1.8km |
18/08/2024 |
CONDITIONAL |
Rehill , Ballylooby Cahir , Co. Tipperary |
the construction of a cubicle house, associated concrete yards and site works. RETENTION PERMISSION for an associated underground slatted slurry storage tank... login required. |
Details... |
2.4km |
11/10/2023 |
CONDITIONAL |
Parkaderreen , Ballylooby , Cahir |
(i) change the use of an existing dwelling to a home office, home gym & store, (ii) construct a new dwelling, (iii) construct an entrance & to (iv) construct a waste water treatment system and all associated site development works... login required. |
Details... |
2.6km |
04/10/2023 |
CONDITIONAL |
Knockane (Nash) , Ballylooby , Cahir |
existing residential unit (mobile home) and continuance of use until construction work on proposed dwelling granted under PL. Ref 22293 is completed - and all other unauthorised ancillary site development works... login required. |
Details... |
2.6km |
09/08/2023 |
N/A |
Knockane (Nash) , Ballylooby , Cahir Co. Tipperary |
existing residential unit (mobile home) and continuance of use until construction work on proposed dwelling granted under PL. Ref 22293 is completed and all other unauthorised ancillary site development works... login required. |
Details... |
1.2km |
02/07/2023 |
CONDITIONAL |
Glengarra , Ballylooby , Cahir |
the construction of a dwelling, garage, entrance, waste water treatment system and all associated site development works ... login required. |
Details... |
3km |
01/04/2023 |
CONDITIONAL |
Inchnamuck , Ballylooby , Cahir |
to construct (i) two loose sheds with cattle crush and underground effluent tank (ii) concrete yard and all associated site works. Permission is also sought for retention of agricultural entrance and all associated site works... login required. |
Details... |
1.7km |
30/06/2022 |
CONDITIONAL |
Rossrehill , Ballylooby Cahir , Co. Tipperary |
a) 2 no. agricultural sheds and storage container, b) agricultural roadways, c) concrete base and permission to construct an agricultural extension to one shed including all associated site development works.... login required. |
Details... |
2.5km |
19/05/2022 |
CONDITIONAL |
Cloheenafishoge , Ballylooby , Cahir |
2 no. side extensions to existing dwelling house and permission to demolish existing agricultural single storey building inclusive of associated site works (Previous Planning reference P3/1816).... login required. |
Details... |
2.5km |
12/05/2022 |
N/A |
Cloheenafishoge , Ballylooby , Cahir |
2 no. side extensions to existing dwelling house and permission to demolish existing agricultural single storey building inclusive of associated site works (Previous Planning reference P3/1816).... login required. |
Details... |
2.6km |
14/04/2022 |
CONDITIONAL |
Knockane (Nash) , Ballylooby , Cahir |
to construct a dwelling garage, entrance, waste water treatment system.... login required. |
Details... |
770m |
17/11/2021 |
CONDITIONAL |
Glengarra , Burncourt , Co. Tipperary |
(i) construct extensions to an existing dwelling, (ii) construct a new waste water treatment system and all associated site works... login required. |
Details... |
610m |
27/09/2021 |
CONDITIONAL |
Glengarra , Ballylooby , Cahir |
construct a dwelling, entrance, waste water treatment system and all associated site development works... login required. |
Details... |
2.5km |
09/08/2021 |
CONDITIONAL |
Toor Beg , Burncourt , Co. Tipperary |
alterations and extension to existing dwelling including all associated site development works... login required. |
Details... |
3km |
16/06/2021 |
CONDITIONAL |
Burncourt Community Hall , Toorbeg , Burncourt Cahir |
construction of an open sided roofed structure and ancillary works... login required. |
Details... |
2.8km |
11/06/2021 |
CONDITIONAL |
Burncourt National School , Burncourt , Cahir |
construction of new 5m high ball-alley wall on the north east corner of the site and all associated site works... login required. |
Details... |
1.6km |
28/05/2021 |
CONDITIONAL |
Ballyhurrow , Burncourt , Cahir |
construction of a dwelling, entrance, wastewater treatment system and all associated site development works... login required. |
Details... |
1.3km |
25/05/2021 |
CONDITIONAL |
Glengarra , Ballylooby , Cahir |
construction of a dwelling, entrance, waste water treatment system and all associated site development works... login required. |
Details... |
1.9km |
10/05/2021 |
CONDITIONAL |
Ballyhurrow , Burncourt , Cahir |
(1) to retain indefinitely 2 no. storage containers, 1 timber shed, 2 no. dugout shelters, entrance gate, access roadway, carparking and turning bay site d... login required. |
Details... |
2.9km |
31/03/2021 |
CONDITIONAL |
Knockane (Nash) , Ballylooby , Cahir |
an existing telecommunications support structure (previously granted permission under South Tipperary County Council Pl. Ref. 11/405) together with antennas, dishes, equi... login required. |
Details... |