20m |
03/09/2024 |
N/A |
Faddan , Carrig Birr , Co. Offaly |
to retain existing shed... login required. |
Details... |
2.8km |
13/05/2024 |
N/A |
Caherhoereigh , Carrig , Birr |
a proposesd two-storey dwelling, domestic outbuilding, a proposed septic tank and percolation area, all associated siteworks, including a proposed site entrance... login required. |
Details... |
1.2km |
28/02/2024 |
CONDITIONAL |
Ballaghgar , Carrig Birr , Co. Tipperary |
2 number outbuildings for storage use ancillary to the existing dwelling and 4 number dormer roof windows previously granted as flat roof windows under planning permission number 03510002... login required. |
Details... |
1.8km |
02/02/2024 |
CONDITIONAL |
Clohaskin , Carrig , Birr |
addition & alterations to existing dwelling house and all ancillary site works... login required. |
Details... |
1.8km |
22/01/2024 |
CONDITIONAL |
Ballaghgar , Carrig , Birr Co. Tipperary |
the existing agricultural livestock shed. Planning Permission is also sought for the construction of: 1) an extension of the existing agricultural livestock shed, incorporating cubicles for dairy cows; 2) an agricultural shed, incorporating milkin... login required. |
Details... |
750m |
22/09/2023 |
REFUSED |
In the townlands of Croghan Clohaskin Caherhoereigh Ballykinash Tinnakilly Arragh More Ballyloughnane Faddan Beg Coolderry , Tinlough Sharragh Doughkill Ballaghgar Faddan More , Cloncorig Killeen and Cornhill Co. Tipperary |
(1) The construction of 7 no. wind turbines and associated hardstand areas with the following parameters a) total tip height range of 179.5m – 185m, b) rotor diameter range of 149m – 163m, c) hub height range of 103.5m to 110.5m; (2) 1 no. permanent 38kV electrical substation which will be constructed in the townland of Faddan Beg consisting of a single storey control building with welfare facilities, all associated electrical plant and equipment, battery energy storage system, security fencing, all associated underground cabling, wastewater holding tank and all ancillary works and equipment; (3) All works (within County Tipperary) associated with the connection of the proposed wind farm to the national electricity grid, via the provision of underground electrical cabling (38kV) to the existing Dallow 110kV substation in the townland of Clondallow, Co. Offaly; (4) Provision of 10 no. joint bays, communication chambers and earth sheath links along the underground electrical cabling route; (5) reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; (6) all associated underground electrical and communications cabling ... login required. |
Details... |
2.9km |
12/07/2023 |
CONDITIONAL |
Lacka , Riverstown , Co Tipperary |
A.) renovation, alterations and extension to existing dwelling house; B.) Renovation of existing domestic shed/store; C.) Installation of septic tank/ETS and percolation area; D.) Installation of Bored well and associated site works... login required. |
Details... |
2.9km |
19/06/2023 |
CONDITIONAL |
Gurteen College , Ballingarry Roscrea , CO. Tipperary |
new 2 storey classroom building comprising of 6 no. general classrooms, sanitary and ancillary facilities, external works to include new internal pedestrian campus route and related soft landscaping, 38 no. existing carpar... login required. |
Details... |
2.8km |
02/06/2023 |
N/A |
Gurteen College , Ballingarry Roscrea , CO. Tipperary |
new 2 storey classroom building, with a site area of 630sq.m comprising of 6 No. general classrooms, sanitary and ancillary facilities. External works to include new internal pedestrian campus route a... login required. |
Details... |
1.5km |
27/04/2023 |
CONDITIONAL |
Carrig & Riverstown Community Hall , Carrig Birr , Co. Tipperary |
the construction of a single storey lean-to store building on the west elevation of the existing hall with all associated site works... login required. |
Details... |
1.6km |
25/03/2023 |
CONDITIONAL |
Clonraskin , Carrig , Birr Co. Tipperary |
dwelling, entrance, garage, sewage treatment system and all ancillary works... login required. |
Details... |
1.4km |
14/10/2022 |
CONDITIONAL |
Ballygar , Carrig , Birr |
fuel shed/domestic garage and small fuel drying shed and all associated site works ... login required. |
Details... |
2.6km |
16/05/2022 |
CONDITIONAL |
Lacka , Carrig , Birr |
new storage and wood chipping shed and associated site works... login required. |
Details... |
570m |
13/09/2021 |
N/A |
Leitrim , Fadden More , Carrig Co. Tipperary |
construction of a new dwelling with attic space, new septic tank and percolation area and associated site works... login required. |
Details... |
2.9km |
15/01/2021 |
N/A |
Sharragh Pig Farm , Lissernane , Rathcabbin Co. Tipperary |
farm access roads, hard standing and an open field drain (the pig farm has an EPA licence ref no. PO437-02)... login required. |
Details... |
2.7km |
15/01/2021 |
N/A |
Sharragh Pig Farm , Lissernane , Rathcabbin Co. Tipperary |
demolition of three pig houses and erection of two pig houses on the same site and associated site works. This development was granted permission under Pl. Ref. Nos. 12/510003 and 15/600115 subject to a completion date which expir... login required. |
Details... |