2km |
15/11/2024 |
N/A |
Lissenhall , Nenagh , Co. Tipperary |
a new single storey dwelling house, domestic garage, entrance, waste water treatment and disposal system and associated site works... login required. |
Details... |
2.6km |
11/11/2024 |
N/A |
Plunkett Street Tullaheady , Nenagh , Co. Tipperary |
to retain the following:- 1) Revised boundary types and location. 2) Extension to carpark area. 3) All associated site works and permission for temporary change of use of existing car parking area to storage area for empty skips ... login required. |
Details... |
2.2km |
31/10/2024 |
N/A |
Boherbaun Capparoe , Nenagh , Co. Tipperary |
a two-storey pitched roof extension to the rear of the existing dwelling, including three dormer windows at attic level. The attic level will contain three new bedrooms (two en-suite). The ground floor will feature a new kitchen, utility room, pantry, and sitting room. A single-storey pitched roof extension wil... login required. |
Details... |
2.6km |
24/10/2024 |
N/A |
Plunkett Street Tullaheady , Nenagh , Co. Tipperary |
Retention permission to retain the following:-
1) Revised boundary types and location
2) Extension to carpark area
3) All associated site works
and permission for temporary change of use for storage of skips ... login required. |
Details... |
2.8km |
18/10/2024 |
N/A |
Cloonanagh , Silvermines , Nenagh Co. Tipperary |
detached domestic garage, storage shed to the rear of the site and revised site entrance position together with associated site works and PERMISSION to replace an existing gable window with a patio door and insert an additional roof window to the rear of the existing dwelling house... login required. |
Details... |
2.2km |
16/10/2024 |
N/A |
Boherbaun Capparoe , Nenagh , Co. Tipperary |
a two-storey pitched roof extension at the rear, featuring three dormer windows. The attic level will include three new bedrooms, two of which will have en-suite bathrooms. The ground floor will comprise a new kitchen area, utility room, pantry, and sitting room.... login required. |
Details... |
2.6km |
18/09/2024 |
CONDITIONAL |
Dromin , Carrigatoher , Co. Tipperary |
(1) the construction of an extension to the existing dwelling; (2) the construction of a balcony at first floor level to the existing dwelling; (3) the construction of a detached garage and all associated site works... login required. |
Details... |
2km |
03/09/2024 |
CONDITIONAL |
Lissenhall , Nenagh , Co. Tipperary |
the construction of a detached dwelling house, detached domestic garage, wastewater treatment system, site entrance and all ancillary site works thereto... login required. |
Details... |
180m |
25/07/2024 |
CONDITIONAL |
Carrow Capparoe , Nenagh , Co. Tipperary |
a domestic garage to the rear of existing dwelling house, together with all associated site works... login required. |
Details... |
180m |
19/07/2024 |
N/A |
Carrow Capparoe , Nenagh , Co. Tipperary |
a domestic garage to the rear of existing dwelling house together with all associated site works... login required. |
Details... |
2km |
02/07/2024 |
CONDITIONAL |
Lissenhall , Nenagh , Co. Tipperary |
domestic shed/garage, classic car storage shed, car port, barbecue area and revised site boundaries... login required. |
Details... |
2.7km |
29/05/2024 |
CONDITIONAL |
Carrigatogher (Ryan) , Nenagh , Co. Tipperary |
the construction of an entrance, dwelling house, garage, domestic wastewater treatment system with polishing filter together with all associated site works... login required. |
Details... |
2.9km |
18/04/2024 |
CONDITIONAL |
Plunkett Street , Tullaheady , Nenagh Co. Tipperary |
1) a domestic storage shed and covered open space, 2) a front boundary wall and entrance, 3) site boundaries, as constructed along with all ancillary site works... login required. |
Details... |
2.6km |
12/04/2024 |
CONDITIONAL |
Cooleen Silvermines , Nenagh , Co. Tipperary |
the construction of a single-storey dwelling house, detached garage, wastewater treatment system, site entrance and all ancillary site works thereto... login required. |
Details... |
1.9km |
29/08/2023 |
CONDITIONAL |
Erinagh , Capparoe , Nenagh |
an extension to existing house and upgrade of the wastewater treatment system... login required. |
Details... |
2.1km |
23/06/2023 |
CONDITIONAL |
Erinagh , Capparoe , Nenagh |
domestic extension at rear of dwelling, with attic storage over & domestic garage at side of same dwelling... login required. |
Details... |
1.8km |
20/06/2023 |
CONDITIONAL |
Cloonanagh , Capparoe , Nenagh |
house, carport and storage sheds as constructed... login required. |
Details... |
1.3km |
20/06/2023 |
CONDITIONAL |
Lisbrien , Capparoe , Nenagh Co. Tipperary |
the construction of a dwelling house, garage, waste water treatment system & entrance along with all ancillary site works... login required. |
Details... |
1.3km |
18/06/2023 |
N/A |
Lisbrien , Capparoe , Nenagh Co Tipperary |
construction of dwelling house, garage, waste water treatment system and entrance along with all ancillary site works... login required. |
Details... |
2km |
16/05/2023 |
REFUSED |
Lissenhall , Nenagh , Co. Tipperary |
a single storey dwelling house, detached domestic garage, installation of a mechanical aeration unit and polishing filter system, front boundary entrance walls with all associated site works... login required. |
Details... |