700m |
10/07/2024 |
CONDITIONAL |
Bausch + Lomb Ireland Unit 424-425 IDA Industrial Estate , Cork Road Waterford , Ireland |
for the proposed 1-storey extension (403m² Approx.) to the Northern side of the existing Bausch + Lomb Ireland facility. The extension is to include new open plan and cellular offices. This is also to include minor internal and external modifications to previously granted planning permission (reference number: 24/60085). These works are to include all associated plant & equipment, elevational alterations, site works, site fencing, signage and alterations to internal road network and d... login required. |
Details... |
700m |
02/07/2024 |
N/A |
Bausch + Lomb Ireland Unit 424-425 IDA Industrial Estate , Cork Road Waterford , Ireland |
for proposed 1-storey extension (403m² Approx.) to the Northern side of the existing Bausch + Lomb Ireland facility. The extension is to include new open plan and cellular offices. This is also to include minor internal and external modifications to previously granted planning permission (reference number: 24/60085).
These works are to include all associated plant & equipment, elevational alterations, site works, site fencing, signage and alterations to internal road network and drainage. This application relat... login required. |
Details... |
970m |
26/06/2024 |
N/A |
Cleayboy Business Park Unit 8D , Old Kilmeaden Road , Waterford |
permission for the indefinite retention of as constructed alterations made to premises as previously granted under Planning File Reference 04/89. namely for the as constructed sub-division and change of use of premises into 3 separate - Unit 1 measuring 497sqm (a motor repair garage as per previous grant) at ground floor, Unit 2 measuring 1... login required. |
Details... |
2.4km |
24/06/2024 |
N/A |
Butlerstown South , Butlerstown , Co. Waterford |
to construct a single storey dwelling, garage, wastewater treatment system, percolation area, splayed entrance and all ancillary site works... login required. |
Details... |
530m |
18/06/2024 |
CONDITIONAL |
Former Waterford Crystal Sports and Leisure Centre site , Cork Road , Waterford |
for development consisting of 292 residential units and associated uses comprising: 6no. two storey 4 bedroom detached and semi-detached houses; 160no. two storey 3 bedroom detached, semi-detached and terraced houses; 4no. three storey apartment blocks consisting of 60no. 2 bedroom duplex apartment units; a five storey apartment block comprising 66no. age-friendly apartments (32no. 1 bedroom and 34no. 2 bedroom units) and ancillary accommodation; a standalone single storey creche building (286sqm) and associated external play area. Vehicular access is provided from Ba... login required. |
Details... |
440m |
05/06/2024 |
CONDITIONAL |
39 Meadowbank , Ballynaneashagh , Waterford |
for Single storey lean-to structure to side of existing dwelling and all associated works... login required. |
Details... |
510m |
28/05/2024 |
CONDITIONAL |
78 Meadowbank , Ballynaneashagh , Waterford |
for single storey lean-to structure to side of existing dwelling and all associated site works... login required. |
Details... |
440m |
12/04/2024 |
CONDITIONAL |
38 Meadowbank , Ballynaneashagh , Waterford |
of single storey lean-to structure to side of existing dwelling and all associated works... login required. |
Details... |
1.1km |
15/03/2024 |
CONDITIONAL |
UPMC Whitfield Hospital , Cork Road Butlerstown North , Waterford |
for development consisting of a proposed exit onto the R680 Road along with associated site development works all adjoining to the existing hospital ... login required. |
Details... |
380m |
05/03/2024 |
CONDITIONAL |
Urlanmore , Cork Road , Waterford |
for a single storey extension to the side and rear of the dwelling and removal and blocking up of the original front entrance door... login required. |
Details... |
700m |
22/02/2024 |
CONDITIONAL |
Bausch + Lomb Ireland , Unit 424 – 425 IDA Industrial Estate , Cork Road Waterford |
the proposed 1-storey extension (348m² Approx.) to the Northern side, the Part 1-storey & Part 2-storey extension (3614m² Approx.) to the Northern & Eastern sides of the existing Bausch + Lomb Ireland facility. The extensions are to include new production facilities, storage areas, offices, link corridors and staff accommodation. This is also to include new ... login required. |
Details... |
1.6km |
06/01/2024 |
CONDITIONAL |
Butlerstown GAA Club , Holycross Butlerstown , Waterford |
To erect an equipment shed/office, incl. landscaping and all associated site development works... login required. |
Details... |
100m |
04/12/2023 |
CONDITIONAL |
Waterford Business Park , Ballynaneashagh Cork Road , Waterford |
for the provision of car display parking area and all associated site development works, incorporating retaining walls, security fencing and gates, lighting and site drainage... login required. |
Details... |
2.1km |
05/10/2023 |
CONDITIONAL |
Woodstown , Butlerstown , Waterford |
to erect a dwelling house with sewage treatment system & all ancillary works... login required. |
Details... |
750m |
04/10/2023 |
CONDITIONAL |
Costa Coffee Unit , Waterford Retail Park , Cork Road Butlerstown |
Provision of a drive-thru lane for the Costa Coffee Unit, including a canopy and service hatch on the southwestern side of the unit, a height restrictor/entrance barrier on the access lane, 3.5m wide drive-thru lane and associated hard and soft landscaping, resulting in the removal of 24 no. existing carparking spaces; Provision of associated s... login required. |
Details... |
910m |
29/08/2023 |
REFUSED |
Waterford Retail Park , Cork Road , Butlerstown North Waterford |
development which will consist of a standalone 3 storey building to accommodate medical related uses with all associated ancillary accommodation and standalone ESB substation (totalling 3490sqm gross floor area). Access will be from the existing Waterford Retail Park access on the Outer Ring Road through the existing car park where an additional 102 park... login required. |
Details... |
290m |
14/08/2023 |
CONDITIONAL |
Witches Lane , Ballynaneashagh , Waterford |
for the construction of a single storey, 3-bedroom detached dwelling house to include new driveway, new entrance piers, footpaths, terrace area, landscaping, boundary treatments, together with all associated site works and drainage connections, ... login required. |
Details... |
1.8km |
09/08/2023 |
CONDITIONAL |
Land to the north and east of the existing ESB 110kV substation , Butlerstown South Butlerstown , Co. Waterford |
development which will consist of the following elements: A building (c.494 sq. m. and c.10m high) to house plant and equipment including 2 no. synchronous condensers with a storage room and a control and switchgear room; Plant and equipment to be located outside of the building but within a fenced compound which will include 2 no. Coolers surrounded by timber acoustic fencing, 2 no. Gas Circuit Breakers and a Switchgear Compound. The Switchgear Compound will have a galvanised?palisade security fence and include a transformer, a Low-Level Disconnector w... login required. |
Details... |
290m |
04/08/2023 |
N/A |
Witches Lane , Ballynaneashagh , Waterford |
for the construction of a single storey, 3-bedroom detached dwelling house to include new driveway, new entrance piers, footpaths, terrace area, landscaping, boundary treatments, together with all associated site works and drainage connections, all at Witches Lane, Ballynaneashagh, Waterford.... login required. |
Details... |