1.9km |
17/11/2024 |
N/A |
Ballygraigue , Nenagh , Co. Tipperary |
a new two storey dwelling with a single storey living area to the south, single storey garage and associated carport, opening of a new vehicular entrance to the site, new wastewater treatment system and polishing filter, new private water well together with all associated site development works... login required. |
Details... |
1.3km |
15/11/2024 |
N/A |
Glebe Lane , Kenyon Street Nenagh , Co. Tipperary |
the demolition of the existing warehouse and the construction of 10 no. apartments (5 no. 2-Bed units and 5 no. 1-Bed units) in a four-storey block with balconies, bin storage, bike storage and all associated site development works on the site of the existing warehouse... login required. |
Details... |
2.8km |
15/11/2024 |
N/A |
Lissenhall , Nenagh , Co. Tipperary |
a new single storey dwelling house, domestic garage, entrance, waste water treatment and disposal system and associated site works... login required. |
Details... |
1km |
09/11/2024 |
N/A |
Fawnlough Ballygraigue Road , Nenagh , Co. Tipperary |
design changes to existing planning permission ref:2360853 for a) alterations to existing single storey detached dwelling, b) new 1.5 storey/single storey extensions to side South & rear West elevation of existing d... login required. |
Details... |
1.7km |
08/11/2024 |
N/A |
St Conlons Road , Nenagh , Co Tipperary |
the demolition of an existing single storey derelict dwellinghouse and the construction of 12 No 2 bedroom apartments in 3 separate Blocks. Block No 1 shall consist of 4 No 2 bedroom apartments in a two-storey block with car-parking, connection to services, bin storage and anc... login required. |
Details... |
1.9km |
08/11/2024 |
N/A |
8 Melrose , Nenagh , Co. Tipperary |
the extension to the front & side of an existing dwelling & all associated site works... login required. |
Details... |
1.8km |
07/11/2024 |
N/A |
Tullaheady , Nenagh , Co. Tipperary |
partially complete underground store and for planning permission to complete the construction of same together with all associated works within the existing commercial premises ... login required. |
Details... |
1.7km |
04/11/2024 |
N/A |
St Conlons Road , Nenagh , Co Tipperary |
the demolition of an existing single storey derelict dwellinghouse and the construction of 12 No 2 bedroom apartments in 3 separate Blocks. Block No 1 shall consist of 4 No 2 bedroom apartments in a two-storey block with car-parking, connection to services, bin storage and anc... login required. |
Details... |
1.4km |
30/10/2024 |
N/A |
Mackeys Place , Nenagh , Co Tipperary |
canopy type shelter over side doorway to property... login required. |
Details... |
1.7km |
25/10/2024 |
N/A |
14a & 15A McDonagh Street , Nenagh , Co. Tipperary |
a single storey extension to the rear of each existing house together with all associated site works... login required. |
Details... |
1.3km |
15/10/2024 |
N/A |
Glebe Lane , Kenyon Street Nenagh , Co. Tipperary |
the construction of 10 no. apartments (5 no. 2-Bed units and 5 no. 1-Bed units) in a four-storey block with balconies, bin storage, bike storage and all associated site development works on the site of the existing warehouse... login required. |
Details... |
1.4km |
10/10/2024 |
N/A |
Sarsfield Street , Nenagh , Co. Tipperary |
the construction of a block wall to the north of existing open yard to subdivide the yard from existing properties & provision of a pedestrian door way to the rear yard of property numbers 26A, 27C, 28, 29A & 33 Sarsfield Street; Retain the clearing of overgrown vegetation from existing large open yard and installation of 50mm layer of blinding over existing hardcore; Retain a single storey extension to the rear of existing house number 28; Retain a single storey extension to th... login required. |
Details... |
1.4km |
09/10/2024 |
N/A |
Mackeys Place , Nenagh , Co. Tipperary |
canopy type shelter over side doorway to property... login required. |
Details... |
2.1km |
04/10/2024 |
N/A |
Tullahedy , Nenagh , Co. Tipperary |
the erection of a 24m lattice telecommunications support structure on a 1.2 metre high raised foundation (providing an overall height of 25.2 metres) together with assoc... login required. |
Details... |
1.9km |
03/10/2024 |
N/A |
St Flannans Street , Nenagh , Co. Tipperary |
development consisting of alterations to existing surgery building, 2 x stand alone prefabricated file storage buildings, 1 x stand alone prefabricated bin storage building and 1x st... login required. |
Details... |
1.3km |
01/10/2024 |
CONDITIONAL |
Nenagh General Hospital , Tyone Road Nenagh , Co. Tipperary |
a . Development of a single storey extension, to the front (west) of the existing hospital, accommodating 6 no. ophthalmology clinic rooms, 4 no. ophthalmology treatment rooms and associated support accommodation, b. a new main entrance lobby, to the front (west) of the existing hospital, c. a new carpark, to the west of the hospital campus, providing 52 new car park spaces, d. a new car park, to the east of the hospital campus, providing 47 new car park spaces, e. alterations to set down area, f. ... login required. |
Details... |
2.7km |
01/10/2024 |
N/A |
Lissatunny , Nenagh , Co Tipperary |
a). Extension to existing dwelling b). conversion of part of outbuildings to residential use c). Septic tank and percolation area along with all associated ancillary site works... login required. |
Details... |
1.8km |
25/09/2024 |
N/A |
Tullaheady , Nenagh , Co. Tipperary |
partially complete underground store and for planning permission to complete the construction of same together with all associated works within the existing commercial premises ... login required. |
Details... |
2.6km |
18/09/2024 |
CONDITIONAL |
Lisboney Industrial Estate , Lisboney , Nenagh Co Tipperary |
a commercial garage on existing serviced site, new entrance and front and rear boundary fence... login required. |
Details... |
1.2km |
16/09/2024 |
CONDITIONAL |
Arrabawn Co-operative Society Limited , Stafford Street Nenagh , Co. Tipperary |
a change of use of part of an existing single storey store building at its existing dairy processing facility; the development works will consist of the following; a) construction of a part two-storey structure within the existing store building to accommodate upgraded packaging facilities; b) building works ancillary to the above including the construction of a new internal stairwell within an existing production area which adjoins ... login required. |
Details... |