2.5km |
29/03/2024 |
N/A |
Rossmore , n/a , Co. Laois |
Amend the consented (but not yet constructed) substation development permitted as part of Laois County Council Planning Reference 20/281 comprising a Revised 38kV Substation and Compound Area including a singl... login required. |
Details... |
2.5km |
21/03/2024 |
N/A |
Rossmore , n/a , Co. Laois |
carry out amendments to the consented (but not yet constructed) substation development permitted as part of Laois County Council Planning Reference 20/281 comprising a Revised 38kV Substation and Compound Area includi... login required. |
Details... |
2.4km |
13/03/2024 |
N/A |
Rossmore , Laois , Co. Laois |
Retain works carried out to include the extraction and storage of stone from part of an existing quarry and permission sought for the continuation over the same area and a proposed new extended area... login required. |
Details... |
2.4km |
05/03/2024 |
N/A |
Rossmore , Co. Laois |
Retain works carried out to include the extraction and storage of stone from part of an existing quarry and permission sought for the continuation over the same area and a proposed new extended area... login required. |
Details... |
2.7km |
22/02/2024 |
N/A |
Clogrenan , , Co. Laois |
apply for Retention Permission for a dwelling house, shed, septic tank, percolation area and ancillary services ... login required. |
Details... |
2.6km |
09/02/2024 |
CONDITIONAL |
Clogrennane , Co. Laois |
construct single storey extension to the front of existing dormer style dwelling and all associated site works... login required. |
Details... |
1km |
19/10/2023 |
CONDITIONAL |
Craanlusky , Bilboa , Co. Carlow |
the construction of a new single storey dwelling, a domestic garage, bored well, Tertiary treatment system & infiltration / treatment area, up grading of existing entrance, and all associated works ... login required. |
Details... |
1km |
16/10/2023 |
N/A |
Craanlusky , Bilboa , Co. Carlow |
the construction of a new single storey dwelling, a domestic garage, bored well, Tertiary treatment system & infiltration / treatment area, up grading of existing entrance, and all associated works ... login required. |
Details... |
2.9km |
01/08/2023 |
CONDITIONAL |
Clogrennane , Co. Laois , Co. Laois |
construct a single storey dwelling, domestic garage, new entrance, bored well, secondary treatment system & soil polishing filter, and all associated site works at, Clogrennane, Co. Laois.... login required. |
Details... |
2.2km |
14/02/2023 |
CONDITIONAL |
Townlands of Clogrennan and Rossmore , Rossmore Bog , Co Laois |
develop lands which will consist of the removal of the existing 30m structure and its replacement with a 36m high lattice support structure with a 12m broadcast antenna array on the top of the structure, lightning finial and all associated site works... login required. |
Details... |
1.9km |
07/10/2022 |
CONDITIONAL |
Bilboa Wind Farm , Land at Boolyvannanan & Coolnakisha , Bilboa |
development will consist of the erection of five wind turbines with turbine blade diameter of 117m and overall height to tip of 136.5m. one permanent meteorlogical mast, access road and internal tracks, electricity sub-station, temporary construction compound, turbine laydown area, control buildi... login required. |
Details... |
2.5km |
26/09/2022 |
CONDITIONAL |
Clongrennane , Co. Carlow |
for a) proposed new single storey dwelling, b) new vehicle entrance, c) domestic garage, d) domestic well, e) treatment system & percolation area along with all associated site development and facilitating works... login required. |
Details... |
1.2km |
19/09/2022 |
CONDITIONAL |
Craanlusky , Bilboa , Co. Carlow |
of agricultural entrance and all associated site works... login required. |
Details... |
1.6km |
12/09/2022 |
CONDITIONAL |
Ardough , Bilboa , Carlow |
construct a single storey dwelling, domestic garage, bored well, tertiary treatment system and infiltration/treatment area, new site entrance, and all associated site works... login required. |
Details... |
1.8km |
09/09/2022 |
N/A |
Bilboa Wind Farm , Townland of Boolyvannanan & Coolnakisha , Bilboa |
the erection of five wind turbines with turbine blade diameter of 117m and overall height to tip of 136.5m. One permanent meteorological mast, access road and internal tracks, electricity substation, temporary construction compound, turbine laydown area, control building, 1 borrow p... login required. |
Details... |
1.2km |
26/08/2022 |
CONDITIONAL |
Ballinabrannagh , Bilboa , Co. Carlow |
to demolish hay shed and part of lean to, also demolish annex to side of dwelling house and renovate and extend dwelling house, decommission existing septic tank and install a proprietary wastewater treatment system and polishing filter... login required. |
Details... |
2.6km |
08/07/2022 |
CONDITIONAL |
Tomard Lower TD , Co. Carlow |
to construct a new dwelling house, domestic garage, install ETU with percolation area, and form new entrance with all associated site works... login required. |
Details... |
1.7km |
29/04/2022 |
CONDITIONAL |
Tomard Lower , Bilboa , Co. Carlow |
the construction of a cattle underpass, slatted effluent tank and all associated site works... login required. |
Details... |
1.7km |
25/04/2022 |
N/A |
Tomard Lower , Bilboa , Co. Carlow |
the construction of a cattle shed underpass, slatted effluent tank and all associated site works... login required. |
Details... |
2.7km |
04/03/2022 |
CONDITIONAL |
Gazebo House , Clogrennane , Co. Carlow R93 TF19 |
is sought for a two storey house, on site treatment system, bored well, new site entrance and all associated site works ... login required. |
Details... |