL |
BALLYSTANLY , ROSCREA , CO. OFFALY |
AN UNDERGROUND SLURRY STORAGE TANK AS CONSTRUCTED, COMPLETED WITH ASSOCIATED SITEWORKS. PERMISSION TO CONSTRUCT A NEW FARM BUILDING TO CONTAIN NEW MILKING PARLOUR, DAIRY, CUBICLES AREA FOR LIVESTOCK, HANDLING ... login required. |
Details... |
1.3km |
26/07/2022 |
CONDITIONAL |
MOUNTHEATON , ROSCREA , CO. OFFALY |
ALTERATIONS TO FRONT FAÇADE OF MAIN DWELLING, REMOVE EXISTING FRONT BOUNDARY WALL & REPLACE WITH NEW ENTRANCE & FRONT BOUNDARY WALL IN NEW POSITION ALL WITH ASSOCIATED SITE WORKS... login required. |
Details... |
1.9km |
25/05/2022 |
CONDITIONAL |
Parkmore , Roscrea , Co. Tipperary |
shower toilet and kitchen as part of office suite... login required. |
Details... |
1.9km |
21/03/2022 |
CONDITIONAL |
Stapleton Bakeries (Roscrea) Ltd , Parkmore , Roscrea Co. Tipperary |
1) changes to building made since grant of planning permissions in 2001, including additional mezzanine floor area and external maintenance access stair, change of use of part of 1st floor to use as an apartment, change in position of No. 2 stairs... login required. |
Details... |
1.9km |
14/03/2022 |
N/A |
Stapleton Bakeries (Roscrea) Ltd , Parkmore , Roscrea Co. Tipperary |
1.) changes to building made since Grant of planning permissions in 2001, including additional mezzanine floor area, and external maintenance access stair. Change of use of part of 1st floor to use as ... login required. |
Details... |
1.9km |
02/03/2022 |
N/A |
Stapleton Bakeries (Roscrea) Ltd , Parkmore , Roscrea Co. Tipperary |
changes to building made since grant of planning permissions in 2001, including additional mezzanine floor area, ESB sub station and third tall silo and exte... login required. |
Details... |
1.7km |
02/03/2022 |
CONDITIONAL |
Carrick , Roscrea , Co. Tipperary |
extension to side of existing house with new Wastewater Treatment System and Tertiary Filter and all associated site works... login required. |
Details... |
930m |
09/02/2022 |
N/A |
Inane , Roscrea , Co. Tipperary |
EXTENSION TO EXISTING DRY SOW HOUSE, NEW STAFF FACILITIES INCLUDING CANTEEN, TOILETS, SHOWERS, OFFICE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.2km |
03/02/2022 |
N/A |
Pintown and Irby , Roscrea , Co Tipperary |
construction of a proposed two-storey dwelling, domestic garage, a proposed wastewater treatment system with percolation area and all associated siteworks including a site entrance... login required. |
Details... |
1.2km |
21/01/2022 |
N/A |
Pintown and Irby , Roscrea , Co Tipperary |
construction of a proposed two-storey dwelling, domestic garage, a proposed wastewater treatment system with percolation area and all associated siteworks including a site entrance... login required. |
Details... |
2km |
23/12/2021 |
UNCONDITIONAL |
Parkmore , Roscrea |
(a) indefinite retention of a bike shelter, a control panel shelter, an emergency response base, alterations to the forklift charging building, an extension of the Lairage, the enclosure of an external loading dock, 2 no plant rooms, 3 no prefabricated offices, a smoking shelter & a sow shed, (b) permission to erect extension to the existing factory to accommodate a replacement pre-slaughter pig stunning inst... login required. |
Details... |