1.7km |
14/11/2024 |
N/A |
Garrykennedy , Portroe , Nenagh Co. Tipperary |
the extension and conversion of existing stables to a two bedroom short term holiday rental house, including constructing a waste water treatment system, percolation area and all other ancillary site works... login required. |
Details... |
1.7km |
11/11/2024 |
N/A |
Garrykennedy , Portroe , Nenagh Co. Tipperary |
to extend and convert existing Stables to a two bedroom short term holiday rental house and it will include constructing a waste water treatment system, percolation area and all other ancillary site works... login required. |
Details... |
1.5km |
12/10/2024 |
N/A |
Garrykennedy , Portroe , Nenagh Co. Tipperary |
new carpark area with entrance onto Ardarra Estate and permission for 6m high lighting standards with led lighting, footpath from the carpark to connect to Portroe GAA Club house grounds, connections to existing public services with all associated sitework and ancillary works... login required. |
Details... |
1.7km |
30/09/2024 |
N/A |
Garrykennedy , Portroe , Nenagh Co. Tipperary |
the extension and conversion of the existing stables to a two bedroom short term holiday rental house including construction of a waste water treatment system, percolation area and all other ancillary site works... login required. |
Details... |
1.5km |
17/09/2024 |
CONDITIONAL |
Garrykennedy , Portroe Nenagh , Co. Tipperary |
extension and alterations to existing dwelling and all ancillary works... login required. |
Details... |
2.9km |
14/08/2024 |
CONDITIONAL |
Curragh Portroe , Nenagh , Co. Tipperary |
a new entrance to serve two no. houses and to remove existing entrance... login required. |
Details... |
2.9km |
09/08/2024 |
N/A |
Curragh Portroe , Nenagh , Co. Tipperary |
a new entrance to serve two no. houses and remove the existing entrance... login required. |
Details... |
2.3km |
06/08/2024 |
N/A |
Garraunfadda , Dromineer Nenagh , Co. Tipperary |
the construction of a hobby room, storage shed, and all ancillary site works to the rear of the property and RETENTION PERMISSION for a fuel store as constructed... login required. |
Details... |
2.3km |
06/08/2024 |
CONDITIONAL |
Garraunfadda , Dromineer Nenagh , Co. Tipperary |
construction of hobby room, storage shed and all ancillary site works to the rear of the proposed and RETENTION PERMISSION for fuel store as constructed... login required. |
Details... |
2.4km |
31/07/2024 |
N/A |
Garraunfadda , Dromineer Nenagh , Co. Tipperary |
fuel store as constructed and full Planning Permission to construct a hobby room, storage shed and all ancillary site works to the rear of the property... login required. |
Details... |
1.1km |
04/07/2024 |
N/A |
Clooneygowny , Newtown , Nenagh |
dwelling house and associated services... login required. |
Details... |
1.1km |
28/06/2024 |
CONDITIONAL |
Youghal , Newtown Nenagh , Co. Tipperary |
a dwelling house, garage, wastewater system & entrance... login required. |
Details... |
1.3km |
21/06/2024 |
N/A |
Garrykennedy , Portroe , Co. Tipperary |
construction of (i) 4 no. detached houses in a cluster of 2 no. x single story dwellings , 2 no. part 2 story/ part dormer dwellings, (ii) 4 no. individual garage... login required. |
Details... |
1.3km |
12/06/2024 |
N/A |
Garrykennedy , Portroe , Co. Tipperary |
construction of (i) 4 no. detached houses in a cluster of 2 no. x single story dwellings, 2 no. part 2 story/part dormer dwellings, (ii) 4 no. individual garage ... login required. |
Details... |
910m |
08/05/2024 |
CONDITIONAL |
No. 12 Glencrue , Portroe , Nenagh |
extensions to front, side and rear of existing dwelling, external finishes to existing dwelling and to retain 3 No. existing domestic sheds/stores at rear of site, all as constructed... login required. |
Details... |
1.5km |
30/03/2024 |
CONDITIONAL |
Garrykennedy , Portroe , Nenagh |
the erection of lighting to the walking track consisting of 6m high lighting standards with led lighting to same with all associated site works... login required. |
Details... |
2km |
27/03/2024 |
N/A |
Garrykennedy , Portroe Nenagh , Co. Tipperary. |
a boathouse, access track, modification to existing gated entrance and roadside boundary fence and all associated site works. The planning application is accompanied by an NIS (Natura Impact Statement)... login required. |
Details... |
1.4km |
27/03/2024 |
CONDITIONAL |
Garrykennedy , Portroe , Nenagh |
construction of garage along with all ancillary site works... login required. |
Details... |
1km |
26/02/2024 |
CONDITIONAL |
No. 3 Glencrue , Portroe , Nenagh Co Tipperary |
an extension to the side of existing house along with all ancillary site works... login required. |
Details... |
2.3km |
18/01/2024 |
N/A |
Tomona , Dromineer , Nenagh Co Tipperary |
construction of a domestic storage shed... login required. |
Details... |