2.3km |
14/10/2024 |
N/A |
Dranagh , St.Mullins , Co.Carlow |
for the erection of a dwelling house, garage/store, installation of a treatment system and percolation area and all associated site works.... login required. |
Details... |
1.9km |
29/09/2024 |
N/A |
Coolhill , The Rower , Co Kilkenny |
for the construction of a dwelling house, domestic garage, site entrance and all associated site works... login required. |
Details... |
3km |
29/07/2024 |
N/A |
Glebe , St. Mullins , Co. Carlow |
the refurbishment and extension to existing dwelling, demolition of existing outbuilding, new onsite wastewater treatment system and all associated site development works... login required. |
Details... |
2.6km |
26/07/2024 |
CONDITIONAL |
Ballyknock , St. Mullins , Co. Carlow |
the extension of existing dwelling and all associated site works... login required. |
Details... |
3km |
25/07/2024 |
N/A |
Glebe , St. Mullins , Co. Carlow |
the refurbishment and extension to existing dwelling, demolition of existing outbuilding, new onsite wastewater treatment system and all associated site development works... login required. |
Details... |
3km |
08/07/2024 |
N/A |
Glebe , St. Mullins , Co. Carlow |
the refurbishment and extension to existing dwelling, demolition of existing outbuilding, new onsite wastewater treatment system and all associated site development works... login required. |
Details... |
2.6km |
01/07/2024 |
N/A |
St. Mullins , Co. Carlow |
the erection of a dwelling house, garage, installation of a treatment plant and percolation area and all associated site works... login required. |
Details... |
2.4km |
04/06/2024 |
CONDITIONAL |
Ballinavarry English , Graiguenamanagh , Co. Kilkenny |
retention of extension to side of the existing dwelling and all associated site works... login required. |
Details... |
2.6km |
15/05/2024 |
N/A |
The Old Mill , St Mullins & Glebe , St. Mullins Co. Carlow |
retention for the location of a treatment plant connected to existing sand filter on site (alterations to location granted under planninq Ref. No. 06/240) and all associated site works... login required. |
Details... |
1.9km |
29/03/2024 |
CONDITIONAL |
Ballyknock , St. Mullins , Co. Carlow |
the erection of a storage shed and all associated site works... login required. |
Details... |
1.8km |
01/02/2024 |
CONDITIONAL |
Ballynalour , St. Mullins , Co. Carlow |
the construction of an above ground slurry store and associated site works... login required. |
Details... |
2.9km |
14/12/2023 |
CONDITIONAL |
Dranagh , St. Mullins , Co. Carlow |
the erection of an extension to and renovation of a derelict cottage, erection of a domestic garage/store, close up the existing entrance and erect new entrance off the private lane bounding the eastern boundary of the site... login required. |
Details... |
1.5km |
13/12/2023 |
CONDITIONAL |
Coolhill , The Rower , Co. Kilkenny |
for the demolition of a haybarn and derelict dwelling house, construction of a dwelling house, site entrance and all associated site works ... login required. |
Details... |
2.9km |
11/12/2023 |
N/A |
Dranagh , St. Mullins , Co. Carlow |
the erection of an extension to and renovation of a derelict cottage, erection of a domestic garage/store, close up the existing entrance and erect new entrance off the private lane bounding the eastern boundary of the site... login required. |
Details... |
0m |
26/10/2023 |
CONDITIONAL |
Drummin , St. Mullins , Co. Carlow |
the erection of a dwelling house, entrance and sewerage treatment system together with all associated site works and also planning permission sought for the temporary retention of a mobile home on the site... login required. |
Details... |
2.6km |
09/10/2023 |
CONDITIONAL |
Tinnascolly , The Rower , Co. Kilkenny |
for the construction of a dwelling house, carport connecting to utility spaces and store room, site entrance and all associated site works ... login required. |
Details... |
2.6km |
04/09/2023 |
CONDITIONAL |
Carrenroe , The Rower |
for the construction of a one and a half storey house with new site entrance, detached garage, bored well, wastewater treatment plant with raised bed sand polishing filter, all associated siteworks in connection with the above... login required. |
Details... |
2.6km |
24/07/2023 |
REFUSED |
The Old Mill , St Mullins and Glebe , St Mullins Co. Carlow |
permission for 8 No. Serviced sites (part of existing development granted under planning Ref. 06/240) with connection to existing treatment system and all associated site works... login required. |
Details... |
2.4km |
06/07/2023 |
CONDITIONAL |
Blanchfields , St Mullins , Co .Carlow |
Permission for change of use of existing stables to new store / cold room connected to existing public house (Blanchfield Pub) and all associated site works... login required. |
Details... |