2km |
19/11/2024 |
N/A |
Mertonhall , Borrisokane , Co Tipperary |
(1) as constructed, changes to the new storey and a half extension to the rear of our existing dwelling house including changes to the new single storey link joining the new extension to the existing dwelling house. The extension was granted under planning reference number 2260507. The changes consist of new higher ridge height level to extension; omission of back porch to... login required. |
Details... |
3km |
15/11/2024 |
N/A |
Pallas West , Toomevara , Co. Tipperary |
construction of a slatted cattle house with underground slurry storage, ancillary concrete years and all associated site works... login required. |
Details... |
2km |
24/06/2024 |
CONDITIONAL |
Garrynafana , Ballymackey Nenagh , Co. Tipperary |
a new single storey dwelling; proposed new treatment system & percolation area; proposed new entrance access onto public road; all associated site works and ancillary services
... login required. |
Details... |
1.8km |
20/06/2024 |
CONDITIONAL |
Garrynafana , Toomevara , Co. Tipperary |
a) the alterations to existing two storey detached dwelling; b) new single storey extensions to southeast and northwest elevation of existing dwelling; c) new treatment system & ... login required. |
Details... |
2.9km |
25/04/2024 |
CONDITIONAL |
Cloonmore , Ballymackey , Nenagh |
the erection of a dwelling, garage, entrance and wastewater treatment system, including associated works... login required. |
Details... |
2.4km |
21/04/2023 |
CONDITIONAL |
RATH BROWNSTOWN , CLOUGHJORDAN , CO. OFFALY |
THE RENOVATION AND EXTENSION OF THE EXISTING DWELLING, INCLUDING ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.9km |
17/02/2023 |
CONDITIONAL |
Wilton , Ballymackey , Nenagh |
the construction of a new herringbone milking parlour/dairy, slatted shed with cubicles, new manure pit and ancillary works (concrete yards, minor handling facilities and effluent tanks) in existing farmyard area and the provision of a new farm road and entrance... login required. |
Details... |
2.4km |
16/01/2023 |
CONDITIONAL |
Garrynafana , Toomevara Nenagh , Co Tipperary |
revisions to the proposed renovation & extension granted under planning permission 2260258... login required. |
Details... |
2.4km |
28/09/2022 |
CONDITIONAL |
Knockane , Toomevara , Co Tipperary |
a dwelling house, entrance, detached domestic garage, septic tank and percolation area and all ancillary site works... login required. |
Details... |
1.8km |
20/09/2022 |
CONDITIONAL |
BROWNSTOWN , CLOUGHJORDAN , CO. OFFALY |
RETENTION OF GARAGE TO REAR OF EXISTING DWELLING... login required. |
Details... |
770m |
19/08/2022 |
CONDITIONAL |
Woodville , Ballymackey , Nenagh Co Tipperary |
the construction of air vent stack units to service ventilation of the proposed pig houses granted under previous planning grant file ref:20211, incl assoc. siteworks... login required. |
Details... |
2.5km |
01/07/2022 |
CONDITIONAL |
Garrynafana , Toomevara , Co Tipperary |
a cubicle shed extension and all associated site works... login required. |
Details... |
2.8km |
02/06/2022 |
CONDITIONAL |
SILVERHILL , CLOUGHJORDAN , CO. OFFALY |
A NEW DWELLING HOUSE, DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM, DRIVEWAY AND ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.4km |
27/05/2022 |
CONDITIONAL |
Garrynafana , Toomevara Nenagh , Co Tipperary |
renovation and extension of existing dwelling house, upgrade waste water treatment system, relocate existing entrance along with all ancillary site works... login required. |
Details... |
2.8km |
24/05/2022 |
N/A |
SILVERHILLS , CLOUGHJORDAN , CO. OFFALY |
A NEW DWELLING HOUSE, DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM, DRIVEWAY AND ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.6km |
20/01/2022 |
N/A |
Clonteige , Ballymackey , Nenagh |
construct new dwelling, store/garage, sewer treatment unit and percolation area, new entrance and ancillary works... login required. |
Details... |
2.4km |
14/01/2022 |
CONDITIONAL |
Cloonmore , Ballymackey , Nenagh |
a) construction of a new, part two-storey, part single-storey detached dwelling; b) new detached garage; c) new site entrance; d) new connections to existing utilities; e) new waste-water treatment system & percolation area; f) all associated site works... login required. |
Details... |
2.6km |
23/12/2021 |
N/A |
Clonteige , Ballymackey , Nenagh |
new dwelling, store/garage, sewer treatment unit, percolation area, new entrance and ancillary works... login required. |
Details... |
260m |
12/10/2021 |
CONDITIONAL |
Falleen , Toomevara , Co Tipperary |
domestic garage revised position as constructed from previously granted permission ref no. 07/511337... login required. |
Details... |