2.8km |
30/07/2024 |
CONDITIONAL |
Rathpatrick , Slieverue , Co. Kilkenny |
Planning Permission to retain indefinitely single storey extension to existing dwelling & domestic garage ... login required. |
Details... |
680m |
11/07/2024 |
CONDITIONAL |
Rathculliheen , Co Kilkenny |
for the indefinite Retention for material alteration to 7 no. ground floor 1 bed apartments to 7 no. 2 bed apartments previously granted planning permission under planning ref No: 18/171. All... login required. |
Details... |
2.2km |
02/07/2024 |
N/A |
Arbourmount , Rockshire Road , Ferrybank Co Kilkenny |
for the proposed erection of 14 number semi-detached two-storey and basement [three-stories overall] dwellinghouses together with all associated site development works [including r... login required. |
Details... |
2.6km |
31/05/2024 |
CONDITIONAL |
Gorteens , Slieverue , Co. Kilkenny |
for the development of 2no. grain silos and associated site works... login required. |
Details... |
2.3km |
29/03/2024 |
CONDITIONAL |
Unit 2 Belview Port , in the townland of Gorteens , Co Kilkenny |
for development, at Unit 2, Belview Port, Gorteens, Co. Kilkenny. The development will consist of the amendment of condition no. 3 Pl. Ref. 11/397 to include for the acceptance, unloading and storage of non-hazardous waste includi... login required. |
Details... |
2.3km |
01/03/2024 |
N/A |
Gorteens , Slieverue , Co. Kilkenny |
for development on lands with a site area of approximately 11.57ha located at Gorteens, Co. Kilkenny. The development will consist of the construction of an integrated plasterboard manufacturing facility, incorporating a production plant with access from the industrial area road infrastructure at Gorteens, Co. Kilkenny.
The production facility will have a floor area of 22,400 sq.m, with a height over finished ground level ranging from 19metres to 29metres. Roof mounted solar panels are proposed. The proposed development includes all site development works, landscaping, boundary treatments including earthworks, road works, retaining... login required. |
Details... |
2.4km |
09/02/2024 |
CONDITIONAL |
Gorteens , Slieverue , Co. Kilkenny |
for alterations to previously granted permission (PD Ref: 23/60274) to close in the permitted open-sided yard area, elevational alterations and the reduction in height to 9m to eaves, together with all associated site development works... login required. |
Details... |
1.6km |
08/12/2023 |
CONDITIONAL |
Kilmurry , Slieverue , Co. Kilkenny |
to construct a new dwelling and domestic garage on existing brownfield site and all associated site works... login required. |
Details... |
2.7km |
09/11/2023 |
CONDITIONAL |
Gorteens , Slieverue , Waterford |
for the construction of a new roof on each of the previously granted concrete storage structures (Planning Ref 22/569). SmartPly Europe currently hold an Industrial Emission Licence issued by the EPA... login required. |
Details... |
2.7km |
27/10/2023 |
N/A |
Gorteens , Slieverue , Waterford |
for the construction of a new roof on the previously granted concrete storage structures (Planning Ref 22/569).... login required. |
Details... |
730m |
11/10/2023 |
UNCONDITIONAL |
Rathview Park , Rathculiheen , Ferrybank |
of planning permission 18/447... login required. |
Details... |
2.4km |
25/09/2023 |
CONDITIONAL |
GORTEENS , SLIEVERUE , CO KILKENNY |
for a 7-year planning permission for 3 No Bulk Stores, a marshalling yard and site works including earthworks, road works, entrance, gates and fencing, concrete paving, water services, drainage works, site lighting and landscaping. The stores will be used to store Port... login required. |
Details... |
2.2km |
11/08/2023 |
REFUSED |
GORTEENS , SLIEVERUE , Co. KILKENNY |
FOR A LAYDOWN / TRANSPORTATION YARD TO FACILITATE THE STORAGE
OF SHIPPING CONTAINERS, A CONTAINER REPAIR AREA, PARKING
FOR ARTICULATED TRUCK TRAILERS, A SAFE ZONE IN WHICH
HAU... login required. |
Details... |
680m |
28/07/2023 |
UNCONDITIONAL |
Rathculliheen , Co Kilkenny |
of Planning Permission Reference P18/171... login required. |
Details... |
2.4km |
14/07/2023 |
CONDITIONAL |
Seed Technology Ltd , Gorteens Slieverue , Co. Kilkenny |
for (1) Retention Permission for storage of felled trees, to maximum height of 6m to part of the site; 2) Planning Permission for a 3-year duration for additional storage area to the site for felled trees, to maximum height of 6m, together with all associated site development works, all ... login required. |
Details... |
2.3km |
13/07/2023 |
CONDITIONAL |
Ballynamona , Slieverue , Co Kilkenny |
for a first-floor attic conversion to Living space to existing dwelling house & detached Garage... login required. |
Details... |
2.4km |
27/06/2023 |
CONDITIONAL |
Seed Technology Ltd , Gorteens Slieverue , Co. Kilkenny |
Seed Technology Ltd. is applying for Planning Permission for (1) New single storey warehouse, incorporating a 2 Storey office block; (2) Open sided covered goods in-take area from proposed warehouse to existing building; (3) New single storey storage building between proposed building and existing building; (4) Relocation of existing weigh-bridge and asso... login required. |
Details... |
2.3km |
09/02/2023 |
CONDITIONAL |
Gorteens , Slieverue , Co. Kilkenny |
for the proposed erection of a Security Cabin on site comprised of Security Office, Canteen and WC together with Treatment Plant and associated Polishing Filter and all associated site works and ancillary services on site... login required. |
Details... |
2.5km |
26/01/2023 |
REFUSED |
Ballyrobin , Ferrybank , Co Kilkenny |
for development. The development will consist of a new 27 metres telecommunications support structure with headframe, carrying antennas, dishes, associated equipment, ground-based equipment... login required. |
Details... |