570m |
25/09/2024 |
N/A |
Earlsland , Callan , Co. Kilkenny |
for relocation of existing septic tank and percolation area from previously granted, including all associated site works... login required. |
Details... |
1.8km |
16/09/2024 |
CONDITIONAL |
BROADMORE , CALLAN , CO. KILKENNY |
PERMISSION FOR THE FOLLOWING WORKS: CONSTRUCTED FRONT EXTENSION TO DWELLING AND CONSTRUCTED DOMESTIC GARAGE AND ALL OTHER ASSOCIATED SITE WORKS... login required. |
Details... |
2.6km |
02/08/2024 |
N/A |
Monarche , Callan , Co. Kilkenny |
for the renovation and extension at Monarche Commons, Callan, Co. Kilkenny, a Protected Structure (Ref: C827). To include the demolition of an existing flat roof extension to the rear of the thatched cottage and the construction of a new rear extension containing new sanitary facil... login required. |
Details... |
3km |
21/06/2024 |
N/A |
R691 and L2107 in the townlands of , Harleypark Ballingarry Upper and Gortnasmuttaun , Co. Tipperary |
temporary road widening works and construction of temporary sections of stoned roads and all ancillary development on the R691 and L-2107-2 at bends and junctions to enable the delivery of turbine components. These works consist of; • Construction of a temporary section of stoned road located adjacent to the R691 in the townland of Harleypark to accommodate abnormal load deliveries. The works will require a temporary bridge crossing and all associated drainage and sediment protection, temporary works and storage area, temporary stockpiles and demolition and reinstatement of a section of stone wall to accommodate the works. • Temporary widening of section of the R691 in the townland of Harleypark to accommodate abnormal load deliveries comprising construction of a stoned area on a bend. • Construction of a temporary section of stoned road adjacent to the R691 in th... login required. |
Details... |
1.5km |
21/06/2024 |
N/A |
The townlands of , Booly Ballyclovan and Scotsborough , County Kilkenny |
for the proposed development to consist of temporary road widening works and construction of temporary sections of stoned roads and all ancillary works on the R691 and R695 at bends and junctions to enable the delivery of turbine components. These works consist of;
• Temporary widening of section of the R691 in the townland of Booly comprising construction of a stoned area to accommodate abnormal load deliveries.
• Construction of a temporary section of stoned road off the R691 and R695 in the townland of Ballyclovan to accommodate abnormal load deliveries.
• Construction of a temporary section of stoned road ... login required. |
Details... |
570m |
05/04/2024 |
CONDITIONAL |
Earlsland , Callan , Co Kilkenny |
PERMISSION to retain single storey detached garage to residential site, including all associated site works... login required. |
Details... |
650m |
23/01/2024 |
CONDITIONAL |
Cappahayden , Callan , County Kilkenny |
for the construction of a part two-storey, part single-storey dwelling house, vehicular entrance and driveway, septic tank and percolation area, and all associated site works... login required. |
Details... |
650m |
22/12/2023 |
N/A |
Cappahayden , Callan , County Kilkenny |
for construction of a part two-storey, part single-storey dwelling house, vehicular entrance and driveway, septic tank and percolation area, and all associated site works... login required. |
Details... |
1.7km |
11/12/2023 |
CONDITIONAL |
Cappahayden , Callan , Co Kilkenny |
to erect a calf house with small store area, drafting/return concrete yards including a soiled water storage tank & ancillary concrete works on my lands... login required. |
Details... |
2.9km |
14/11/2023 |
CONDITIONAL |
Friary Walk , Clashacollare Callan , Co Kilkenny |
for the construction of 19 No. 2-storey semi-detached and terraced housing units, together with proposed boundary treatments, landscaping, and all associated site development... login required. |
Details... |
2.8km |
12/10/2023 |
CONDITIONAL |
Whitehouse , Callan , Co.Kilkenny |
for a four bay agricultural shed with concrete slatted tank and all associated works... login required. |
Details... |
2.6km |
16/08/2023 |
CONDITIONAL |
Killaloe , Callan , Co.Kilkenny |
for a single storey, three-bedroom house, a detached garage a new site entrance a wastewater treatment plant and soil polishing filter, a new bored well and all associated site works... login required. |
Details... |
2.6km |
14/08/2023 |
N/A |
Killaloe , Callan , Co Kilkenny |
for a single storey, three-bedroom house, a new site entrance a wastewater treatment plant and soil polishing filter, a new bored well and all associated site works... login required. |
Details... |
2.8km |
20/06/2023 |
CONDITIONAL |
Killaloe , Callan , Co. Kilkenny |
to erect an extension to an existing dairy cubicle house to include a robotic milking facility, slurry/dairy washings storage tanks, cubicle area, office, dairy, plant room and ancillary concrete works... login required. |
Details... |
2.9km |
09/05/2023 |
REFUSED |
Friary Walk , Clashacollare , Callan |
for the construction of 43 No. 2-storey semi-detached and terraced housing units together with proposed boundary treatments, landscaping and all associated site development work... login required. |
Details... |
0m |
04/05/2023 |
N/A |
Westcourt North , Callan , Co. Kilkenny |
to construct an agricultural storage shed, soakpits and all other associated site works... login required. |
Details... |
2.9km |
20/04/2023 |
N/A |
Friary Walk Clashacollare , Callan , Co. Kilkenny |
for the construction of 43 No. 2-storey semi-detached and terraced housing units together with proposed boundary treatments, landscaping and all associated site development wor... login required. |
Details... |
2.8km |
07/03/2023 |
CONDITIONAL |
Killaloe , Callan , Co Kilkenny |
to erect a robotic milking facility incl. slurry storage/dairy washings tanks, cubicle area, office, dairy, plant room and ancillary concrete works on my lands... login required. |
Details... |
1.2km |
23/08/2022 |
CONDITIONAL |
Ballyclovan , Callan , Co Kilkenny |
for 1) garage to rear of building, 2) boiler house to rear of the building and 3) revised boundaries to site and all associated site works... login required. |
Details... |