2.3km |
31/10/2024 |
N/A |
Boherbaun Capparoe , Nenagh , Co. Tipperary |
a two-storey pitched roof extension to the rear of the existing dwelling, including three dormer windows at attic level. The attic level will contain three new bedrooms (two en-suite). The ground floor will feature a new kitchen, utility room, pantry, and sitting room. A single-storey pitched roof extension wil... login required. |
Details... |
570m |
18/10/2024 |
N/A |
Cloonanagh , Silvermines , Nenagh Co. Tipperary |
detached domestic garage, storage shed to the rear of the site and revised site entrance position together with associated site works and PERMISSION to replace an existing gable window with a patio door and insert an additional roof window to the rear of the existing dwelling house... login required. |
Details... |
2.2km |
16/10/2024 |
N/A |
Boherbaun Capparoe , Nenagh , Co. Tipperary |
a two-storey pitched roof extension at the rear, featuring three dormer windows. The attic level will include three new bedrooms, two of which will have en-suite bathrooms. The ground floor will comprise a new kitchen area, utility room, pantry, and sitting room.... login required. |
Details... |
210m |
01/07/2024 |
N/A |
Cloonanagh , Silvermines , Nenagh |
the construction of a playground and ancillary works... login required. |
Details... |
950m |
12/04/2024 |
CONDITIONAL |
Cooleen Silvermines , Nenagh , Co. Tipperary |
the construction of a single-storey dwelling house, detached garage, wastewater treatment system, site entrance and all ancillary site works thereto... login required. |
Details... |
810m |
19/03/2024 |
CONDITIONAL |
Gortshaneroe , Silvermines , Co. Tipperary |
construction of a wastewater treatment system and percolation area and all ancillary site works... login required. |
Details... |
2.1km |
11/01/2024 |
CONDITIONAL |
Lisnageenly , Silvermines , Nenagh |
the construction of a new house, entrance and waste water treatment system with all associated site works... login required. |
Details... |
3km |
04/01/2024 |
CONDITIONAL |
Gortnacleha , Capparoe , Nenagh |
the construction of an entrance, dwelling house, garage, domestic waste water treatment system with polishing filter together with all associated site works... login required. |
Details... |
330m |
18/09/2023 |
CONDITIONAL |
Old Road , Silvermines , Nenagh |
the construction of 2 number single storey 2 bedroom dwellings, a connection to all existing services, entrance to roadway and all associated site works... login required. |
Details... |
320m |
12/09/2023 |
N/A |
Old Road , Silvermines Nenagh , Co. Tipperary |
3 number single story 2 bedroom dwellings, a connection to all existing services, entrance to roadway and all associated site works... login required. |
Details... |
2.3km |
29/08/2023 |
CONDITIONAL |
Erinagh , Capparoe , Nenagh |
an extension to existing house and upgrade of the wastewater treatment system... login required. |
Details... |
310m |
18/08/2023 |
CONDITIONAL |
Cooleen , Silvermines , Co. Tipperary |
dwelling house, entrance, boundary walls, onsite waste water treatment and disposal system and all associated works... login required. |
Details... |
270m |
11/07/2023 |
CONDITIONAL |
Cloonanagh , Silvermines , Nenagh |
storage sheds as constructed... login required. |
Details... |
2.9km |
23/06/2023 |
CONDITIONAL |
Erinagh , Capparoe , Nenagh |
domestic extension at rear of dwelling, with attic storage over & domestic garage at side of same dwelling... login required. |
Details... |
1.8km |
20/06/2023 |
CONDITIONAL |
Cloonanagh , Capparoe , Nenagh |
house, carport and storage sheds as constructed... login required. |
Details... |
1.8km |
06/04/2023 |
CONDITIONAL |
Cloonanagh , Capparoe Nenagh , Co. Tipperary |
the demolition of existing substandard dwelling house, construction of a replacement dwelling house, garage, installation of a new domestic wastewater treatment system with polishing filter together with all associated site works ... login required. |
Details... |
20m |
05/04/2023 |
CONDITIONAL |
Ballygowan South , Silvermines , Nenagh Co. Tipperary |
provision of a widened site entrance, new road boundary wall and all associated site works... login required. |
Details... |
80m |
05/04/2023 |
CONDITIONAL |
Ballygowan South , Silvermines , Nenagh Co. Tipperary |
the demolition of an existing mixed-use agricultural shed and the erection of a machinery store shed and all associated site works. The development is located within the curtilage of recorded protected structure TRPS471... login required. |
Details... |
2.2km |
22/03/2023 |
CONDITIONAL |
Sragh , Capparoe , Nenagh Co. Tipperary |
(i) construction of a slatted livestock unit, proposed slatted unit to incorporate associated underground slurry storage tank with external agitation point... login required. |
Details... |