2.9km |
29/08/2024 |
N/A |
Kilmastulla , Birdhill Nenagh , Co. Tipperary |
the construction of a vehicular entrance, single storey dwelling house, domestic wastewater treatment system with polishing filter, together with all associated site works... login required. |
Details... |
1.8km |
29/08/2024 |
CONDITIONAL |
Killalane Ballinahinch , Birdhill Nenagh , Co. Tipperary |
a) extensions to both sides, front and rear of existing dwelling house, consisting of games room and covered barbeque area, both for use ancillary to dwelling house, b) domestic garage with covered carport, constructed forward of existing the b... login required. |
Details... |
0m |
07/08/2024 |
CONDITIONAL |
Ballintinoe , Ballina , Co. Tipperary |
a dwelling house, garage, waste water treatment system, entrance, driveway along with all ancillary site works... login required. |
Details... |
2.2km |
05/08/2024 |
N/A |
Gortglassabrien , Ballina , Co. Tipperary |
the construction of a dwelling house, garage, entrance, driveway, installation of a septic tank and percolation area and all associated site works... login required. |
Details... |
10m |
01/08/2024 |
N/A |
Ballintinoe , Ballina , Co. Tipperary |
a dwelling house, garage, waste water system, entrance, driveway along with all ancillary site works... login required. |
Details... |
2.7km |
27/05/2024 |
CONDITIONAL |
Kilmastulla , Birdhill , Co. Tipperary |
new dwelling, waste water treatment unit & percolation area, new entrance and associated works... login required. |
Details... |
2.2km |
27/03/2024 |
N/A |
Windy Ridge , Gortlassabrien , Ballina |
existing detached bungalow, detached garage and bored well as constructed & ancillary site works (previously approved planning permission reference no. 's Plc/4053 and Plc 14237. Planning permission for new entrance and driveway... login required. |
Details... |
640m |
05/03/2024 |
REFUSED |
The Round Hill , Ballinteenoe , Nenagh |
construction of an extension to rear of existing public house, which will comprise of a smoking area, extension to dance floor area, extension to toilets and the constructi... login required. |
Details... |
2.2km |
05/03/2024 |
N/A |
Windy Ridge , Gortlassobrien , Ballina Co. Tipperary |
detached bungalow, detached garage, entrance including driveway. septic tank including percolation area, bored well as constructed and ancillary site works... login required. |
Details... |
2.5km |
16/11/2023 |
CONDITIONAL |
Kilmastulla , Ballina , Co. Tipperary |
the construction of a three bay slatted shed, feeding passage and associated site works... login required. |
Details... |
2.9km |
28/10/2023 |
CONDITIONAL |
Ballymalone More , Ballina , Co. Tipperary |
a replacement single storey house, a waste water treatment system and all associated works... login required. |
Details... |
2.9km |
25/10/2023 |
N/A |
Ballymalone More , Ballina , Co. Tipperary |
a replacement single storey house, a waste water treatment system and all associated works... login required. |
Details... |
2.5km |
05/10/2023 |
N/A |
Kilmastulla , Ballina , Co Tipperary |
the construction of a three bay slatted shed, feeding passage and associated site works... login required. |
Details... |
2.5km |
29/09/2023 |
N/A |
Kilmastulla , Ballina , Killaloe |
the construction of a three bay slatted shed, feeding passage and associated site works... login required. |
Details... |
1.4km |
14/09/2023 |
N/A |
Gortnaskehy Carrigatoher , Nenagh , Tipperary |
the construction of a two storey dwelling house, detached domestic garage, onsite waste water treatment system and percolation area, connection to necessary services, new entrance together with all associated site and incidental works... login required. |
Details... |
3km |
01/09/2023 |
CONDITIONAL |
Rossfinch , Ballinahinch , Birdhill |
an extension to the side and rear of house, also to install a new effluent treatment system on the site... login required. |
Details... |
1.3km |
27/08/2023 |
N/A |
Bushfield Carrigatoher , Nenagh , Co. Tipperary |
the construction of a two storey dwelling house, detached domestic garage, onsite waste water treatment system and percolation area, connection to necessary services, new entrance together with all associated site and incidental works... login required. |
Details... |
1.2km |
28/07/2023 |
CONDITIONAL |
The Orchard Ballyea South , Ballina , Co. Tipperary |
the demolition of extensions to gable of farmhouse; conversion of existing single storey barn to form extension to farmhouse; construction of additional two storey exten... login required. |
Details... |
2.3km |
14/07/2023 |
CONDITIONAL |
Greenhall , Ballinahinch , Co. Tipperary |
new dwelling, domestic garage, entrance, septic tank, percolation area with all associated site works... login required. |
Details... |
820m |
08/07/2023 |
CONDITIONAL |
Ballinteenoe , Carrigatoher , Co. Tipperary |
the demolition of existing derelict outbuilding to side of existing dwelling house & for the construction of an extension to the side & rear of existing dwelling house for use as an independent livin... login required. |
Details... |