490m |
15/10/2024 |
N/A |
Ballywilliam , Shinrone , Birr Co. Offaly |
New Dwelling House, New Entrance, New Septic Tank with Percolation Area and all associated Site Works... login required. |
Details... |
1000m |
17/05/2024 |
CONDITIONAL |
Newtown , Shinrone , Birr Co. Offaly |
Extension to the existing domestic garage and all associated site works... login required. |
Details... |
1.8km |
21/03/2024 |
CONDITIONAL |
Kyleogue , Shinrone Birr , Co. Offaly |
demolition of an existing concrete outbuilding and construction of a new single storey garden building. The development is in the curtilage of a protected structure... login required. |
Details... |
2.7km |
19/04/2023 |
CONDITIONAL |
FRANKFORT , DUNKERRIN , CO. OFFALY |
PREVIOUSLY CONSTRUCTED EXTENSION AND PERMISSION TO RENOVATE AND EXTEND DWELLING HOUSE, DEMOLISH EXISTING STORAGE SHED, UPGRADE EXISTING WASTE WATER SYSTEM AND ALL ANCILLARY SITE WORKS... login required. |
Details... |
2.7km |
06/04/2023 |
CONDITIONAL |
AGHNAGROSS , SHINRONE BIRR , CO. OFFALY |
CONSTRUCTION OF A NEW FARM BUILDING FOR THE HOUSING OF LIVESTOCK INCLUDING A SLATTED AREA OVER AN UNDERGROUND SLURRY STORAGE TANK AND A SOLID FLOOR LIEBACK AREA, CO... login required. |
Details... |
2.7km |
06/04/2023 |
CONDITIONAL |
CORRACLEVIN , DUNKERRIN BIRR , CO. OFFALY |
THE RENOVATION AND EXTENSION OF THE EXISTING DWELLING, THE CONSTRUCTION OF A NEW ENTRANCE, GARAGE, STORAGE SHED AND WASTEWATER TREATMENT SYSTEM, INCLUDING ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.9km |
03/04/2023 |
CONDITIONAL |
CORRACLEVIN SHINRONE , BIRR , CO. OFFALY |
ONE EXISTING SEPTIC TANK, DWELLING, GARAGE, TIMBER SHEDS, ENTRANCE AND ASSOCIATED SITE WORKS. PERMISSION FOR A NEW WASTEWATER TREATMENT SYSTEM AND TWO NEW PERCOLATION AREAS... login required. |
Details... |
2.9km |
22/03/2023 |
CONDITIONAL |
BALLYRIHY , DUNKERRIN BIRR , CO. OFFALY |
A NEW DWELLING HOUSE, DOMESTIC GARAGE, NEW SITE ENTRANCE, SEPTIC TANK AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.9km |
03/03/2023 |
N/A |
CORRACLEVIN , SHINRONE BIRR , CO. OFFALY |
AND PERMISSION OF TWO SEPTIC TANKS, PERCOLATION AREA, DWELLING, ENTRANCE AND ASSOCIATED SITE WORKS... login required. |
Details... |
2.9km |
03/02/2023 |
N/A |
COORACLEVIN SHINRONE , BIRR , CO. OFFALY |
AS-BUILT DWELLING, ENTRANCE AND ASSOCIATED SITE WORKS. PERMISSION FOR NEW SEPTIC/TREATMENT TANKS AND PERCOALTION AREA ... login required. |
Details... |
2.1km |
01/04/2022 |
CONDITIONAL |
MILLTOWN PARK MILLTOWN , SHINRONE , CO. OFFALY |
CONSTRUCTION OF AN OVERGROUND SLURRY STORAGE TOWER, UNDERGROUND HOLDING TANK AND ASSOCIATED SITE WORKS... login required. |
Details... |
2.1km |
28/01/2022 |
N/A |
MILLTOWN PARK , MILLTOWN SHINRONE , CO. OFFALY |
CONSTRUCTION OF AN OVERGROUND SLURRY STORAGE TOWER, UNDERGROUND HOLDING TANK AND ASSOCIATED SITE WORKS... login required. |
Details... |
2.3km |
22/11/2021 |
CONDITIONAL |
CLUCKA SOUTH SHINRONE , BIRR , CO. OFFALY |
THE CONSTRUCTION OF A DORMER STYLE DWELLING HOUSE, DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM, SITE ENTRANCE AND ALL ANCILLARY SITE WORKS THERETO... login required. |
Details... |
2.1km |
02/11/2021 |
CONDITIONAL |
KEELOGE , SHINRONE , CO. OFFALY |
AMENDMENT OF DWELLING, PREVIOUSLY GRANTED PLANNING PERMISSION UNDER PLANNING REFERENCE NUMBER 20/153, FROM STOREY AND A HALF DWELLING TO DORMER DWELLING. (INSTALLATION OF SEPTIC TANK WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKS REMAIN UNCHANGED).... login required. |
Details... |
1.9km |
01/10/2021 |
CONDITIONAL |
GLASSHOUSE , SHINRONE , CO. OFFALY |
FILLING QUARRIED LAND WITH TOPSOIL, SUBSOIL TO RAISE LEVEL OF LAND FOR AGRICULTURAL PURPOSES... login required. |
Details... |
1.9km |
31/08/2021 |
N/A |
GLASSHOUSE , SHINRONE , CO. OFFALY |
FILLING QUARRIED LAND WITH TOPSOIL, SUBSOIL TO RAISE LEVEL OF LAND FOR AGRICULTURAL PURPOSES... login required. |
Details... |
3km |
23/06/2021 |
N/A |
COOLROE & RUSHEEN , SHINRONE BIRR , CO. OFFALY |
THE CONSTRUCTION OF A CUBICLE SHED. THE CONSTRUCTION OF A MILKING PARLOUR/DAIRY WITH ANCILLARY YARDS/STORAGE & A MEAL BIN. THE CONSTRUCTION OF A SILAGE BASE, INCLUDING ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.2km |
09/06/2021 |
CONDITIONAL |
NEWTOWN , SHINRONE BIRR , CO. OFFALY |
CONSTRUCTION OF A NEW DWELLING HOUSE WITH ATTACHED CARPORT, PRIVATE GARAGE, SITE ENTRANCE, BORED WELL, WASTEWATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS ... login required. |
Details... |
760m |
15/04/2021 |
CONDITIONAL |
GLASSHOUSE , SHINRONE BIRR , CO. OFFALY |
A SLATTED LIVESTOCK CUBICLE SHED, UNDERGROUND SLURRY STORAGE TANKS AND ALL ANCILLARY ASSOCIATED SITE WORKS... login required. |
Details... |