2.9km |
23/10/2024 |
N/A |
Castlebin East , New Inn , Ballinalsoe |
to 1; construct extension to existing milking facilities shed to cover existing slatted collection area. 2; Construct extension to existing slatted/cubicl... login required. |
Details... |
2.6km |
16/02/2024 |
CONDITIONAL |
RATHGLASS , NEW INN , Galway |
to create a new field entrance from the public road. Gross floor space of proposed works: 35sqm... login required. |
Details... |
2.1km |
16/02/2024 |
CONDITIONAL |
Killagh More , Kilconnell Ballinasloe , Co.Galway |
for existing two storey dwelling & detached garage. Permission for demolition of existing dwelling rear two storey block only. Minor alterations & renovation to existing dwelling & garage floor plans to reconfigure layout & alterations to existing elevations to suit. Full planning permission for single storey e... login required. |
Details... |
2.8km |
14/02/2024 |
CONDITIONAL |
Lisnamoltaun , New Inn , Ballinasloe |
to renovate dwelling house and storage shed and install wastewater treatment system to include all associated site works... login required. |
Details... |
2.6km |
22/12/2023 |
REFUSED |
CARTRONSHEELA , |
to construct a dwelling house, garage, treatment system, percolation area & associated site works. Gross floor space of proposed works: 294 sqm (House), 40 sqm (Garage... login required. |
Details... |
2.5km |
27/09/2023 |
CONDITIONAL |
Cappataggle , Ballinasloe , Co. Galway |
for proposed domestic dwelling, domestic garage, treatment plant, percolation area with all associated site works... login required. |
Details... |
2km |
18/08/2023 |
CONDITIONAL |
Eastwell Cappataggle , Ballinasloe , Co. Galway |
to construct a new domestic dwelling house along with domestic garage, new treatment system, percolation area & all ancillary site development works ... login required. |
Details... |
1.6km |
30/09/2022 |
CONDITIONAL |
Cappataggle , Cappataggle Ballinasloe , Co. Galway Ireland |
to install a ground mounted 130 kWh PV array system (approximately 300 photovoltaic panels) adjacent to the existing toll plaza building to supplement its current energy use, works to include PV mounting system, PV array, security fencing and all associated ancillary works.at ... login required. |
Details... |
2.5km |
08/08/2022 |
REFUSED |
DOONAREE , |
to demolish old house/store and construct a fully serviced private dwelling house with waste water treatment system and private garage/store to include all associated site works. Gross floor space of proposed works: House: 268.02sqm Garage/fuel shed: 53.94sqm... login required. |
Details... |
2.6km |
27/05/2022 |
REFUSED |
Cartronsheela , |
to construct a dwelling house (gross floor area 246sqm), garage, treatment system. percolation area and associated site works.... login required. |
Details... |
3km |
16/05/2022 |
CONDITIONAL |
CASTLEBIN EAST , |
for a development consisting of: permission for retention of a single storey, masonry constructed garage with a green metal profile roof to the rear of the existing property. Gross floor space of work to be retained: 27.3sqm.... login required. |
Details... |
3km |
28/03/2022 |
N/A |
Castlebin East , |
of a single storey, masonry constructed garage with a green metal profile roof to the rear of the existing property. Gross floor space of work to be retained: 27.3 sqm ... login required. |
Details... |
2.6km |
24/03/2022 |
CONDITIONAL |
Doonaree , |
for the construction of new dwelling along with garage, treatment septic tank system and all associated site works all . Gross floor space of proposed works 230 sqm.... login required. |
Details... |
2km |
17/02/2022 |
CONDITIONAL |
Eastwell , |
to construct a new dwelling, domestic garage, septic tank, treatment system and percolation area and all associated works. Gross floor space of proposed works: 227.9sqm + 35.5sqm... login required. |
Details... |
2.8km |
20/12/2021 |
CONDITIONAL |
BALLINTOBER WEST , |
to construct two detached dwelling houses; sewage treatment plants; and percolation areas. Gross floor space of proposed works: Plot 3: 198 sqm, Plot 4: 200 sqm.... login required. |
Details... |
1.1km |
20/12/2021 |
CONDITIONAL |
Gortnahoon , |
for the following development: a) Construction of a new dwelling, b) wastewater treatment system with percolation area, d) New site entrance and e) All associated external site works. Gross floor space of proposed works: 95.58 (house) sqm ... login required. |
Details... |
2.8km |
18/11/2021 |
CONDITIONAL |
Rooaun , |
to construct a fully serviced private dwelling house with waste water treatment system and private garage/fuel shed to include all associated site works. Gross floor space of proposed works: House: 231.23 sqm, Garage: 53.94 sqm.... login required. |
Details... |
2.4km |
08/10/2021 |
CONDITIONAL |
Cappataggle , |
for the construction of a dwelling house, domestic garage, treatment unit, percolation area and all associated site services. Gross floor space of proposed works: 249.82 sqm... login required. |
Details... |
1.9km |
06/10/2021 |
CONDITIONAL |
Cappataggle , |
to construct a new dwelling house, domestic garage, treatment unit with percolation area and all associated site works. Gross floor space of proposed works: House: 2332.1 sqm, 51.4 sqm.... login required. |
Details... |