320m |
23/10/2024 |
N/A |
Gort , Gort , Co. Galway |
for the demolition of existing dwelling house and the construction of six serviced dwelling houses. Gross floor space of proposed works: 536.71 sqm ... login required. |
Details... |
2.7km |
06/09/2024 |
CONDITIONAL |
Coole Demesne , Gort , Co Galway |
for the partial conversion of existing machinery shed to staff facilities building and all associated site works. The proposed development is located within the curtilage of a Protected Structure (RPS 410) Coole Park Visitor’s Centre. Gross floor space of proposed works: 56.30 sqm... login required. |
Details... |
1.3km |
27/08/2024 |
N/A |
Glenbrack , Gort , Galway |
for the construction of a dwelling and detached garage including a proposed wastewater treatment system with percolation area, a new road access & associated site services/landscaping. Gross floor space of proposed work: 283 sqm (house) & 45.00 sqm (garage) ... login required. |
Details... |
430m |
13/08/2024 |
CONDITIONAL |
Ballyhugh , AIB Market Square , Gort Co. Galway |
to extend the existing ramp to facilitate access at ground floor level for (Protected Structure N.I.A.H. 30341019). The extended ramp will include new handrail all to match existing in situ... login required. |
Details... |
1.1km |
08/08/2024 |
N/A |
14 St Coleman's Terrace , Ennis Road , Gort Co Galway |
for the demolition of existing rear extension and the construction of a new rear two
storey extension and associated works. Gross floor space of proposed works: 54.42 sqm. Gross floor space of any demolition: 22.44 sqm... login required. |
Details... |
1km |
19/07/2024 |
CONDITIONAL |
Glenbrack , Gort , Co. Galway |
for the construction of a new entrance and access roadway to service existing dwelling house... login required. |
Details... |
2.8km |
11/07/2024 |
CONDITIONAL |
Coole Demesne , Coole Haven , Co. Galway |
to construct an indoor horse training arena, a lunge ring and horse walker within existing farmyard complex. Gross floor space of proposed works: 314.00 sqm (horse walker), 2,058.00 sqm (horse arena) & 109.00 sqm (lunge area) ... login required. |
Details... |
520m |
04/07/2024 |
CONDITIONAL |
Ballyhugh , Bridge St Gort , Co Galway |
for the demolition of rear domestic extension and retention and completion of rear domestic extension and alterations. Gross floor space of work to be retained: 61.46 sqm. Gross floor space of any demolition: 23.60 sqm... login required. |
Details... |
1.3km |
01/07/2024 |
N/A |
Ballyhugh , Tubber Rd , Gort |
and completion of 8 dwelling houses - 9 to 16 inclusive Garraí Mhic Aodha, and to construct 32 dwelling houses - 17 to 20 inclusive Garraí Mhic Aodha and 1 to 28 inclusive Gort An Choirce. Gross floor space of proposed works: 2,969.86 sqm... login required. |
Details... |
2.7km |
24/06/2024 |
CONDITIONAL |
Coole Park Nature Reserve , Coole Demesne , GORT Co. Galway |
for restoration & repair of an old applestore within the former vegetable garden at Coole Park. Works to include reinstatement of a slate covered roof, an internal floor, and fit-out fo... login required. |
Details... |
400m |
23/05/2024 |
N/A |
Gort , Slipper Street , Co Galway |
for the renovation and reconstruction of an existing derelict dwelling and connect to the public services. The premises is listed in the National Inventory of Architectural Heritage (NIAH) under No 30341024 Gort Cavalry Barracks. Gross floor space of proposed works: 118.00 sqm... login required. |
Details... |
1.3km |
09/04/2024 |
CONDITIONAL |
Rindifin , Site 1 , Gort Co Galway |
of additional floor space and elevation alterations on Site 1. Gross floor space of work to be retained: 28.10 sqm... login required. |
Details... |
600m |
09/04/2024 |
CONDITIONAL |
Gort , 36 The Maples , Gort |
of a dwelling house. Gross floor space of work to be retained: 156 sqm... login required. |
Details... |
520m |
25/03/2024 |
CONDITIONAL |
Lavally , Station Rd , Gort |
of a single story lean to shed extension of 535.8 sqm, open on 2 No sides and used for the storage of building materials over an area that was previously used... login required. |
Details... |
440m |
22/03/2024 |
N/A |
Gort , Gallagher's Lane , Co. Galway |
for the construction of 21 no. residential units comprising of 9 no. 2 bed 2 storey family dwellings, 4 no. 2 bed single storey age friendly units and 8 no. 3 bed 2.5 storey family dwellings, vehicular entrance to Glenbrack Road, new attenuation & connection into existin... login required. |
Details... |
1.3km |
21/02/2024 |
N/A |
Rindifin , Site 1 Rinn Dúin , Gort Co Galway |
of additional floor space and elevation alterations on Site 1. Gross floor space of work to be retained: 28.10 sqm... login required. |
Details... |
1000m |
09/02/2024 |
CONDITIONAL |
Glenbrack , Gort , Co. Galway |
for the construction of a dwelling house, detached garage, treatment plant and percolation area and all associated site works. Gross floor space of proposed works: 252.1 sqm (house) & 24 sqm (garage)... login required. |
Details... |
690m |
02/02/2024 |
CONDITIONAL |
Lavally , Loughrea Road , Gort |
for the application being made under the provisions of the Planning and Development (Amendment) (Large Scale Residential Development) Act 2021. The development will consist of the following: 1. The provision of 234 no. residential units, comprised of the following: a. 144 no. 3-bed houses; b. 31 no. 4-bed houses;
c. 11 no. 2-bed duplexes; d. 11 no. 3-bed duplexes; e. 19 no. 1-bed senior living apartments; f. 5 no. 2-bed senior living apartments; g. 3 no. 1-bed apartments; and
h. 10 no. 2-bed apartments. 2. The provision of 4,186 sq.m of commercial floor space, comprised of 1 no. café unit (130 sqm), 5 no. retail units (1,029 sqm), co-working office spaces and associated lobby (1,595 sqm), Senior Living Communal amenity spaces (292 sqm), creche (333 sqm) and 1 no. activity centre (807 sqm). 3. The provision of a pedestrian an... login required. |
Details... |
1.2km |
05/01/2024 |
CONDITIONAL |
Rindifin , Gort Community School , Co Galway |
for the Refurbishment and Extension. The proposed development includes the following - i) Construction of a three-storey school extension c.5,878m2 to provide teaching spaces and school support facilities including a three classroom Special Education Unit, ii) Construction of link building connecting the existing school building with three-storey school extension at first floor level, iii) Refurbishment and extension of existing single and two storey school building including part demolition of single storey block to provide central assembly space, iv) Refurbishment and extension of the standalone single-storey building known as ‘The Covid Building’ including modifications to building elevations to provide a multi-use hall and ground floor connection to the adjacent two-storey building known as ‘The Noone Building’, v) Refurbishment and part demolition of standalone two-storey building known as ‘The Noone Building’ including modification to building elevations to provide changing facilities, fitness suite, WC’s and all associated teaching facilities and circulation, vi) Construction of new access roadway an... login required. |
Details... |
710m |
05/01/2024 |
CONDITIONAL |
Glenbrack , Gort , Co Galway |
and completion of alterations to previously permitted development planning reference 21/2376. Gross floor space of proposed works: 58.28 sqm. Gross floor space of work to be retained: 193.98 sqm ... login required. |
Details... |