1.4km |
10/11/2024 |
N/A |
Bridge Hill , Faithlegg , Waterford |
for Renovation and extension to an existing bungalow, including; wall and roof demolition, ground floor renovation and extension, first-floor extension, waste water treatment system, and landscaping, with all site development works and associated connections... login required. |
Details... |
1.4km |
07/11/2024 |
N/A |
Bridge Hill , Faithlegg , Waterford |
for development Renovation and extension to an existing bungalow, including wall and roof demolition, ground floor renovation and extension, first-floor extension, waste water treatment system, and landscaping, with all site development works and associated connections... login required. |
Details... |
2km |
07/11/2024 |
N/A |
Parkswood Upper , Passage East , Co.Waterford |
to alter, extend, refurbish and upgrade the unoccupied, single storey, Lynch family home. The proposal is to retain the existing single storey house and retain the existing entrance from the adjoining public road and to build two single storey extensions (i) kitchen and (ii) bedroom to the rear of the exist... login required. |
Details... |
1.8km |
03/07/2024 |
REFUSED |
Coolbunnia , Cheekpoint , Co. Waterford |
to construct a Glamping Area consisting of 5 no. Serviced Glamping Pods, proprietary wastewater treatment plant, new entrance from existing lane, borewell water supply and all other associated site development works to facilitate development... login required. |
Details... |
1.8km |
18/06/2024 |
N/A |
Coolbunnia , Cheekpoint , Co. Waterford |
to construct a Glamping Area consisting of 5 no. Serviced Glamping Pods, proprietary wastewater treatment plant, new entrance from existing lane, borewell water supply and all other associated site development works to facilitate development... login required. |
Details... |
1.8km |
13/06/2024 |
N/A |
Coolbunnia , Cheekpoint , Co. Waterford |
to construct a Glamping Area consisting of 6 no. Serviced Glamping Pods, proprietary wastewater treatment plant, new entrance from existing lane, borewell water supply and all other associated site development works to facilitate development... login required. |
Details... |
2.9km |
31/05/2024 |
CONDITIONAL |
Gorteens , Slieverue , Co. Kilkenny |
for the development of 2no. grain silos and associated site works... login required. |
Details... |
850m |
22/05/2024 |
CONDITIONAL |
Green Road , Faithlegg , Co. Waterford |
to construct a single storey extension to the rear of existing dwelling, works will also include elevation changes to the existing house including: 1. removal of a window from the existing western gable, 2. remove a window from the northern elevation and replace with a new access d... login required. |
Details... |
2.8km |
29/03/2024 |
CONDITIONAL |
Ballygunnertemple , Waterford , Co. Waterford |
Permission for indefinite retention of a 105m2 portal frame garage bay, retention of a 56m2 workshop storage loft and rear stairs access, plus retention of office and workshop signage... login required. |
Details... |
1.6km |
29/03/2024 |
CONDITIONAL |
Unit 2 Belview Port , in the townland of Gorteens , Co Kilkenny |
for development, at Unit 2, Belview Port, Gorteens, Co. Kilkenny. The development will consist of the amendment of condition no. 3 Pl. Ref. 11/397 to include for the acceptance, unloading and storage of non-hazardous waste includi... login required. |
Details... |
2.8km |
26/03/2024 |
N/A |
Ballygunnertemple , Waterford , Co. Waterford |
Permission for indefinite retention of a 105m2 portal frame garage bay, retention of a 56m2 workshop storage loft and rear stairs access, plus retention of office and workshop signage at... login required. |
Details... |
2.8km |
01/03/2024 |
N/A |
Gorteens , Slieverue , Co. Kilkenny |
for development on lands with a site area of approximately 11.57ha located at Gorteens, Co. Kilkenny. The development will consist of the construction of an integrated plasterboard manufacturing facility, incorporating a production plant with access from the industrial area road infrastructure at Gorteens, Co. Kilkenny.
The production facility will have a floor area of 22,400 sq.m, with a height over finished ground level ranging from 19metres to 29metres. Roof mounted solar panels are proposed. The proposed development includes all site development works, landscaping, boundary treatments including earthworks, road works, retaining... login required. |
Details... |
2.9km |
09/02/2024 |
CONDITIONAL |
Gorteens , Slieverue , Co. Kilkenny |
for alterations to previously granted permission (PD Ref: 23/60274) to close in the permitted open-sided yard area, elevational alterations and the reduction in height to 9m to eaves, together with all associated site development works... login required. |
Details... |
2.6km |
21/12/2023 |
REFUSED |
Passage Cross , Ballygunnertemple , Waterford |
for the bulk excavation dig and alteration of levels, to reduce ground locally to that compatible with adjacent lands, together with all associated site development works all to the rear of Suir Garages... login required. |
Details... |
1.4km |
21/12/2023 |
REFUSED |
Faithlegg , Co. Waterford |
for the infill of existing agricultural lands with inert soil and stones (EU Waste Class 17 05 04) together with all associated site development works... login required. |
Details... |
2.5km |
09/11/2023 |
CONDITIONAL |
Gorteens , Slieverue , Waterford |
for the construction of a new roof on each of the previously granted concrete storage structures (Planning Ref 22/569). SmartPly Europe currently hold an Industrial Emission Licence issued by the EPA... login required. |
Details... |
2.5km |
27/10/2023 |
N/A |
Gorteens , Slieverue , Waterford |
for the construction of a new roof on the previously granted concrete storage structures (Planning Ref 22/569).... login required. |
Details... |
2.3km |
11/08/2023 |
REFUSED |
GORTEENS , SLIEVERUE , Co. KILKENNY |
FOR A LAYDOWN / TRANSPORTATION YARD TO FACILITATE THE STORAGE
OF SHIPPING CONTAINERS, A CONTAINER REPAIR AREA, PARKING
FOR ARTICULATED TRUCK TRAILERS, A SAFE ZONE IN WHICH
HAU... login required. |
Details... |
3km |
14/07/2023 |
CONDITIONAL |
Seed Technology Ltd , Gorteens Slieverue , Co. Kilkenny |
for (1) Retention Permission for storage of felled trees, to maximum height of 6m to part of the site; 2) Planning Permission for a 3-year duration for additional storage area to the site for felled trees, to maximum height of 6m, together with all associated site development works, all ... login required. |
Details... |
2.9km |
27/06/2023 |
CONDITIONAL |
Seed Technology Ltd , Gorteens Slieverue , Co. Kilkenny |
Seed Technology Ltd. is applying for Planning Permission for (1) New single storey warehouse, incorporating a 2 Storey office block; (2) Open sided covered goods in-take area from proposed warehouse to existing building; (3) New single storey storage building between proposed building and existing building; (4) Relocation of existing weigh-bridge and asso... login required. |
Details... |