2.3km |
30/03/2024 |
N/A |
Oola Hills East , Oola , Co. Limerick |
the construction of entrance, dwelling house, sewage treatment system and percolation area... login required. |
Details... |
1.8km |
27/03/2024 |
N/A |
Knockphelagh , Monard , Co. Tipperary |
the construction of a dwelling, site entrance, domestic garage, on-site effluent treatment system, and all associated site development works... login required. |
Details... |
1.5km |
29/02/2024 |
CONDITIONAL |
Acraboy , Monard , Co. Tipperary |
the extension and renovation of an existing dwelling and permission to demolish existing sun room and shed and for all associated site works... login required. |
Details... |
1.6km |
26/02/2024 |
CONDITIONAL |
Knockphelagh , Monard , Co. Tipperary |
change of layout of layout and house type previously granted under planning ref 20388 ... login required. |
Details... |
2.8km |
14/02/2024 |
N/A |
Newtown , Donohill , Co. Tipperary |
the refurbishment and extension of existing derelict dwelling house to include the installation of effluent treatment system and associated site development works... login required. |
Details... |
1.6km |
12/02/2024 |
N/A |
Knockphelagh , Monard , Co. Tipperary |
the construction of a new dwelling house and domestic garage (change of layout and house design granted under planning ref 20388) ... login required. |
Details... |
2.8km |
25/01/2024 |
N/A |
Monahalla (Monahilla) , Oola , Co. Limerick. |
the construction of an extension to the side and rear of our dwelling house, to include a privacy/screen wall attached to the front of the dwelling house and all ancillary site works... login required. |
Details... |
2km |
05/01/2024 |
N/A |
Kyle and Kyleagarry , Gortdrum , Co. Tipperary |
construction of an extension to the solar PV development permitted under planning application ref: PR 22/165 comprising the erection of photovoltaic panels laid out in arrays over a development area of ca. 17.44ha along with ancillary development including: 13 no. inverters (ca. 15.25m2 x 2.6m), 7 no. CCTV cameras mounted on 4m ... login required. |
Details... |
2.2km |
12/12/2023 |
CONDITIONAL |
Gotinstown , Tipperary , Co. Tipperary |
a dwelling extension to the side of an existing dwelling... login required. |
Details... |
1.6km |
23/11/2023 |
CONDITIONAL |
Boreen , Monard , Co. Tipperary |
a single storey sun-room extension at rear of previously permitted two storey extension which is at the rear of the original house; one velux style roof w... login required. |
Details... |
2.7km |
27/09/2023 |
CONDITIONAL |
Moanahila , Oola , Co. Limerick |
the construction of a single storey extension to existing dwelling house, installation of a new upgraded domestic wastewater treatment system with polishing filter, erection of recessed wing walls to improve existing vehicular entrance, together with all associated site works... login required. |
Details... |
2.4km |
13/09/2023 |
REFUSED |
Ballykisteen Hotel , Gotinstown , Limerick Junction |
1) to extend existing watermain network 2) Permission for Retention of a borehole/well, ancillary infrastructure and all associated site works... login required. |
Details... |
2.7km |
26/07/2023 |
CONDITIONAL |
Limerick Junction Railway Station , Limerick Junction , Co. Tipperary |
the removal of the existing metal storage containers, construction of a permanent single storey detached flat roofed modular building comprising of open plan and cellular offices with ancillary welfare facilities and... login required. |
Details... |
2.7km |
28/06/2023 |
N/A |
Limerick Junction Railway Station , Limerick Junction , Co. Tipperary |
the removal of the existing metal storage containers, construction of a permanent single storey detached flat roofed modular building comprising of open plan and cellular offices with ancillary welfare facilities and... login required. |
Details... |
2.6km |
03/05/2023 |
CONDITIONAL |
Limerick Junction , Co. Tipperary |
the upgrade of the Limerick Junction Wastewater Treatment Plant and will generally comprise the following: construction of a storm water holding tank complete with cleaning system and access stai... login required. |
Details... |
2.6km |
24/04/2023 |
N/A |
Limerick Junction , Co Tipperary |
construction of a storm water holding tank complete with cleaning system and access stairs and return pumping station; construction of a new sludge drying reed beds; sludge pump station; final effluent wash water pump station; control kiosk; and all ancillary site developments works... login required. |
Details... |
2.8km |
10/03/2023 |
CONDITIONAL |
Cauteen , Donohill , Co. Tipperary |
existing cattle shed with slatted tank as constructed and Permission for the construction of a storage barn to the rear of the site together with all associated site works... login required. |
Details... |
1.4km |
17/02/2023 |
CONDITIONAL |
Acraboy , Monard , Co. Tipperary |
(a) the construction of an all weather playing pitch (b) associated fencing and lighting (c) and including all associated site development works ... login required. |
Details... |
2.2km |
21/12/2022 |
CONDITIONAL |
Seskin , Co. Tipperary |
(i) alterations to site entrance, (ii) the boundary wall and piers to the south and west of the site, (iii) the internal wall to facilitate the ESB services, (iv) the hardcore gravel area, (v) the shed and storage container on site and associated site works ... login required. |
Details... |
3km |
07/10/2022 |
CONDITIONAL |
Oola Hills East , Oola |
an agricultural shed incorporating a slatted tank and all associated site works... login required. |
Details... |