2.7km |
06/09/2024 |
CONDITIONAL |
Ballyhimikin , Ballycommon , Nenagh Co. Tipperary |
existing dwelling extensions, detached domestic garage/store and change of use from garage to residential, all as constructed... login required. |
Details... |
2.6km |
28/08/2024 |
CONDITIONAL |
The Thatch Ballycommon , Nenagh , Co. Tipperary |
a) the newly constructed boundary walls to car park area; b) the additional filling to site (south of carpark) and all associated site works... login required. |
Details... |
2.6km |
28/08/2024 |
CONDITIONAL |
Ballycommon , Nenagh , Co Tipperary |
the following works to existing dwelling house:-
a) Renovate existing dwelling house
b) Convert existing out buildings to residential accommodation.
c) Co... login required. |
Details... |
2.4km |
31/07/2024 |
CONDITIONAL |
Grove Land Ballyartella , Ballycommon Nenagh , Co. Tipperary |
the change of use of the existing garden shed to home office and RETENTION PERMISSION for the extension to the dwelling house and all ancillary works... login required. |
Details... |
2.9km |
22/07/2024 |
REFUSED |
Richmond House , Nenagh , Co Tipperary |
existing mobile home and connection to existing septic tank system and temporary permission to keep same on site. Duration of temporary permission to be 5 years... login required. |
Details... |
1.8km |
27/06/2024 |
CONDITIONAL |
Ballinwear , Nenagh , Co. Tipperary |
the upgrade of the wastewater system servicing existing cottage along with all ancillary siteworks... login required. |
Details... |
750m |
18/06/2024 |
N/A |
Knigh House , Knigh , Puckane Nenagh |
the demolition of redundant farm buildings and the construction of a dividing wall and a general purpose store building for use ancillary to the dwelling, including all associated works. The proposed development is adjacent to the recorded protected structure TRPS 225 - Knigh House... login required. |
Details... |
2.1km |
24/11/2023 |
CONDITIONAL |
Loughourna , Nenagh , Co. Tipperary |
first floor living accommodation, ground floor utility to side of house and domestic garage to rear of house and PERMISSION for new extension to rear and side of existing dwelling house... login required. |
Details... |
2.4km |
02/06/2023 |
CONDITIONAL |
Knigh , Puckaun , Co. Tipperary |
to erect a 24m high lattice tower together with antennas, dishes and associated telecommunications equipment all enclosed in security fencing and a proposed turning area... login required. |
Details... |
2.4km |
28/03/2023 |
CONDITIONAL |
Ballyhogan , Ballycommon , Nenagh Co. Tipperary |
change of use of existing shed to dog grooming commercial unit which is within the curtilage of a protected structure, Ballyhogan House (TRPS47)... login required. |
Details... |
2.4km |
09/03/2023 |
N/A |
Ballyhogan , Ballycommon , Nenagh Co. Tipperary |
the change of use of existing shed to dog grooming commercial unit. ... login required. |
Details... |
2.5km |
25/01/2023 |
CONDITIONAL |
Ballycommon , Nenagh , Co Tipperary |
(1) an extension to existing store, (2) 2 no. existing storage containers
and all associated site works ... login required. |
Details... |
2.5km |
02/12/2022 |
N/A |
Ballycommon , Nenagh , Co Tipperary |
(1)Extension to existing store (2) 2 no. existing storage containers and all associated site works... login required. |
Details... |
2.6km |
14/10/2022 |
CONDITIONAL |
The Thatch Ballycommon , Nenagh , Co Tipperary |
the following development and alterations:-
-Newly constructed extension and outdoor patio area including associate site works... login required. |
Details... |
2.4km |
16/09/2022 |
N/A |
Ballyhogan House , Ballyhogan , Ballycommon Co. Tipperary |
the change of use of existing shed/kiln room to a dog grooming salon... login required. |
Details... |
2.6km |
05/09/2022 |
CONDITIONAL |
Richmond , Nenagh , Co. Tipperary |
the construction of a two-storey dwelling house, detached garage, waste water treatment system, site entrance and all ancillary site works thereto... login required. |
Details... |
2.6km |
01/09/2022 |
N/A |
Richmond , Nenagh , Co. Tipperary |
a two-storey dwelling house, detached garage, waste water treatment system, site entrance and all ancillary site works thereto... login required. |
Details... |
2.6km |
26/08/2022 |
N/A |
Ballycommon , Nenagh , Co. Tipperary |
(A) the construction of 17 Dwelling Houses, consisting of 10 No. two-storey detached dwelling houses, 4 No. semi-detached dwelling houses, 1 No. detached bungalow and 2 No. semi-detached bungalows. (B) upgr... login required. |
Details... |
2.6km |
02/08/2022 |
N/A |
Richmond , Nenagh , Co Tipperary |
a dormer type dwelling house, entrance, on site waste water treatment system, percolation area and all associated site works... login required. |
Details... |