2.6km |
25/10/2024 |
N/A |
Killoran , Templetuohy Thurles , Co Tipperary |
extensions & alterations to existing farmhouse, relevant demolition works to structures attached to house to facilitate the extension and renovation of the house, permission for new septic tank & percolation area, a new vehicular entrance and to include all associated site works... login required. |
Details... |
2.6km |
14/10/2024 |
N/A |
Killoran , Templetuohy Thurles , Co. Tipperary |
extensions & alterations to existing farmhouse, permission for new septic tank & percolation area and a new vehicular entrance and to include all associated site works... login required. |
Details... |
2.2km |
22/08/2023 |
CONDITIONAL |
Lisheen Lower , Moyne , Thurles Co. Tipperary |
an overground slurry storage tower and all other necessary associated site development works... login required. |
Details... |
2.2km |
31/07/2023 |
N/A |
Lisheen Lower , Moyne , Thurles Co. Tipperary |
an overground slurry storage tower & all other necessary associated site development works... login required. |
Details... |
2.8km |
17/02/2023 |
CONDITIONAL |
Moynetemple , Moyne , Thurles |
alterations & extensions to the rear of the house, demolish existing shed and install new waste water treatment system with all associated site works... login required. |
Details... |
2.4km |
21/10/2022 |
CONDITIONAL |
Kilclonagh , Moyne , Thurles |
the following works: a) retention of alterations to the previously approved planning permission register reference 21/251 in respect of the retention of as constructed alterations to the previously approved detached garage structure; b) all associated site works ... login required. |
Details... |
2.9km |
28/07/2022 |
CONDITIONAL |
Derryville , Co. Tipperary , Tipperary |
a 10-year planning permission for development of a BioProducts Campus. The Bioproducts Campus development consists of an integrated Compost / Growing Media Facility and Anaerobic Digestion Facility as well as a Biorefinery. The Compost / Growing Media Facility comprises 1 No. composting building (incorporating feedstock intake area, storage area, in-vessel tunnels, workshop), solar panels at roof level, associated biofilter and liquid storage tanks, 1 No. maturation building and 1 No. office building. The Anaerobic Digestion Facility comprises 3 No. digester tanks, 2 No. digestate storage tanks, 2 No. biogas fuelled electricity generating gas engines, 3 No. biogas processing units, associated storage tanks, bunding, plant and 1 No. gas flare. The BioRefinery includes 1 No. building (incorporating a goods inward area, processing area, drying room, process control rooms, a laborato... login required. |
Details... |
2.3km |
01/07/2022 |
CONDITIONAL |
Crannagh , Templetuohy , Thurles |
an extension to existing single storey house to include kitchen, utility, dining area, living room, bathroom and 2 number bedrooms, new septic tank, percolation area widen existing entrance and ancillary site works... login required. |
Details... |
2.8km |
13/06/2022 |
CONDITIONAL |
Kilclonagh , Thurles , Co. Tipperary |
the demolition of the existing dwelling, outbuildings and decommissioning of existing septic tank and permission for a new replacement dwelling with a new entrance, a new garage, a new septic tank and percolation area and all associated site works ... login required. |
Details... |
70m |
18/05/2022 |
CONDITIONAL |
Lisheen and Barnalisheen , Templetuohy , Co. Tipperary |
alterations to the design of the existing machinery store incorporating an enclosed parts storage area at one end and a body repair area a the other end, PERMISSION also to extend the parts storage area within the existing machinery store, to build a new machinery storage buildin... login required. |
Details... |
920m |
31/01/2022 |
CONDITIONAL |
Barnalisheen , Templetuohy , Thurles |
the following works: a) construction of a new, part two-storey, part single-storey detached dwelling; b) new detached garage; c) new site entrance; d) new connections to existing utilities; e) new waste-water treatment system & percolation area; f) all associated site works ... login required. |
Details... |
910m |
27/01/2022 |
N/A |
Barnalisheen , Templetuohy , Thurles |
Full planning permission for the following works: a) construction of a new, part two-storey, part single-storey detached dwelling; b) new detached garag... login required. |
Details... |
2.4km |
13/12/2021 |
CONDITIONAL |
Kilclonagh , Moyne , Thurles |
a.) alterations to the previously approved planning permission reference 21/251, the proposed alterations relate to the alteration of the previously approved k... login required. |
Details... |
2.4km |
10/11/2021 |
N/A |
Lisdonowley , Moyne , Thurles |
a) construction of a new, part two-storey, part single-storey detached dwelling, b) new detached garage, c) new site entrance, d) new connections to existing utilities, e) new waste-water treatment system and percolation area, f) all associated site works... login required. |
Details... |
1.8km |
18/08/2021 |
CONDITIONAL |
Lisdonowley , Moyne , Thurles |
construction of a slatted house with slurry tank, loose house, two loose house extensions to existing slatted house and associated works... login required. |
Details... |
2.8km |
14/05/2021 |
CONDITIONAL |
Moynetemple , Moyne , Thurles Co. Tipperary |
change of use of existing building from health centre to a cafe and shop, works will involve internal layout alterations and some external alterations to the building including outdoor dining area with all associated site works... login required. |
Details... |
2.8km |
30/04/2021 |
N/A |
Moynetemple , Moyne , Thurles Co. Tipperary |
change of use of existing building from Health Centre to a café and shop, the works will involve internal layout alterations and some external alterations to the building with all asociated site works... login required. |
Details... |
2.8km |
13/04/2021 |
N/A |
Moynetemple , Moyne , Thurles |
change of use of existing building from Health Centre to a café and shop, the works will involve internal layout alterations and some external alterations to the building with all asociated site works... login required. |
Details... |
2.4km |
02/03/2021 |
CONDITIONAL |
Kilclonagh , Moyne , Thurles Co. Tipperary |
a) construction of a new, part 2-storey, part single-storey detached dwelling, b) new detached garage and carport, c) new site entrance, d) new bored well, e) new waste water treatment system and percolation area and f) all associated site works... login required. |
Details... |
1.4km |
25/02/2021 |
CONDITIONAL |
Killoran , Templetuohy , Thurles Co. Tipperary |
the as constructed extension to existing dwelling house and all associated site works and PERMISSION for new waste water treatment system... login required. |
Details... |