2.6km |
03/08/2024 |
CONDITIONAL |
Lissard , Galbally , Co. Limerick |
renovation and extension of the existing dwelling. The works include the demolition of previously constructed rear extension and part built walls to side and rear of the existing house. Construction of new side and rear extensions and front porch to the existing house. Permission is... login required. |
Details... |
30m |
26/06/2024 |
N/A |
Knockballymaloo , Kilross , Co. Tipperary |
conversion of 2 no. existing agricultural sheds into a mixture of 1 no. 1 bed apartment and 4 no. 2 bed apartments - to consist of a first floor extension and elevational changes to building, demolition of existing agricultura... login required. |
Details... |
1.4km |
28/05/2024 |
CONDITIONAL |
Ballynamrossagh , Kilross , Co. Tipperary |
the construction of a cattle shed with slatted tank and ancillary works... login required. |
Details... |
1.1km |
23/04/2024 |
CONDITIONAL |
Manour , Kilross , Co. Tipperary |
the construction of a calf house extension with effluent tank and ancillary works... login required. |
Details... |
620m |
28/03/2024 |
CONDITIONAL |
Moanour Td. , Kilross , Co. Tipperary |
a) the alterations to the roof, including replacement of the flat roof with a gable roof and conversion of attic for habitable use over the ground floor front/side extension (original extensi... login required. |
Details... |
0m |
20/03/2024 |
N/A |
Knockballymaloo , Kilross , Co Tipperary |
demolishing existing porch and to construct a new single storey front, side and rear extension, alterations to existing elevations, waste water treatment system, site boundaries and all associated site works... login required. |
Details... |
810m |
27/02/2024 |
CONDITIONAL |
Kilross , Co. Tipperary |
1. the dwelling house as constructed, 2. a detached domestic storage shed, 3. a detached boiler house, 4. site boundary amendments. PERMISSION for the constru... login required. |
Details... |
730m |
21/12/2023 |
N/A |
Kilross , Co. Tipperary |
demolition of existing commercial and residential building and construction of 4 no. two storey semi-detached dwellings, 6 no. ground floor apartments, 6 no. two storey du... login required. |
Details... |
720m |
15/12/2023 |
N/A |
Kilross , Co. Tipperary |
demolition of existing commercial and residential building and construction of 4 no. two storey semi-detached dwellings, 6 no. ground floor apartments, 6 no. two storey du... login required. |
Details... |
2.4km |
05/12/2023 |
CONDITIONAL |
Moorabbey , Galbally , Co. Tipperary |
the replacement of the existing glass porch with a new front porch, the construction of extensions to the sides and rear of existing bungalow and all associated site works... login required. |
Details... |
740m |
01/12/2023 |
N/A |
Kilross , Co. Tipperary |
demolition of existing commercial and residential building and construction of 4 no. two storey semi-detached dwellings, 6 no. ground floor apartments, 6 no. two storey du... login required. |
Details... |
2.8km |
21/10/2023 |
CONDITIONAL |
Moorsfort , Kilross , Co. Tipperary |
demolishing existing dwelling and Permission to construct replacement dwelling, sewage treatment system and percolation area. Permission to demolish three existing sheds and Permission to... login required. |
Details... |
1.3km |
16/08/2023 |
CONDITIONAL |
New Road , Kilross , Co. Tipperary |
a garage/shed constructed on site. The garage/shed has a total floor area of 106.83 m2 and has an A type roof, with an overall height of 4.00m. It consists of a cladded roof, cladded & block walls ... login required. |
Details... |
1.2km |
11/08/2023 |
CONDITIONAL |
Kilross , Co. Tipperary |
the construction of a dwelling house & garage with related site works... login required. |
Details... |
1.2km |
21/07/2023 |
N/A |
Kilross , Co. Tipperary |
the construction of a dwelling house & garage with related site works... login required. |
Details... |
2.7km |
16/02/2023 |
CONDITIONAL |
Lissard , Galbally , Co. Limerick |
the construction of a two-storey dwelling, garage, wastewater treatment system and polishing filter, new entrance and all associated site works... login required. |
Details... |
1.5km |
03/02/2023 |
CONDITIONAL |
Mooresfort , Lattin , Co. Tipperary |
the construction of a wash tank, additional ancillary storage facilities ... login required. |
Details... |
2.2km |
23/01/2023 |
CONDITIONAL |
Ballywire House , Ballywire Kilross , Co. Tipperary |
the conservation and repair of the single storey portion of the main house for use as a family kitchen and living room, the conservation and repair of the adjoining building for use as bedroom accommodation, to i... login required. |
Details... |
2.1km |
05/01/2023 |
N/A |
Ballywire House , Ballywire Kilross , Co. Tipperary |
the conservation and repair of the single storey portion of the main house for use as a family kitchen and living room, the conservation and repair of the adjoining building for use as bedroom accommodation, to include 2... login required. |
Details... |