2km |
02/08/2024 |
CONDITIONAL |
Doonsallagh East , Miltown Malbay , Co Clare |
to erect agricultural storage shed... login required. |
Details... |
2.3km |
30/05/2024 |
CONDITIONAL |
Tooreen , Miltown Malbay , Co. Clare. |
to extend and renovate the existing dwelling house along with elevation changes to the house and to construct a new wastewater treatment system along with all associated site works and services... login required. |
Details... |
2km |
27/05/2024 |
REFUSED |
Cloghaun Beg , Miltown Malbay , Co Clare |
to erect agricultural storage shed and new site entrance... login required. |
Details... |
2.4km |
10/05/2024 |
CONDITIONAL |
Ballynew , Miltown Malbay , Co Clare |
for the development of a domestic garage ancillary to dwelling house granted permission under planning reference P23/617 together with ancillary site works... login required. |
Details... |
2.4km |
19/02/2024 |
CONDITIONAL |
Booladuff , Inagh , Co Clare |
to build a shed to store farm machinery and all associated site and ancillary works ... login required. |
Details... |
2.4km |
08/12/2023 |
CONDITIONAL |
Ballynew , Miltown Malbay , Co Clare |
the development will consist of a dwelling house with proprietary wastewater treatment system and polishing filter, new entrance at public road and upgraded access way along existing agricultural track together with ancillary site works ... login required. |
Details... |
2.9km |
13/11/2023 |
CONDITIONAL |
Cloghaun More , Miltown Malbay , Co Clare |
(Reference No P23/384) to construct a dwelling house and garage, with effluent treatment system, new entrance from public road with planted earthen berm side and rear boundaries, and all associated site works... login required. |
Details... |
2.4km |
10/11/2023 |
N/A |
Ballynew , Miltown Malbay , Co. Clare |
for development which will consist of a dwelling house with proprietary wastewater treatment system and polishing filter together with ancillary site works... login required. |
Details... |
2.9km |
05/07/2023 |
CONDITIONAL |
Cloghaun More , Miltown Malbay , Co Clare |
to construct a dwelling house and garage, with effluent treatment system, new entrance from public road, with planted earthen berm side and rear boundaries and all associated site works... login required. |
Details... |
2.3km |
09/11/2022 |
CONDITIONAL |
Tooreen , Miltown Malbay , Co Clare |
to construct a dwelling house, garage and proprietary waste water treatment system along with ancillary site works... login required. |
Details... |
3km |
24/03/2022 |
CONDITIONAL |
Cloonanaha , Inagh , Co Clare |
for the following works, (A) construct porch to front of dwelling, (B) construct extension to side of dwelling, (C) construct porch to rear of dwelling, and (D) make changes to the layout of existing dwelling house, all with associated site works ... login required. |
Details... |
1.7km |
15/02/2022 |
CONDITIONAL |
Cloughaun More Td , Miltown Malbay , Co Clare |
to upgrade / improve existing access road for the purposes of extracting timber... login required. |
Details... |
2.2km |
15/12/2021 |
CONDITIONAL |
Glendine North , Miltown Malbay , Co Clare |
to construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works... login required. |
Details... |
2.9km |
24/06/2021 |
CONDITIONAL |
Knockacarron , Miltown Malbay , Co Clare |
to construct an extension to the existing house and associated site works.... login required. |
Details... |
20m |
19/04/2021 |
REFUSED |
Glendine North Fahanlunaghta More Curraghodea , Letterkelly Cloghaun More Cloghaun Beg Tooreen Silverhill , Doonsallagh East Shanavogh East and Knockalassa Co Clare |
for a ten-year planning permission for the construction of a renewable energy development, in the townlands of Glendine North, Fahanlunaghta More, Curraghodea, Letterkelly, Cloghaun More, Cloghaun Beg, Tooreen, Silverhill, Doonsallagh East, Shavavogh East and Knockalassa, Co Clare (approximately 6.5km to the east of Miltown malbay), The development will consist of the provision of the following I. Up to 8 no. wind turbines with a maximum overall ground to blade tip height of up to 175 metres; ii. A thirty-year operational life from the date of full commissioning of the development and subsequent decommissioning. iii. A Meteorological mast with a maximum height of up to 30 metres; iv. Underground cabling (33kV) connecting the proposed... login required. |
Details... |