2.8km |
11/09/2024 |
CONDITIONAL |
Four Penny Rd. , Golden , Co. Tipperary |
a) the demolition of existing shed, b) the alteration, modifications and extension to the existing dwelling, c) the proposed new wastewater treatment system & percolation area, d) the proposed domestic garage and all associated site works... login required. |
Details... |
2.9km |
04/09/2024 |
CONDITIONAL |
Rathcloheen , Golden , Co. Tipperary |
the decommission of an existing septic tank and installation of an upgraded onsite waste water treatment and disposal system and all associated site works... login required. |
Details... |
2.9km |
29/08/2024 |
N/A |
Rathcloheen , Golden , Co. Tipperary |
to decommission existing septic tank and install an upgraded onsite waste water treatment and disposal system and all associated site works.... login required. |
Details... |
2.8km |
21/08/2024 |
N/A |
Four Penny Rd. , Golden , Co. Tipperary |
the removal of the roof on lean-to structure to the rear of the house (south), the removal of flat roof to the side of the house (east) and alterations to the existing walls and pitched roof on the main dwelling to incorporate the entire floor area of the existing dormer bungalow. The removal of the existing barn to the rear of the hou... login required. |
Details... |
1.5km |
19/06/2024 |
REFUSED |
Comerford's Lot , Golden , Co. Tipperary |
dwelling, garage, effluent treatment system, relocation of parents entrance to create a joint entrance and all associated site works... login required. |
Details... |
2.8km |
04/04/2024 |
CONDITIONAL |
Ballinamona , Cashel , Co. Tipperary |
a) the porch extension to the house, b) a domestic shed, c) a garden office/gym, d) entrance, e) boundary treatments, and f) associated site works... login required. |
Details... |
2km |
10/03/2024 |
CONDITIONAL |
Mantlehill Great , Golden , Co. Tipperary |
the construction of a roofed horse walker with all associated site works... login required. |
Details... |
1.9km |
11/01/2024 |
CONDITIONAL |
Main Street , Golden , Co. Tipperary |
conversion and renovations of dwelling house to 2 No. 1 Bed Apartments, and retention permission for demolition of back porch and retention permission for construction of two storey extension at the rear of the dwelling house and retention permission for construction of metal walkway to the rear of the property leading to the first floor apartment.
Retention permission for partly constructed Toilet Block to the rear of the dwelling house and permission to demolish the toilet block consisting of three cubicles.
Retention permission for conversion of part of bar area of premises known as "Fogarty's Pub", pool room, stores and ladies and gents toilets ... login required. |
Details... |
2.6km |
16/11/2023 |
CONDITIONAL |
Templenoe , Cashel , Co. Tipperary |
(1) the construction of an extension to an existing dwelling house, (2) associated remedial works to the existing dwelling house, (3) the construction of a private garage, (4) and all associated site works ... login required. |
Details... |
2.3km |
12/10/2023 |
CONDITIONAL |
Shanballyduff , Cashel , Co. Tipperary |
the construction of a domestic extension to an existing dwelling and including all associated site development works. Retention Permission is also sought for a detached domestic garage ... login required. |
Details... |
710m |
29/09/2023 |
CONDITIONAL |
Cloughleigh , Golden , Co. Tipperary |
Two storey extension at rear of dwelling house; One ‘velux’ style roof window in the north (front) roof slope of house; Three additional ‘velux’ style roof windows in the south (rear) roof slope of house; Change of a window to a door on the south (rear) elevation of house; Enlargement of a window o... login required. |
Details... |
640m |
22/09/2023 |
CONDITIONAL |
Cloghleigh , Golden , Co. Tipperary |
new single storey dwelling house, effluent treatment system together with all associated site works... login required. |
Details... |
1.2km |
03/08/2023 |
CONDITIONAL |
Cloghleigh , Golden , Cashel Co Tipperary |
the construction of a new stable barn, ancillary underground soiled water tank and concrete apron and all Associated Works. The stable barn will be 28.8 m long , 14.15 mt wide a... login required. |
Details... |
1.9km |
13/07/2023 |
N/A |
Main Street , Golden , Co. Tipperary |
conversion and renovations of dwelling house to 2 No. 2 Bed Apartments and retention permission for demolition of back porch and retention permission for construction of two storey extension at the rear of the dwelling house and retention permission for construction of metal walkway to the rear of the property leading to the first floor apartment.Retention permission for partly constructed Toilet Block to the rear of the dwelling house and permission to demolish the toilet block consisting of three cubicles. Retention permission for conversion of part of bar area of premises known as "Fogarty's Pub", pool room, stores and... login required. |
Details... |
0m |
12/05/2023 |
CONDITIONAL |
Cloghleigh , Golden , Co. Tipperary |
(a) six mushrooms tunnels no’s 86, 87, 88, 89, 90 & 91. (b) building with central corridor area no 92. (c) four soil water tanks no 93, 94, 95 & 97 (d)construction o... login required. |
Details... |
650m |
02/05/2023 |
CONDITIONAL |
Cloghleigh , Golden , Co. Tipperary |
new single storey dwelling house with entrance and access road, effluent treatment system together with all associated site works... login required. |
Details... |
2.2km |
03/02/2023 |
CONDITIONAL |
Cloghleigh , Golden , Cashel Co. Tipperary |
the erection and operation of an asphalt plant (stack height 30 metres), together with an ancillary office unit (133.6 sqm GIA), a weighbridge, hardstanding, the e... login required. |
Details... |
2.3km |
30/01/2023 |
N/A |
Cloghleigh , Golden , Cashel |
the erection and operation of asphalt plant (stack height 30 metres), together with an ancillary office unit (133.6 sqm G1A), a weighbridge, hardstanding, the ... login required. |
Details... |
50m |
13/12/2022 |
UNCONDITIONAL |
Cloghleigh , Golden , Co. Tipperary |
development of 12 mushroom tunnels with building canopy, also to replace mushroom tunnel no. 8 with dry store building and move mushroom tunnel no. 8 to new area on the site to no. 63, to include building canopy at one end of tunnel, proposed dry store building no. 64 to include cold store and packaging area. Proposed dry store building no. 61 will incorporate woodchip bo... login required. |
Details... |