1.2km |
08/04/2024 |
N/A |
Cloncannon Creamery , Cloncannon , Moneygall Co Tipperary |
to construct external home office / hobby room to the rear of the existing house along with all ancillary site works... login required. |
Details... |
2.2km |
13/11/2023 |
CONDITIONAL |
Ballybeg , Toomevara , Nenagh |
the erection of a dwelling, garage, entrance and wastewater treatment system including associated site works... login required. |
Details... |
2.3km |
22/10/2022 |
CONDITIONAL |
Ballybeg , Toomevara , Co. Tipperary |
the erection of a dwelling, garage, entrance, well bore and wastewater treatment system, incl. associated site works ... login required. |
Details... |
3km |
07/09/2022 |
CONDITIONAL |
MONEYGALL FOOTBALL CLUB MONEYGALL , BIRR , CO. OFFALY |
CONSTRUCTION OF A SINGLE STOREY COMMUNITY CENTRE COMPRISING OF MEETING ROOM, 2 NO. CHANGING ROOMS, TOILETS, SHOWER AREAS, OFFICIALS ROOM, STORAGE ROOMS, KITCHEN, PLANT ROOM AND INCLUDING ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2km |
18/11/2021 |
CONDITIONAL |
Ballybeg , Toomevara , Co Tipperary |
alterations to existing dwelling to include; changes to elevations and extensions to the rear and side and all ancillary works... login required. |
Details... |
520m |
28/10/2021 |
CONDITIONAL |
Cloncannon , Moneygall , Co. Tipperary |
the erection of a dwelling, garage, entrance and wastewater treatment system, including associated site works... login required. |
Details... |
2.5km |
12/07/2021 |
CONDITIONAL |
MONEYGALL , BIRR , CO. OFFALY |
THE ERECTION OF A DWELLING, GARAGE, ENTRANCE, WELL AND WASTEWATER TREATMENT SYSTEM, INCLUDING ALL ASSOCIATED SITEWORKS... login required. |
Details... |
2.5km |
16/04/2021 |
CONDITIONAL |
MONEYGALL , BIRR , CO. OFFALY |
CONSTRUCTION OF AN ENTRANCE, DWELLING HOUSE, PRIVATE WELL AND DOMESTIC WASTEWATER TREATMENT SYSTEM WITH PERCOLATION AREA TOGETHER WITH ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.4km |
22/03/2021 |
CONDITIONAL |
MONEYGALL , BIRR , CO. OFFALY |
CONSTRUCTION OF A DWELLING, GARAGE, ENTRANCE, WASTE WATER TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS.... login required. |
Details... |
2.7km |
12/03/2021 |
CONDITIONAL |
Ballybeg , Toomevara , Nenagh |
part two storey, part single storey dwelling house, detached domestic garage, store and home gym, onsite wastewater treatment system, borewell, entrance and boundary treatment, together with associated site works... login required. |
Details... |
3km |
08/03/2021 |
CONDITIONAL |
ELDERBERRY DRIVE MONEYGALL , BIRR , CO. OFFALY |
AN ALL WEATHER TRAINING AREA WITH FENCING AND FLOODLIGHTS... login required. |
Details... |
2.9km |
11/02/2021 |
N/A |
MONEYGALL , BIRR , CO. OFFALY |
AN ALL-WEATHER TRAINING AREA WITH FENCING AND FLOODLIGHTS... login required. |
Details... |
2km |
09/02/2021 |
CONDITIONAL |
RATHMOYLE , MONEYGALL , CO. OFFALY |
CONSTRUCTION OF (1) A MILKING PARLOUR INCLUDING DAIRY AND ASSOCIATED STORES, SLATTED COLLECTING YARD, CATTLE HANDLING AREA AND COW DRAFTING AREAS, (2) A SLATTED CUBICLE HOUSE INCLUDING ASSOCIA... login required. |
Details... |
3km |
05/02/2021 |
CONDITIONAL |
MONEYGALL FOOTBALL CLUB , MONEYGALL , BIRR CO. OFFALY |
A NEW COMMUNITY CENTRE CONSISTING OF MEETING ROOM, STORE, CLEANERS STORE, KITCHEN, OFFICIALS ROOM, MALE W.C., FEMALE W.C., ACCESSIBLE W.C., 2 NO. CHANGING ROOMS WITH ADJOINING SHOWER AREAS, CONNECTION TO EXISTING WATER MAINS AND FOUL SEWER AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.8km |
13/01/2021 |
CONDITIONAL |
Ballybeg and Aghnameadle , Toomevara , Co. Tipperary |
extension of sand and gravel quarry - the development will consist of extension of the existing sand and gravel quarry and for continued use of the site entrance, access laneway, weighbridge, maintenance shed, settlement lagoons, site off... login required. |
Details... |