2.8km |
15/10/2024 |
N/A |
Kilkeary , Nenagh , Co. Tipperary |
a domestic garage together with all associated site works... login required. |
Details... |
2.8km |
14/10/2024 |
N/A |
Kilkeary , Nenagh , Co. Tipperary |
the construction of a domestic garage together with all associated site works... login required. |
Details... |
1.1km |
18/09/2024 |
CONDITIONAL |
Monaquill , Ballinaclough , Nenagh Co Tipperary |
construction of a dwelling house, garage, wastewater treatment system and upgrade existing entrance along with all ancillary site works... login required. |
Details... |
690m |
14/05/2024 |
CONDITIONAL |
Ballynenagh Ballinaclough , Nenagh , Co. Tipperary. |
the construction of a new single storey/storey and a half dwelling house, domestic garage, entrance, waste water treatment and disposal system and associated site works... login required. |
Details... |
1.1km |
04/04/2024 |
CONDITIONAL |
Monaquill , Ballinaclough , Nenagh |
dwelling house, garage, wastewater treatment system & upgrade existing entrance along with all ancillary site works... login required. |
Details... |
2.5km |
07/02/2024 |
CONDITIONAL |
Townlands of Kerane Fawnlough and Ballynaclough , Nenagh , Co. Tipperary |
a 10-year planning permission to construct and complete a solar PV Energy Development with a total site area of c. 88.5 hectares comprising of solar PV ground mounted on support structures, inverter substations, 38kV substation, watercourse crossings, temporary construction compounds, internal access tracks (new, upgrading existing and existing), security fencing, electrical cabling and ducting, CCTV and other ancillary in... login required. |
Details... |
2.4km |
26/01/2024 |
N/A |
Townlands of Kerane Fawnlough and Ballynaclough , Nenagh , County Tipperary |
permission for development at this site within the townlands of Kerane, Fawnlough and Ballynaclough, Nenagh, Co. Tipperary.
The development will consist of a 10-year planning permission to construct and complete a solar PV Energy Development with a total site area of c. 88.5 hectares comprising of inverter substations, m... login required. |
Details... |
810m |
08/06/2023 |
N/A |
Ballynenagh Ballinaclough , Nenagh , Co. Tipperary |
the construction of a new single storey/storey and a half dwelling house, domestic garage, entrance, waste water treatment and disposal system and associated site works... login required. |
Details... |
180m |
11/04/2023 |
CONDITIONAL |
Ballyquiveen , Ballinaclough , Nenagh Co. Tipperary |
domestic extension to dwelling and domestic garage/sheds as constructed... login required. |
Details... |
830m |
15/10/2022 |
CONDITIONAL |
Bunadoher , Ballinaclough , Nenagh |
an extension and for the renovation of an existing single storey dwelling house to include two storey domestic extension, replace existing septic tank install new septic tank, percolation area and ancillary site works... login required. |
Details... |
1.2km |
29/09/2022 |
CONDITIONAL |
Ballyvanran , Ballinaclough , Nenagh |
a single storey extension (36 sq m) at the front of the property connected to the existing kitchen and living area including alterations to the existing house and associated site works... login required. |
Details... |
2.6km |
01/09/2022 |
CONDITIONAL |
Traveston , Traveston , Dolla Co Tipperary |
the demolition of existing substandard dwelling and outbuilding and to construct a replacement dwellinghouse, new garage, new wastewater treatment system and percolation area, and ancillary works... login required. |
Details... |
1.2km |
10/06/2022 |
N/A |
Ballyvanran , Ballinaclough , Nenagh Co. Tipperary |
a single storey extension (36 sq. m) at the front of the property connected to the existing kitchen and living area including alterations to the existing house and associated site works... login required. |
Details... |
2.3km |
20/01/2022 |
CONDITIONAL |
Kilkeary , Nenagh , Co Tipperary |
to construct a part storey and a half/part single storey dwelling house, onsite wastewater treatment system and site entrance, together with associated siteworks ... login required. |
Details... |
2.6km |
12/11/2021 |
CONDITIONAL |
Ballynaclough , Nenagh , Co. Tipperary |
1) bedroom, en-suite and walk-in wardrobe on ground floor 2) domestic garage to the rear of dwelling house ... login required. |
Details... |
2.6km |
08/10/2021 |
N/A |
Ballynaclough , Nenagh , Co. Tipperary |
1) change of use from original domestic garage to bedroom, en-suite and walk in wardrobe and 2)existing domestic garage to the rear of dwelling house (planning permission ref: 04510526 refers)... login required. |
Details... |
2.6km |
08/10/2021 |
CONDITIONAL |
Kilkeary , Nenagh , Co. Tipperary |
new dormer type dwelling house with adjoining domestic garage, entrance on site, waste water treatment system, percolation area and all associated site works... login required. |
Details... |
2.9km |
13/09/2021 |
CONDITIONAL |
Kilkeary , Nenagh , Co Tipperary |
to construct an extension to rear of dwelling, change the front door entrance area of the dwelling and carry out all ancillary site works... login required. |
Details... |
2.6km |
06/09/2021 |
N/A |
Kilkeary , Nenagh , Co. Tipperary |
dormer type dwelling house with adjoining domestic garage, entrance on site, waste water treatment system, percolation area and all associated site works... login required. |
Details... |