1.8km |
01/11/2024 |
N/A |
Knockavilla Ballyluddy , Pallasgreen , Co. Limerick. |
construction of an extension to the side and to the rear of existing dwelling house including all ancillary site works.... login required. |
Details... |
2.2km |
26/06/2024 |
REFUSED |
Kilduff , Pallasgreen , Co. Limerick. |
extension of duration for planning ref. 19/308 for the construction of 1 no. two storey extension to the side of existing nursing home with a first floor interconnecting corridor. The ground floor will consist of storage rooms, ... login required. |
Details... |
2.2km |
01/06/2024 |
CONDITIONAL |
Gortnakistin , Pallasgreen , Co. Limerick |
the extension and renovation of dwelling, permission to construct domestic garage on site, permission to replace existing vehicular entrance with new entrance, permission to demolish rear extension to dwelling and perm... login required. |
Details... |
260m |
12/12/2023 |
CONDITIONAL |
Cross , Pallasgreen , Co. Limerick |
the dwelling house and garage as constructed in addition to revised site boundaries, splayed entrance and all ancillary site works... login required. |
Details... |
2.7km |
25/10/2023 |
CONDITIONAL |
Newtown North , Pallasgreen , Co. Limerick |
planning (22/500) for the construction of a vehicular entrance, split level dwelling house, domestic waste water treatment system with polishing filter together with all associated site works... login required. |
Details... |
960m |
29/08/2023 |
CONDITIONAL |
Knockballyfookeen , Pallasgreen , Co. Limerick |
the construction of a warehouse extension for storage and change of use of existing creamery building to office, store and canteen, including all ancillary site works at Knockballyfookeen, Pallasgreen, Co. limerick... login required. |
Details... |
2.9km |
30/06/2023 |
CONDITIONAL |
Portane , Pallasgreen , Co. Limerick |
the construction of a dwelling house, waste water treatment system and percolation area, entrance, garage and all ancillary site works... login required. |
Details... |
1.7km |
24/03/2023 |
CONDITIONAL |
Ballinaclough , Pallasgreen , Co. Limerick |
(1) the demolition of existing dormer bungalow and outbuildings, (2) the construction of a new detached bungalow, (3) the revised location of entrance to site. Permission is also being sought for the installation of a temporary mobile home for the period of the site works... login required. |
Details... |
2km |
22/02/2023 |
CONDITIONAL |
Ballyvalode , Oola , C0. Limerick |
the demolition of existing single storey extension and the construction of a new single storey extension to the rear of existing dwelling house, installation of a replacement domestic waste water treatment system with polishing filter together with all associated site works... login required. |
Details... |
2.4km |
10/02/2023 |
CONDITIONAL |
Newtown North , Pallasgreen , Co. Limerick |
the demolition of a loose house, construction of a loose house and all associated site works... login required. |
Details... |
1.8km |
26/01/2023 |
REFUSED |
Cluggin , Oola , Co. Limerick |
the construction of a dwelling house, detached garage, recessed site entrance, wastewater treatment system with all ancillary site works... login required. |
Details... |
2.8km |
27/05/2022 |
CONDITIONAL |
Ballyvalode , Near Oola , Co. Limerick |
a 10-year permission for the construction of a 110kV ‘Loop In-Loop Out’ (LILO) substation and associated works on a site of approximately 6.20 hectares. This will include the following: A substation occupying 2.11 hectares, comprising: TSO (Eirgrid) compound with electrical equipment, transformer sub-compound, bus bars sub-compound, cable chairs and substation building (435m2), enclosed by palisade fencing at 0.95 hectares in area. One transformer up to 110kV within the TSO compound and the provision of an area for a second transformer if future Eirgrid expansion is required. Required TSO expansion area enclosed by palisade fencing at 0.79 hectares. Operators compound (with switchroom building, electrical equipment, rainwater collection system) enclosed by palisade fencing at 0... login required. |
Details... |
2.7km |
05/05/2022 |
CONDITIONAL |
Newtown North , Pallasgreen , Co. Limerick |
the construction of a vehicular entrance, split level dwelling house, domestic wastewater treatment system with polishing filter together with all associated site works... login required. |
Details... |
2.2km |
22/04/2022 |
N/A |
St. Anthony's Nursing Home , Kilduff , Pallasgreen Co. Limerick |
the installation of a 94KW solar photovoltaic system to existing roof structure and all ancillary site works... login required. |
Details... |
1.8km |
20/04/2022 |
CONDITIONAL |
Ballyvalode , Oola , Co. Limerick |
detached garage with car-port and car parking/ patio area at side of house... login required. |
Details... |
2.2km |
16/03/2022 |
CONDITIONAL |
St. Anthony's Nursing Home , Kilduff , Pallasgreen Co. Limerick |
the demolition of existing single storey flat roof section to the front of existing nursing home and construction of 1no. two storey extension as replacement to the existing structure. The ground floor will c... login required. |
Details... |
1.8km |
03/03/2022 |
N/A |
Ballyvalode , Oola , Co. Limerick |
detached garage with car-port and car parking/ patio area at side of house... login required. |
Details... |
2km |
09/02/2022 |
CONDITIONAL |
Gortnakisteen , Pallasgreen , Co. Limerick |
the construction of an entrance, dwelling house, domestic wastewater treatment system with polishing filter together with all associated site works... login required. |
Details... |
2.6km |
12/11/2021 |
REFUSED |
Ballyvalode Garryduff Gortnakistin Gortyvahane Keelogs Kilmacogue Moanoola and Moanroe , Co. Limerick |
a 10-year permission and 35 year operation for a solar farm on four land parcels as described herein; North Parcel(Gortnakistin townland) approximately 23.78 hectares, Central Parcel(Ballyvalode & Keeloges townlands) approximately 43.49 hectares, South Central Parcel(Gortyvahane and Moanroe townlands) approximately 34.7 hectares, South Parcel(Garryduff, Moanroe, Moanoola and Kilmacogue townland) approximately 39.27 hectares. The Central Parcel, South Central Parcel and South Parcel are collectively referred to as the Main Solar Farm; a route corridor of 0.58 hectares for an underground internal network cable along the R507 and L5040 public roads for approximately 600 metres and within the solar farm lands for approximately 1,260 metres. The total site area for the proposed development is approximately 141.8 hectares. The proposed development on these parcels comprises of 755,000sqm of solar photovoltaic panels on ground mounted steel frames; inverter/transformer stations; underground power and communication cables and... login required. |
Details... |