1.5km |
12/11/2024 |
N/A |
Fort Henry Business Park , Ballina , Co. Tipperary |
a single storey extension to the northern end of the Production/Administration Building, new single storey link corridor between Production/Administration Building and Warehouse, new single storey extension accessed from new link corridor, relocation of containerised refrigeration unit from the northern end of Production/Administration Building to be connected to new link corridor, new first floor windows to... login required. |
Details... |
860m |
11/11/2024 |
N/A |
10 Ard Lua , Ballina , Co Tipperary |
a single storey extension to the rear of the property... login required. |
Details... |
1.2km |
05/11/2024 |
N/A |
Portroe Road , Ballina , Co. Tipperary |
change use of premises from existing office use to residential use... login required. |
Details... |
1.6km |
17/10/2024 |
N/A |
Technopath Manufacturing Ltd , Fort Henry Business Park , Ballina |
- A single storey extension to the northern end of the Production/Administration Building - New single storey link corridor between Production/Administration Building and Warehouse - New single storey extension accessed from new Link Corridor - Retention of existing single storey refrigeration building with new connection to new corridor - Relocation of containerised refrigeration unit from the northern end ... login required. |
Details... |
1.1km |
04/10/2024 |
N/A |
Moys Clarisford , Killaloe , Co Clare |
for minor modifications to the elevations of the building previously granted planning permission under ref. no: P21/212. Modifications include: removal of two number windows on the west elevation: removal o... login required. |
Details... |
2km |
19/09/2024 |
CONDITIONAL |
20 Marine Village , Ballina , Co. Tipperary |
to extend and renovate existing dwelling... login required. |
Details... |
2km |
12/09/2024 |
N/A |
20 Marine Village , Ballina , Co. Tipperary |
extension and renovation of the existing dwelling... login required. |
Details... |
2km |
05/09/2024 |
N/A |
58 Lakelands , Cullinagh , Ballina Co. Tipperary |
the erection of a garage/garden shed with loft and all associated site works... login required. |
Details... |
1.7km |
05/09/2024 |
REFUSED |
Moys , Killaloe , Co. Clare |
to develop swimming platform, yoga deck, outdoor recreation area and changing stalls associated site works. A Natura Impact Statement accompanies this application... login required. |
Details... |
2km |
04/09/2024 |
N/A |
58 Lakelands , Cullinagh , Ballina Co. Tipperary |
to erect a garage /garden shed with loft and all associated site works ... login required. |
Details... |
2.8km |
29/08/2024 |
N/A |
Kilmastulla , Birdhill Nenagh , Co. Tipperary |
the construction of a vehicular entrance, single storey dwelling house, domestic wastewater treatment system with polishing filter, together with all associated site works... login required. |
Details... |
1.8km |
15/08/2024 |
CONDITIONAL |
Shantraud , Killaloe , Co Clare |
for development at the site at Shantraud, Killaloe, Co. Clare. The development will consist of the construction of a single storey dwelling house, entrance from public road, driveway, connection to group water scheme, sewerage treatment system and all associated site works.... login required. |
Details... |
1.3km |
15/08/2024 |
REFUSED |
Bridge Street , Killaloe , Co. Clare |
and completion of extension to the rear of house and all associated site works ... login required. |
Details... |
1.7km |
05/08/2024 |
N/A |
Gortglassabrien , Ballina , Co. Tipperary |
the construction of a dwelling house, garage, entrance, driveway, installation of a septic tank and percolation area and all associated site works... login required. |
Details... |
2.7km |
01/08/2024 |
CONDITIONAL |
Cloonfadda tld. , Killaloe , Co.Clare |
to refurbish an existing house and to construct a ground floor and a dormer roof extension, which includes the provision of a supported living accommodation unit, and all associated site works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this application.... login required. |
Details... |
1.5km |
26/07/2024 |
N/A |
Technopath Life Sciences Park , Fort Henry , Ballina Co. Tipperary |
a new wastewater treatment system with over ground tankage up to 6.5m high with ancillary works such as drainage, roads, fencing and landscaping at the existing facility... login required. |
Details... |
1.4km |
20/07/2024 |
N/A |
Brook Lodge , Ballina , Co. Tipperary |
an extension to rear of dwelling, the conversion of the garage and basement to living area and the construction of a storage shed to rear of dwelling... login required. |
Details... |
1.9km |
12/07/2024 |
CONDITIONAL |
Grange , Ballina , Co. Tipperary |
upgrade of wastewater system and conversion of existing attic space to living space along with all ancillary site works and RETENTION PERMISSION for extension previously constructed to dwelling... login required. |
Details... |
1.8km |
09/07/2024 |
CONDITIONAL |
The Lakes Retirement Village , Hill Road , Killaloe |
for the following development at Apartments No. 9 and No. 13, The Lakes Retirement Village. 1. Development of attic conversion comprising bedroom and bathroom. 2. Fit 3 No. velux rooflights to front elevation and 3. Construct new stairase from first floor to attic... login required. |
Details... |