1.7km |
04/01/2024 |
CONDITIONAL |
Gortnacleha , Capparoe , Nenagh |
the construction of an entrance, dwelling house, garage, domestic waste water treatment system with polishing filter together with all associated site works... login required. |
Details... |
3km |
14/11/2023 |
N/A |
Gortmore , Carrigatoher , Nenagh |
change of use of the existing site from a commercial car sales and showroom to use as a site for the assembly and display of outdoor garden building and furniture, together with retention permission for use of hard standing area on the opposite side of the L6044 public road for the... login required. |
Details... |
2.9km |
29/08/2023 |
CONDITIONAL |
Erinagh , Capparoe , Nenagh |
an extension to existing house and upgrade of the wastewater treatment system... login required. |
Details... |
2.7km |
14/07/2023 |
CONDITIONAL |
Greenhall , Ballinahinch , Co. Tipperary |
new dwelling, domestic garage, entrance, septic tank, percolation area with all associated site works... login required. |
Details... |
2.9km |
30/06/2023 |
N/A |
Gortmore , Carrigatoher , Nenagh Co. Tipperary |
change of use of the existing site from a commercial car sales and showroom to use as a site for the assembly and display of outdoor garden building and furniture, together with retention permission for use of hard standing area on... login required. |
Details... |
2.6km |
23/06/2023 |
CONDITIONAL |
Erinagh , Capparoe , Nenagh |
domestic extension at rear of dwelling, with attic storage over & domestic garage at side of same dwelling... login required. |
Details... |
960m |
07/12/2022 |
CONDITIONAL |
Shallee (Coughlan) Killoscully , Nenagh , Co Tipperary |
rear extension and alterations to existing dwelling, new treatment system with polishing filter bed, new entrance and all ancillary works... login required. |
Details... |
2.2km |
28/10/2021 |
N/A |
Castlecranna , Carrigatoher , Nenagh |
completion of dwelling and detached domestic garage as previously permitted (planning ref (07/51/1217), connection to necessary services, boundary treatments together with all associated site works and Permission for installation of waste water treatment system... login required. |
Details... |
1.8km |
17/09/2021 |
CONDITIONAL |
Gortmore , Carrigatoher , Nenagh |
construction of a vehicular entrance, dwelling house, domestic wastewater treatment plant with polishing filter together with all associated site works... login required. |
Details... |
2.2km |
06/09/2021 |
N/A |
Castlecranna , Carrigatoher , Nenagh |
installation of waste water treatment system and Retention Permission for completion of dwelling and detached domestic garage as previously permitted (Planning Ref 07/51/1217), connection to necessary services, boundary treatments together with all associated site works... login required. |
Details... |
2.5km |
11/08/2021 |
CONDITIONAL |
Gortnacleha , Capparoe , Nenagh Co. Tipperary |
construction of a part two storey/part single storey dwelling house, garage ancillary to dwelling, septic tank and percolation area, new entrance from public road, all associated site works thereto... login required. |
Details... |
1.1km |
21/07/2021 |
CONDITIONAL |
Shallee Lower & Upper , Ballinahinch , Co Tipperary |
development consist of replacement of viewing stand, installation of precast concrete ball wall with floodlighting and Astroturf playing surface, provision of walking track, replacement of existing chain link fence to front boundary with concrete block plastered wall and associated site works... login required. |
Details... |
2.5km |
15/06/2021 |
UNCONDITIONAL |
Erinagh , Capparoe , Nenagh Co. Tipperary |
an extension to dwellinghouse, construct garage, septic tank treatment system, percolation area and a new entrance and all ancillary site works ... login required. |
Details... |
1km |
03/06/2021 |
N/A |
Shallee , Ballinahinch , Co. Tipperary |
replacement of viewing stand, installation of precast concrete ball wall with floodlighting and astro turf playing surface, provision of a walking track, replacement of existing chain link fence to front boundary with concrete block plastered wall and associated site works... login required. |
Details... |
2.8km |
10/05/2021 |
CONDITIONAL |
Knockmeale , Killoscully , Newport Co. Tipperary |
existing 30m high monopole telecommunications support structure together with antennas, dishes and associated telecommunications equipment, all enclosed in security fencing... login required. |
Details... |
2.6km |
25/01/2021 |
CONDITIONAL |
Gortnaskehy , Carrigatoher , Nenagh |
construction of two storey dwelling, detached domestic garage, new access from existing access roadway, modifications to existing entrance which will become ... login required. |
Details... |
2.7km |
11/01/2021 |
N/A |
Bushfield , Carrigatoher , Nenagh |
construction of two storey dwelling, detached domestic garage, new access from existing access roadway, modifications to existing entrance which will become ... login required. |
Details... |