Skip to main content
All plans now 50% off - Limited offer for Business and Individual Subscriber accounts. Discount expires on Tuesday, 26 November 2024.

  Shanbally , Norwood , Nenagh

Dec 06 2023

Application Received
  • Submitted to Tipperary County Council, 06 / 12 / 2023
  • Application Type: PERMISSION
  • Current Status: INCOMPLETED APPLICATION
  • Decision Text: N/A
  • Decision Summary: No Decision
-- View Live Map (full screen map - includes planning application boundaries, zonings & other planning-related mapped content)

-- Signup Now to link to Commencement Notice details
Development:
dwelling house, garage, waste water treatment system, ... Signup to read full development description
An Bord Pleanála Information:
Creative Commons LicensePlanning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

  • Distance: Received: Decision: Development Address: Development Description:
    2.9km 15/11/2024 N/A Pallas West , Toomevara , Co. Tipperary construction of a slatted cattle house with underground slurry storage, ancillary concrete years and all associated site works... login required. Details...
    2.6km 29/09/2024 N/A Castlequarter , Toomevara Nenagh , Co. Tipperary a) existing single storey extension (to side Southwest elevation) as constructed. b) Planning Permission for alterations to existing single storey detached dwelling, including removal of ... login required. Details...
    2.4km 24/06/2024 CONDITIONAL Garrynafana , Ballymackey Nenagh , Co. Tipperary a new single storey dwelling; proposed new treatment system & percolation area; proposed new entrance access onto public road; all associated site works and ancillary services ... login required. Details...
    2.5km 20/06/2024 CONDITIONAL Garrynafana , Toomevara , Co. Tipperary a) the alterations to existing two storey detached dwelling; b) new single storey extensions to southeast and northwest elevation of existing dwelling; c) new treatment system & ... login required. Details...
    2.8km 07/02/2024 CONDITIONAL The Gate Lodge Riverglebe House , Coolkereen Toomevara , Co. Tipperary extension of the existing gate lodge for residential use and all associated ancillary development works (Protected Structure)... login required. Details...
    20m 14/12/2023 CONDITIONAL Shanbally , Norwood , Nenagh Co. Tipperary the construction of a dwelling house, garage and carport, waste water treatment system, entrance, driveway along with all ancillary site works... login required. Details...
    1.7km 22/09/2023 CONDITIONAL Newtown , Norwood , Nenagh Co. Tipperary dwelling house, onsite waste water treatment system and entrance together with associated site works... login required. Details...
    2.4km 14/09/2023 CONDITIONAL Grennanstown , Toomevara , Co. Tipperary the garage as constructed... login required. Details...
    2.4km 18/06/2023 CONDITIONAL Kilconane , Kilkeary , Nenagh renovations and an extension as built and Planning Permission for a new onsite waste water treatment system... login required. Details...
    2.4km 10/06/2023 N/A Kilconane , Toomevara , Nenagh Co. Tipperary renovations and extension as built and planning permission for new onsite waste water treatment system... login required. Details...
    2.9km 09/06/2023 CONDITIONAL Knockanglass , Ballymackey , Nenagh Co. Tipperary storage sheds, front boundary / entrance & revised site boundaries as constructed... login required. Details...
    2.8km 26/04/2023 CONDITIONAL Kilkeary National School , Kilkeary , Nenagh a) proposed new single storey extension to the existing school building (b) associated alterations to existing school to accommodate proposed new extension & internal layout changes; c) connection to existing on site services; d) all associated site works... login required. Details...
    2.4km 13/02/2023 CONDITIONAL Grennanstown , Toomevara , Co. Tipperary (1) the construction of a dwelling house, garage, waste water treatment system, & (2) the closure of existing domestic entrance servicing adjoining dwelling and the construction of a new combined entrance and driveways to service both properties along with all ancillary site works... login required. Details...
    1.6km 16/01/2023 CONDITIONAL Garrynafana , Toomevara Nenagh , Co Tipperary revisions to the proposed renovation & extension granted under planning permission 2260258... login required. Details...
    3km 13/11/2022 CONDITIONAL Ballintotty , Nenagh , Co. Tipperary an extension to dwelling and outbuildings as constructed comprising a garage, a garden shed and a fuel store including all associated site works... login required. Details...
    3km 10/11/2022 N/A Ballintotty , Nenagh , Co Tipperary an extension to the dwelling and outbuildings as constructed, comprising a garage, a garden shed and a fuel store, including all associated site works... login required. Details...
    2.8km 11/08/2022 CONDITIONAL Ballincurry , Norwood , Nenagh Co. Tipperary as built variations to previously approved planning permission reference 51/4686 consisting of: revised site boundaries, position and orientation of dwelling house and garage, extensions to the side and rear of the dwelli... login required. Details...
    2km 01/07/2022 CONDITIONAL Garrynafana , Toomevara , Co Tipperary a cubicle shed extension and all associated site works... login required. Details...
    2km 30/06/2022 CONDITIONAL Grenanstown , Toomevara , Nenagh Co Tipperary replacement of existing dwelling house with a new dwelling house, garage, waste water treatment system, upgrade existing entrance and driveway along with all ancillary site works and for change of use of existing dwelling house to be replaced from residential to farm store... login required. Details...
  • Geology & Groundwater
    Creative Commons LicenseContains Irish Public Sector Data (Geological Survey) licensed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence.

    Aquifer:
    • Category: Ll
    • Description: Locally Important Aquifer - Bedrock which is Moderately Productive only in Local Zones

    Vulnerability:
    • Unit Name: Ballysteen Formation
    • Description: Dark muddy limestone, shale
    • Labels: CDBALL / BA

    Bedrock:
    • Moderate ( M)

    Planning & Development

    Zoning:
    Creative Commons LicenseZoning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.
    • No Results...

    National Parks & Wildlife (NPWS)
    Creative Commons LicenseNPWS Data is published by National Parks and Wildlife Service, Department of Arts, Heritage and the Gaeltacht and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

    Special Area of Conservation:
    • No Results...

    Special Protection Areas:
    • No Results...

    Natural Heritage Areas:
    • No Results...

    Proposed Natural Heritage Areas:
    • No Results...

    Heritage & Conservation
    Creative Commons LicenseMonument & NIAH Building Data is published by National Monuments Service, Department of Arts, Heritage, Regional, Rural and Gaeltacht Affairs and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

    National Monuments:

    National Monuments within 100m of the mapped planning point

    • No Results...

    National Monument Zones of Notification:

    Is this Planning Point is within a National Monument Zones of Notification? (Section 12 National Monuments Acts 1930 to 2004)

    • No Results...
    National Inventory of Architectural Heritage:

    NIAH Locations within 100m of the mapped planning point

    Name NIAH Ref # Rating / Period Original Use Current Use Protected Structure
    No Results...

    Roads & Infrastructure

    National Roads & Motorways within 500m of mapped planning point


    National Roads (N) and Motorways (M):
    • No Results...

Return to top...