1km |
16/10/2024 |
N/A |
Kilfeilim , Spancilhill , Co Clare |
for development, the development consists of the construction of a slatted unit and associated site works... login required. |
Details... |
370m |
08/07/2024 |
REFUSED |
Muckinish , Spancil Hill , Ennis Co. Clare |
for development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works... login required. |
Details... |
270m |
17/06/2024 |
CONDITIONAL |
Muckinish , Spancilhill , Co Clare |
for development of a livestock slatted unit with associated ancillary siteworks... login required. |
Details... |
2.8km |
16/05/2024 |
CONDITIONAL |
Moyriesk , Quin , Co. Clare |
to change design of private dwelling house and garage as previously granted under Planning Register Reference P23/60262 and all associated site works ... login required. |
Details... |
1.6km |
14/05/2024 |
CONDITIONAL |
Creggaun/ Ballyortla South , Ennis , Co. Clare |
to construct a dwelling house, garage, entrance, driveway, wastewater treatment system and all associated site works... login required. |
Details... |
2.8km |
28/03/2024 |
CONDITIONAL |
Moyriesk , Quin , Co. Clare |
of (a) rear first floor dormer windows and porch canopy, (b) roof windows, (c) enlarged domestic garage, (d) garden shed, (e) front boundary wall and entrance, together with all associated site development works and services... login required. |
Details... |
1.6km |
30/01/2024 |
CONDITIONAL |
Cranagher , Quin , Ennis Co Clare |
to: 1) Revise the Site Boundaries and 2) retain a storage shed as constructed and associated site works... login required. |
Details... |
2.3km |
18/12/2023 |
CONDITIONAL |
Cappaghbeg , Barefield , Co Clare |
to construct dwelling house, garage , proprietary treatment system, bored well and carry out ancillary site works ... login required. |
Details... |
2.1km |
14/12/2023 |
N/A |
Tooreen , Ennis , Co Clare |
for development, the development will consist of a new dwelling house, new garage, new site entrance and wastewater site works and below ground... login required. |
Details... |
3km |
29/11/2023 |
CONDITIONAL |
St. Joseph’s Doora Barefield GAA Club , Gurteen Doora , Ennis Co. Clare. |
to apply for a 5 year temporary permission for the construction of a temporary primary school consisting of 7 No. temporary prefabricated buildings to accommod... login required. |
Details... |
2.8km |
20/07/2023 |
CONDITIONAL |
Moyriesk , Quin , Co. Clare |
to construct a private dwelling house with detached garage, installation of new wastewater treatment system and percolation area and all associated site works... login required. |
Details... |
2.7km |
23/06/2023 |
REFUSED |
Knockanoura Td , Carrahan , Tulla Co Clare |
of a) storage of construction material on lands previously used for extraction of quarry stone and b) RETENTION of commercial gate which replaced agricultural gates on lands... login required. |
Details... |
1.6km |
12/06/2023 |
CONDITIONAL |
Cahershaughnessy Td , Quin , Co Clare V95 T2K8 |
of a)modifications and extensions to private dwelinghouse / garage/ boiler house b)site boundaries / site layout as constructed c)PERMISSION to upgrade existing sewage treatment system along with all associated site works and services... login required. |
Details... |
2.2km |
08/06/2023 |
CONDITIONAL |
Knockanoura , Clooney , Co. Clare |
of shed and fuel store as constructed together with all associated site development works and services... login required. |
Details... |
2.1km |
24/05/2023 |
CONDITIONAL |
Scoil Naisunta Cnoc an Ein (Knockanean National School) , Knockanean , Ennis Co Clare V95 FW42 |
the development will consist of: 1) The installation of an external heat pump, to the rear of the proposed new school building (Planning Ref: P19/961) 2) The construction of a 2.6 m high acoustically insulated compound enclosure, of approx 45m2. 3) All associated site works ... login required. |
Details... |
2.6km |
22/03/2023 |
N/A |
Cappagh Beg , Barefield , Co Clare |
to construct a dwelling house, and garage, with effluent treatment system , new entrance from pubic road, and all associated site works ... login required. |
Details... |
2.6km |
22/03/2023 |
N/A |
Cappagh Beg , Barefield , Co Clare |
to construct a dwelling house, and garage with effluent treatment system, new entrance from public road, and all associated site works... login required. |
Details... |
140m |
08/03/2023 |
CONDITIONAL |
Muckinish , Spancil Hill , Ennis |
(Planning ref. No. P22 480) which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works ... login required. |
Details... |
1.1km |
22/12/2022 |
REFUSED |
Knockaluskraun , Barefield , Ennis Co Clare |
to construct a new dwelling house, site entrance, access road, private on-site wastewater treatment system, private bored well and all associated site works and services... login required. |
Details... |