1.1km |
19/04/2024 |
N/A |
Rosegreen , Garryandrew South , Cashel Co. Tipperary |
the installation of a wastewater treatment system to service an existing dwelling as granted under planning ref. 22/20 ... login required. |
Details... |
2.5km |
15/04/2024 |
N/A |
Castleblake , Rosegreen Cashel , Co. Tipperary |
the construction of a haybarn and all associated site development works... login required. |
Details... |
2.4km |
12/04/2024 |
N/A |
Castleblake , Rosegreen Cashel , Co. Tipperary |
the construction of a haybarn and all associated site development works... login required. |
Details... |
2.3km |
22/01/2024 |
N/A |
Bullockpark , Rosegreen , Co. Tipperary |
the following; a) single-storey front porch extension to dwelling, b) single-storey glasshouse, c) storage container to rear of property, d) dog kennels, e) partial conversion of garage to domestic use and all associated site works... login required. |
Details... |
2.9km |
14/11/2023 |
CONDITIONAL |
De Barra Farm , Tullamaine , Fethard |
(1) the construction of a storey and a half extension to dwelling, (2) the renovation of the existing dwelling, (3) the construction of a domestic garage and associated site works ... login required. |
Details... |
1.4km |
21/09/2023 |
CONDITIONAL |
Rathmacarty East , Rosegreen , Co. Tipperary |
a dwelling house, garage, entrance, driveway, treatment system and all associated site development works... login required. |
Details... |
2.6km |
15/03/2023 |
CONDITIONAL |
Loughkent Lower , New Inn , Cahir |
a loose shed with manure area and all associated site works... login required. |
Details... |
2.4km |
07/03/2023 |
CONDITIONAL |
Castleblake , Rosegreen , Cashel |
the construction of a wash bay and fuel storage building and all associated site development works including access road, wash bay, fuel interceptor and silt tanks ... login required. |
Details... |
2.9km |
04/01/2023 |
CONDITIONAL |
Loughkent East , New Inn , Cashel |
for extensions to the side and rear of the existing house, b) a domestic shed and c) associated site works. One extended cottage with a shed and a garage, max height is 5.8m.... login required. |
Details... |
2.5km |
01/11/2022 |
CONDITIONAL |
Castleblake , Rosegreen , Cashel Co. Tipperary |
a Grain Store Building incorporating an In-Take Building, Dryer & Dust House, overhead-enclosed conveyor system connecting the Dryer to the new stores and all associated site development works ... login required. |
Details... |
2.3km |
07/10/2022 |
CONDITIONAL |
Rathmacarty East , Rosegreen , Co Tipperary |
existing garage / store as built... login required. |
Details... |
1.1km |
14/01/2022 |
CONDITIONAL |
Rosegreen , GarryandrewSouth , Cashel |
Permission for the demolition of an existing derelict dwelling and for the construction of a new 2-storey dwelling house along with all associated site works ... login required. |
Details... |
1.1km |
20/12/2021 |
N/A |
Rosegreen , Garryandrew South , Cashel |
the demolition of an existing derelict dwelling and for the construction of a new 2 storey dwellinghouse along with all associated site works ... login required. |
Details... |
2.6km |
16/12/2021 |
CONDITIONAL |
Castleblake E.D. , Graigue , co. Tipperary |
the demolition of seven existing pig rearing buildings, and for the erection of a new pig rearing building to upgrade and replace existing buildings, along with all associated site works. All works take place within the curtilage of an existing pig rearing facility... login required. |
Details... |
2.6km |
29/11/2021 |
N/A |
Castleblake E.D. , Graigue , Co. Tipperary |
the demolition of seven existing pig rearing buildings, and for the erection of a new pig rearing bulding to upgrade and replace existing buildings, along with all associated site works. All works take place within the curtilage of an existing pig rearing facility ... login required. |
Details... |
420m |
22/11/2021 |
CONDITIONAL |
Ballydoyle , Rosegreen , Cashel |
to construct horse washbays with plant room and tread mill building together with all associated site development works including access path and road, effluent tank, and silt tank with storm percolation system.... login required. |
Details... |
680m |
03/11/2021 |
CONDITIONAL |
Ballydoyle , Rosegreen , Cashel |
construct a proposed machinery yard consisting of (a) a machinery storage shed incorporating workshop and stores, (b) an open fronted machinery storage shed (c) a staff facilities building (d) a forge buil... login required. |
Details... |
420m |
21/09/2021 |
CONDITIONAL |
Ballydoyle , Rosegreen , Cashel |
the erection of an ESB sub-station including all associated site development works... login required. |
Details... |
410m |
30/08/2021 |
CONDITIONAL |
Ballydoyle , Rosegreen , Cashel |
(a) demoliton of an existing semi-covered ride, stables and farm storage sheds and covered ride, and (b) construction of a new semi-covered ride including all associated site development works... login required. |
Details... |