2.8km |
22/07/2024 |
CONDITIONAL |
MONEYGALL FOOTBALL CLUB , ELDERBERRY DRIVE MONEYGALL , BIRR CO. OFFALY |
INSTALLATION OF TWO NUMBER SEATED STANDS IN THE FORM OF RECYCLED SHIPPING CONTAINERS AND ASSOCIATED WORKS... login required. |
Details... |
2.8km |
12/07/2024 |
N/A |
ELDERBERRY DRIVE , MONEYGALL , BIRR |
INSTALL TWO NUMBER SEATED STANDS IN THE FORM OF RECYCLED SHIPPING CONTAINERS AND ASSOCIATED WORKS... login required. |
Details... |
2.5km |
07/06/2023 |
CONDITIONAL |
BALLINTEMPLE , CLOUGHJORDAN , CO. OFFALY |
CONSTRUCTION OF A CATTLE HOUSE WITH SLATTED AND SOLID CONCRETE FLOORS, UNDERGROUND SLURRY STORAGE, ANCILLARY CONCRETE AND ALL ASSOCIATED SITE WORKS. THE DEVELOPMENT IS IN THE CURTILAGE OF A PROTECTED STRUCTURE TEMPLEHARRY RECTORY... login required. |
Details... |
2.1km |
02/05/2023 |
CONDITIONAL |
BALLINTEMPLE , CLOUGHJORDAN , CO. OFFALY |
A NEW DWELLING, SITE ENTRANCE, DRIVEWAY, SEPTIC TANK, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.8km |
21/04/2023 |
CONDITIONAL |
RATH BROWNSTOWN , CLOUGHJORDAN , CO. OFFALY |
THE RENOVATION AND EXTENSION OF THE EXISTING DWELLING, INCLUDING ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.5km |
20/09/2022 |
CONDITIONAL |
BROWNSTOWN , CLOUGHJORDAN , CO. OFFALY |
RETENTION OF GARAGE TO REAR OF EXISTING DWELLING... login required. |
Details... |
2.8km |
07/09/2022 |
CONDITIONAL |
MONEYGALL FOOTBALL CLUB MONEYGALL , BIRR , CO. OFFALY |
CONSTRUCTION OF A SINGLE STOREY COMMUNITY CENTRE COMPRISING OF MEETING ROOM, 2 NO. CHANGING ROOMS, TOILETS, SHOWER AREAS, OFFICIALS ROOM, STORAGE ROOMS, KITCHEN, PLANT ROOM AND INCLUDING ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.4km |
02/06/2022 |
CONDITIONAL |
SILVERHILL , CLOUGHJORDAN , CO. OFFALY |
A NEW DWELLING HOUSE, DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM, DRIVEWAY AND ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.4km |
24/05/2022 |
N/A |
SILVERHILLS , CLOUGHJORDAN , CO. OFFALY |
A NEW DWELLING HOUSE, DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM, DRIVEWAY AND ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.6km |
24/03/2022 |
CONDITIONAL |
EMMEL , CLOUGHJORDAN , CO. OFFALY |
CONSTRUCTION OF DWELLING, DOMESTIC GARAGE, SITE ENTRANCE AND BOUNDARY WALLS, ON-SITE EFFLUENT TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE DEVELOPMENT WORKS. THIS APPLICATION RELATES TO THE CURTILAGE OF A PROTECTED STRUCTURE. ... login required. |
Details... |
1.8km |
11/02/2022 |
CONDITIONAL |
KNOCKASPUR , CLOUGHJORDAN , CO. OFFALY |
ERECTION OF A NEW ENTRANCE FROM LANDS TO PUBLIC ROAD FOR AGRICULTURAL PURPOSES AND ANCILLARY ACCOMMODATION WORKS... login required. |
Details... |
2.6km |
10/02/2022 |
CONDITIONAL |
MONEYGALL , CO. OFFALY , E53 CC03 |
THE DEMOLITION OF EXISTING INDUSTRIAL BUILDING WITH REPLACEMENT TWO STOREY BUILDING TO BE USED FOR MICRO ENTERPRISE AND START UP BUSINESS, SPLIT INTO 4 SELF-CONTAINED UNITS, ASSOCIATED OFFICES AND TOILETS, COMMUNAL PARKING, NEW ENTRANCE, CONNECTION TO PUBLIC FOUL SEWER AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.6km |
31/01/2022 |
CONDITIONAL |
CLOUGHJORDAN ROAD , MONEYGALL BIRR , CO. OFFALY |
CONSTRUCTION OF A NEW DWELLING, GARAGE, SITE ENTRANCE, DRIVEWAY, SEWERAGE TREATMENT SYSTEM AND POLISHING FILTER AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.6km |
18/01/2022 |
N/A |
MONEYGALL , CO. OFFALY , E53 CC03 |
DEMOLITION OF EXISTING INDUSTRIAL BUILDING WITH REPLACEMENT TWO STOREY BUILDING TO BE USED FOR MICRO ENTERPRISE AND START UP BUSINESS, SPLIT INTO 4 SELF-CONTAINED UNITS, ASSOCIATED OFFICES AND TOILETS, COMMUNAL PARKING, NEW ENTRANCE, CONNECTION TO PUBLIC FOUL SEWER AND ALL ASSOCIATED SITE WORKS ... login required. |
Details... |
2.5km |
12/07/2021 |
CONDITIONAL |
CLOUGHJORDAN ROAD , MONEYGALL , CO. OFFALY |
CONSTRUCTION OF A NEW INDUSTRIAL UNIT, ENTRANCE, SEWAGE TREATMENT SYSTEM, ACESS SERVICE ROAD, CAR PARKING AND ALL ANCILLARY WORKS... login required. |
Details... |
2.5km |
02/06/2021 |
N/A |
CLOUGHJORDAN ROAD , MONEYGALL , CO. OFFALY |
CONSTRUCTION OF A NEW INDUSTRIAL UNIT, ENTRANCE, SEWAGE TREATMENT SYSTEM, ACCESS SERVICE ROAD SERVICE AND ALL ANCILLARY WORKS... login required. |
Details... |
2km |
27/04/2021 |
CONDITIONAL |
CLYNOE , MONEYGALL , CO. OFFALY |
A NEW DWELLING HOUSE, DETACHED GARAGE, NEW SITE ENTRANCE, TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.3km |
20/04/2021 |
CONDITIONAL |
BROWNSTOWN , CLOUGHJORDAN , CO. OFFALY |
ERECTION OF A DWELLING, GARAGE, ENTRANCE AND WASTEWATER TREATMENT SYSTEM, INCLUDING ALL ASSOCIATED SITEWORKS... login required. |
Details... |
1.2km |
01/04/2021 |
CONDITIONAL |
SILVERHILL , CLOUGHJORDAN , CO. OFFALY |
THE CONSTRUCTION OF A MILKING PARLOUR/DAIRY SHED AND ANCILLARY YARDS WITH SOILWATER COLLECTION TANK, MEAL BIN AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |