2.7km |
23/09/2024 |
N/A |
Drominagh Lodge , Ballinderry Nenagh , Co. Tipperary |
works to the Protected Structure, Drominagh Lodge, which consists of the removal of a modern 2-storey annex, modern lean-to conservatory and modern porch and the construction of a new flat roof c... login required. |
Details... |
1.1km |
19/04/2024 |
REFUSED |
Terryglass , Nenagh , County Tipperary |
development of two residential sites, with individual waste water treatment systems and percolation areas, shared vehicular entrance and all associated site boundary and site development works... login required. |
Details... |
630m |
03/01/2024 |
CONDITIONAL |
The Square , Terryglass , Nenagh |
two new semi-detached dwellings with new entrance to one of the dwellings and all associated site works at The Square, Terryglass, Nenagh, Co Tipperary E45 E627. The developoment is on the site of and adjacent to a protected structure TRPS 529... login required. |
Details... |
640m |
21/12/2023 |
N/A |
The Square , Terryglass , Nenagh |
two new semi-detached dwellings with new entrance to one of the dwellings and all associated site works at The Square, Terryglass, Nenagh, Co Tipperary E45 E627. The developoment is on the site of and adjacent to a protected structure TRPS 529.... login required. |
Details... |
2.9km |
13/09/2023 |
CONDITIONAL |
Shanakill Lower Ballinderry , Nenagh , Co. Tipperary |
the as-built extensions to existing dwelling house, existing wastewater treatment system and all ancillary site works thereto... login required. |
Details... |
1.1km |
29/06/2023 |
N/A |
Terryglass , Nenagh , Co. Tipperary |
the development of two serviced residential sites, vehicular entrance and all associated site boundary and site development works... login required. |
Details... |
1km |
27/06/2023 |
N/A |
Terryglass , Nenagh , Co. Tipperary |
two serviced residential sites, vehicular entrance and all associated site boundary and site development works... login required. |
Details... |
90m |
16/03/2023 |
CONDITIONAL |
Crossanagh , Terryglass , Nenagh |
the erection of a dwelling, vehicular entrance, connection to existing services together with all associated site development works ... login required. |
Details... |
560m |
17/02/2023 |
REFUSED |
The Orchard , Terryglass Nenagh , Co. Tipperary |
the construction of 2 No. self-contained modular chalets, new entrance and access driveway, connection to necessary services together with all associated site and incidental works. The proposed development is located within the curtilage of protected structures.... login required. |
Details... |
560m |
15/12/2022 |
N/A |
The Orchard , Terryglass Nenagh , Tipperary |
the construction of 2 No. self-contained modular chalets, new entrance and access driveway, connection to necessary services together with all associated site and incidental works... login required. |
Details... |
830m |
29/09/2022 |
CONDITIONAL |
Terryglass , Nenagh , Co Tipperary |
alterations to existing dwelling to include changes to elevations, raising of roof & eaves height to dwelling to include new pitched roof and associated flat roof overhang, replacement and raising of... login required. |
Details... |
250m |
23/09/2022 |
REFUSED |
Crossanagh , Terryglass , Nenagh Co. Tipperary |
a dwelling, vehicular entrance, connection to existing services together with all associated site development works... login required. |
Details... |
940m |
17/08/2022 |
CONDITIONAL |
Slevoir , Terryglass , Nenagh |
agricultural structures comprising: 1. as-built extension of livestock shed (slatted house) and associated underground effluent storage (slatted) tanks; 2. as-built livestock cubicle shed and associated underground effluent storage (slatted) tank; 3. as-built concrete silage base and apron; 4. as-built undergroun... login required. |
Details... |
1.1km |
06/07/2022 |
CONDITIONAL |
Slevoir , Terryglass , Nenagh |
an extension to the western side of existing dwelling house and all ancillary site works thereto... login required. |
Details... |
730m |
20/06/2022 |
CONDITIONAL |
Terryglass , Nenagh , Co. Tipperary |
2 No. dwelling houses, shared entrance, connection to existing services and associated site works. The first dwelling submitted on behalf of Michael & ... login required. |
Details... |
1.2km |
31/05/2022 |
REFUSED |
Oldcourt , Terryglass , Co. Tipperary |
demolition of existing hostel, new dwelling, garage and sewerage treatment plant over the footprint of the existing hostel, 2nd new dwelling located at the existing gated entrance and all ancillary works within the curtilage of a recorded monument TN-006-025... login required. |
Details... |
2.5km |
24/05/2022 |
CONDITIONAL |
Roran , Borrisokane , Co. Tipperary |
a two-storey dwelling house, detached garage, wastewater treatment system, site entrance and all ancillary site works thereto.... login required. |
Details... |
1.5km |
28/01/2022 |
CONDITIONAL |
Slevoir House , Slevoir Terryglass , Nenagh Tipperary |
works carried out and proposed to be carried out to Slevoir House, a protected structure (NIAH Ref: 22301001 and RPS No.: S363).The retention works carried out to the building and site consist of: • Repairs to render, internal covings and finishes, • Installation of new kitchen facilities, • Upgrading the Mechanical and Electrical throughout the house, • Installati... login required. |
Details... |
1.6km |
26/01/2022 |
N/A |
Slevoir House , Slevoir Terryglass , Nenagh Tipperary |
works carried out and proposed to be carried out to Slevoir House, a
protected structure (NIAH Ref: 22301001 and RPS No.: S363).The retention works carried out to the building and site consist of: • Repairs to render, internal covings and finishes, • Installation of new kitchen facilities, • Upgrading the Mechanical and Electrical throughout the house, • In... login required. |
Details... |